2193 laporan ditemukan · 468 belum selesai
| NO | Tanggal / Petugas | Lokasi | Keterangan Aktivitas | Kondisi & Rekomendasi | Notifikasi | Dokumentasi | Status | Aksi |
|---|---|---|---|---|---|---|---|---|
| 1 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Hydrant no 2 D4.2
Hydrant no 2 Dermaga 4.2 Ready to use |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 2 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Hydrant no 1 D4.2
Hydrant no 1 Dermaga 4.2 Ready to use |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 3 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Hydrant no 2 D4.1
Hydrant no 2 Dermaga 4.1 Ready to use |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 4 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Hydrant no 1 D4.1
Hydrant no 1 Dermaga 4.1 Ready to use, Cover Hydrant mengalami deformasi/bengkok pada sisi laut |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 5 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Bollard No 6 Dermaga 4.1
Kondisi bollard no 6 Dermaga 4.1 mengalami korosi dan cat amercoat sudah mengelupas dan memudar, Request pembersihan korosi dan pengecetan ulang |
LAIK PAKAI
REQUEST REPAIR
|
Low 130000019636 |
In Process |
||
| 6 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Bollard No 5 Dermaga 4.1
Kondisi bollard no 5 Dermaga 4.1 mengalami korosi dan cat amercoat tidak ada, Request pembersihan korosi dan pengecetan ulang |
LAIK PAKAI
REQUEST REPAIR
|
Low 130000019635 |
In Process |
||
| 7 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Bollard No 4 Dermaga 4.1
Kondisi bollard no 4 Dermaga 4.1 mengalami korosi dan cat amercoat tidak ada, Request pembersihan korosi dan pengecetan ulang |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
Low 130000019634 |
In Process |
||
| 8 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Bollard No 3 Dermaga 4.1
Kondisi bollard no 3 Dermaga 4.1 mengalami korosi dan cat amercoat tidak ada, Request pembersihan korosi dan pengecetan ulang |
LAIK PAKAI
REQUEST REPAIR
|
Low 130000019633 |
In Process |
||
| 9 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Bollard No 2 Dermaga 4.1
Kondisi bollard no 2 Dermaga 4.1 mengalami korosi dan cat amercoat tidak ada, Request pembersihan korosi dan pengecetan ulang |
LAIK PAKAI
REQUEST REPAIR
|
Low 130000019632 |
In Process |
||
| 10 |
20 Nov 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Bollard No 1 Dermaga 4.1
Kondisi bollard no 1 Dermaga 4.1 mengalami korosi dan cat amercoat sudah memudar, Request pembersihan korosi dan pengecetan ulang |
LAIK PAKAI
REQUEST REPAIR
|
Low 130000019631 |
In Process |
||
| 11 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 12 Dermaga 3
Terdapat guratan pada leher cell rubber fender sisi darat dan laut, Frontal pad terkikis |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 12 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 11 Dermaga 3
Terdapat guratan pada leher cell rubber fender sisi darat dan laut, Frontal pad terkikis |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 13 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 10 Dermaga 3
Terdapat guratan pada leher cell rubber fender sisi darat dan laut, Frame fender mengalami korosi ringan, konstruksi bagian atas sisi anyer melengkung/deformasi, Frontal pad terkikis parah pada bagian atas dan 3 pcs frontal pad tidak ada pada bagian atas dan bawah Notif frontal pad : 130000019623 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 14 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 9 Dermaga 3
Ready ro use, Frontal pad terkikis |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 15 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 8 Dermaga 3
Terdapat guratan pada leher cell rubber fender sisi darat dan laut (sisi darat yang mengalami kerusakan sangat parah), Frontal pad terkikis parah dan 1 pcs frontal pad bagian tengah sisi anyer tidak ada Notif frontal pad : 130000019622 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 16 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 7 Dermaga 3
Terdapat guratan pada leher cell rubber sisi darat, Frontal pad terkikis |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 17 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 6 Dermaga 3
Terdapat guratan pada bagian tengah cell rubber, Frontal pad terkikis parah |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 18 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 5 Dermaga 3
Frontal pad terkikis parah dan 1 pcs frontal pad bagian atas sisi anyer tidak ada Notif frontal pad : 130000019621 |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 19 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 4 Dermaga 3
Terdapat guratan pada bagian tengah dan leher cell rubber fender sisi laut, Frontal pad terkikis |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 20 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 3 Dermaga 3
Terdapat guratan pada bagian tengah dan leher cell rubber fender sisi darat dan laut, Frontal pad terkikis |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 21 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 2 Dermaga 3
Terdapat guratan pada leher rubber cell fender sisi darat dan laut, Frontal pad terkikis dan 6 pcs frontal pad bagian tengah tidaK ada Notif frontal pad : 130000019620 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 22 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Fender no 1 Dermaga 3
Tidak ada |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 23 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Hydrant No 3 Dermaga 3
Hydrant No 3 Dermaga 3 kotor karena sisa material batu bara dan bisa membuat saluran pembuangan air macet hingga membuat hydrant tergenang air |
KOTOR
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 24 |
19 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Hydrant No 4 Dermaga 3
Hydrant No 4 Dermaga 3 tertimbun material batu bara |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000019619 |
In Process |
||
| 25 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Catladder Mooring Dolphine D7.3
Korosi bagian bawah |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 26 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Catladder no 1 D7.3
Korosi bagian bawah dan tidak ada handrails |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 27 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 11 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 28 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 10 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 29 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 9 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 30 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 8 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 31 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 7 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 32 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 6 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 33 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 5 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 34 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 4 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 35 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 3 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 36 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 2 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 37 |
18 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Bollard No. 1 Dermaga 7.3
Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 38 |
17 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Beton Lantai Trestle Dermaga 5
Kondisi beton lantai trestle dermaga 5 cukup baik, tidak ada yang mengalami spalling. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 39 |
