| 1 |
21 Nov 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Pengukuran suhu motor Gsu-01
Motor drive belt feeder 36
Holding
Drive 59
Bearing 40
Fan 36
Closing
Drive 51
Bearing 39
Fan 46
Trolley
Drive 49
Bearing 38
Fan 47
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 2 |
21 Nov 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Penggantian filter motor fan holding closing trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 3 |
14 Nov 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lubrikasi underspeed GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 4 |
14 Nov 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran suhu motor belt feeder GSU-01 :
Drive 37,9 derajat celcius
Bearing 35,7 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 5 |
11 Nov 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran suhu trafo GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 6 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran jalur input zerospeed GSU-01 sistem 1 PBCN 01 (hasil ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 7 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran jalur input zerospeed GSU-01 sistem 2 PBCN 02 (hasil ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 8 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor drive closing GSU 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 9 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning magnet switch GSU 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 10 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning zerospeed sistem 1&2 GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 11 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor gate power pack dan panel gate powerpack GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 12 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Motor creeper gantry GSU 01 tidak 3pcs, 1pcs sebelah laut dan 2pcs sebelah darat
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU |
|
Ready to Use |
|
| 13 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor drive trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 14 |
30 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 15 |
30 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor drive holding, closing dan trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 16 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 17 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 18 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 34.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 19 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 42.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 20 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 41.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 21 |
07 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Penggantian filter motor fan holding, closing, dan trolley di area motor room GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 22 |
07 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 23 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 24 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 25 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 27.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 26 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 43.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 27 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 29.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 28 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 29 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 30 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 30.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 31 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 42.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 32 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 34.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 33 |
25 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-01 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 34 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.08:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 35 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.07:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 36 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.06:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 37 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.05:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 38 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.04:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 39 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.03:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 40 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.02:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 41 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.01:
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 42 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengecekkan lidah kontaktor holding closing trolley GSU-01 (kondisi kontaktor ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 43 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor drive holding closing dan trolley GSU 01
Note: filter GSU 01 terpantau masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 44 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor gate power pack GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 45 |
27 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Motor Gantry Nomor 2 (Sisi Laut arah Anyer)
U1 - G : 550 Mohm
V1 - G : 550 Mohm
W1 - G : 550 Mohm
U2 - G : 550 Mohm
V2 - G : 550 Mohm
W2 - G : 550 Mohm
Antar Phase
U1 - U2 : 0 Mohm
U1 - V2 : 550 Mohm
U1 - W2 : 550 Mohm
V1 - V2 : 0 Mohm
V1 - U2 : 550 Mohm
V1 - W2 : 550 Mohm
W1 - W2 : 0 Mohm
W1 - U2 : 550 Mohm
W1 - V2 : 550 Mohm
Hasil Megger motor dinyatakan bagus (OK)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 46 |
27 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Pengecekan & Cleaning seluruh Motor Gantry sisi darat di GSU-01 (Hasil Megger OK = 550 MOhm)
Untuk motor gantry sebelah darat yang mengalami korosi sudah di bersihkan dan di amplas.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 47 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 48 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 49 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 34.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|
| 50 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 36.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK |
|
Ready to Use |
|