71 laporan ditemukan · 10 belum selesai
| NO | Tanggal / Petugas | Lokasi | Keterangan Aktivitas | Kondisi & Rekomendasi | Notifikasi | Dokumentasi | Status | Aksi |
|---|---|---|---|---|---|---|---|---|
| 1 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Tombol Sakelar untuk Cabin Flood Light di panel ruang cabin operator rusak. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019600 |
In Process |
||
| 2 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Stop kontak 220VAC di cabin operator pong. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019602 |
In Process |
||
| 3 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Lampu indikator untuk tombol Hopper Gate Open di cabin operator mati 1 pcs. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019601 |
In Process |
||
| 4 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing
kondisi ok di GSU-05 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 5 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding,
kondisi ok di GSU-05 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 6 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch boom
kondisi ok di GSU-05 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 7 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lampu LED 18 watt ruang motor room mati 6 pcs GSU-05, rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019593 |
In Process |
||
| 8 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengukuran suhu ruang panel elektrik GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 9 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 10 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 11 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning dan lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 12 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Panel lift GSU-05 kotor, rekues cleaning
Fan panel GSU-05 kotor, rekues cleaning |
LAIK PAKAI
REQUEST BERSIHKAN
|
Medium 130000019598 |
In Process |
||
| 13 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning dan lubrikasi zerospeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 14 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengukuran suhu ruang panel elektrik GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 15 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 16 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 17 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch boom terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 18 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lampu LED walkways boom 18watt mati 35 pcs. GSU-05 request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 19 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi motor gate Hooper GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 20 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 21 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 22 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch boom terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 23 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 24 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU 05 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 25 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 26 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Pintu panel auxiliary engselnya patah, rekues repair
|
RELEASE
BY EXECUTOR
|
Medium 130000019327 |
Completed |
||
| 27 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning dan lubrikasi underspeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 28 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Pengencengan baut panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 29 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Lampu boom sebelah anyer GSU-05 mati 1 pcs
|
RELEASE
BY EXECUTOR
|
Medium 130000019326 |
Completed |
||
| 30 |
22 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Melakukan inspeksi elektrik di area Dermaga 5, Pengecekan trafo, Panel power lampu penerangan, dan lampu penerangan. Kondisi lampu penerang D5 sudah OK (nyala) untuk semua tiang.
Tiang 1 dan 3 dari Anyer menggunakan fotocell (beda jalur dengan tiang lainnya). |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 31 |
22 Sep 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 32 |
22 Sep 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 33 |
22 Sep 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Pengukuran suhu ruang panel GSU-05 : 34.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 34 |
22 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pipa kabel lampu handrail hopper GSU-05 patah dan posisi ngegantung ke bawah (langsung action, pipa kabel sudah pada posisi sebelumnya)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 35 |
22 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 36 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor gantry GSU 05 no 01 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 37 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 38 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Karet coupling motor kabel drum GSU 05 tipis , request ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000019005 |
Completed |
||
| 39 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU 05 luka/sobek , langsung action , sementara di rubber lalu di vinyl
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 40 |
20 Aug 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 41 |
20 Aug 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 42 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 43 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 44 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning underspeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 45 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU 05 luka/sobek , langsung action , sementara di rubber lalu di vinyl
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 46 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 47 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 48 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 49 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 50 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 51 |
02 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Hasil Megger Motor Trolley GSU 05 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 52 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Motor vibrating sebelah Anyer GSU 05 , tidak ada skun nyaa , request penambahan skun
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000018502 |
In Process |
||
| 53 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor closing GSU 05 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 54 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor holding GSU 05 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 55 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor Boom GSU 05 :
U1 - G : 180 Mohm V1 - G : 174 Mohm W1 - G : 140 Mohm U2 - G : 150 Mohm V2 - G : 160 Mohm W2 - G : 170 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 242 Mohm U1 - W2 : 240 Mohm V1 - V2 : 0 Mohm V1 - U2 : 230 Mohm V1 - W2 : 244 Mohm W1 - W2 : 0 Mohm W1 - U2 : 236 Mohm W1 - V2 : 245 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 56 |
02 Jun 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 57 |
02 Jun 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 58 |
21 May 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 59 |
21 May 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 60 |
21 May 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding dan closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 61 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 62 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 63 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Cam switch holding dan closing terpantau OK di GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 64 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Roll festune cabin operator Kendor di GSU 05 ( langsung action ), dokumentasi before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 65 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 66 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Motor gantry GSU 05 tidak terpasang 1pcs no 2 Darii darat
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 67 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Bearing roll festune cabin GSU 05 tidak terpasang 1 pcs no 2 Dari cabin
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000015110 |
In Process |
||
| 68 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU-05 luka, langsung action di rubber lalu di vinyl
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
Medium 130000017798 |
In Process |
||
| 69 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning zerospeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 70 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning zerospeed GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 71 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Posisi sensor proximity tidak ada dudukannya GSU-05, Rekues penambahan dudukan
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017586 |
In Process |