17 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Beton Lantai Dermaga 5
Kondisi beton lantai dermaga cukup baik, tidak ada yang mengalami spalling. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 40 |
17 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Balok Tepi Dermaga 5
Terdapat 5 titik kerusakan beton balok tepi di dermaga 5 diantara bollard 9 dan 10 / fender 17 - 18. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019604 |
In Process |
||
| 41 |
17 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Balok Tepi Dermaga 5
Terdapat 8 titik kerusakan beton balok tepi di dermaga 5 diantara bollard 8 dan 9 / fender 16 - 17. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019603 |
In Process |
||
| 42 |
17 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Balok Tepi Dermaga 5
Terdapat 10 titik kerusakan beton balok tepi di dermaga 5 diantara bollard 3 dan 4 / fender 5 - 7. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000018997 |
In Process |
||
| 43 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 7 Dermaga 1.8
Catladder korosi berat di bagian tengah hingga membuat anak tanggak hilang, sudah tidak laik pakai dan tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 44 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 6 Dermaga 1.8
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 45 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 5 Dermaga 1.8
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 46 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 4 Dermaga 1.8
Catladder korosi berat di bagian tengah hingga membuat anak tanggak hilang, sudah tidak laik pakai dan tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 47 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 3 Dermaga 1.8
Catladder korosi berat di bagian tengah hingga membuat anak tanggak hilang, sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 48 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 2 Dermaga 1.8
Catladder korosi berat di bagian tengah hingga membuat anak tanggak hilang, sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 49 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Catladder No. 1 Dermaga 1.8
Catladder korosi berat, sudah tidak layak pakai dan tidak ada handrails. |
RUSAK BERAT
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 50 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Catladder No. 6 Dermaga 1.7
Catladder korosi berat di bagian tengah hingga membuat anak tanggak hilang, sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 51 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Catladder No. 5 Dermaga 1.7
Catladder korosi berat di bagian tengah dan sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 52 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Catladder No. 4 Dermaga 1.7
Catladder korosi berat dan sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 53 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Catladder No. 3 Dermaga 1.7
Catladder korosi berat dan sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 54 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Catladder No. 2 Dermaga 1.7
Catladder korosi berat dan sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 55 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Catladder No. 1 Dermaga 1.7
Catladder korosi berat dan sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 56 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Catladder No. 9 Dermaga 1.6
Catladder korosi berat dan sudah tidak laik pakai. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 57 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Catladder No. 8 Dermaga 1.6
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 58 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Catladder No. 7 Dermaga 1.6
Tidak ada catladder. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 59 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Catladder No. 6 Dermaga 1.6
Tidak ada catladder. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 60 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Catladder No. 5 Dermaga 1.5
Tidak ada catladder. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 61 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Catladder No. 4 Dermaga 1.5
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 62 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Catladder No. 3 Dermaga 1.5
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 63 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Catladder No. 2 Dermaga 1.5
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 64 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Catladder No. 1 Dermaga 1.5
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 65 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 12 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 66 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 11 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 67 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 10 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 68 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 9 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 69 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 8 Dermaga 1.4
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 70 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 7 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 71 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 6 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 72 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 5 Dermaga 1.4
Catladder korosi berat dan bagian tengah kebawah sudah tidak ada. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 73 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 4 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 74 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 3 Dermaga 1.4
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 75 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 2 Dermaga 1.4
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 76 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Catladder No. 1 Dermaga 1.4
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 77 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 11 Dermaga 1.3
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 78 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 10 Dermaga 1.3
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 79 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 9 Dermaga 1.3
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 80 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 8 Dermaga 1.3
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 81 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 7 Dermaga 1.3
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 82 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 6 Dermaga 1.3
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 83 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 5 Dermaga 1.3
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 84 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 4 Dermaga 1.3
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 85 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 3 Dermaga 1.3
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 86 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 2 Dermaga 1.3
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 87 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Catladder No. 1 Dermaga 1.3
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 88 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Catladder No. 9 Dermaga 1.2
Catladder tidak ada anak tangga sudah tidak layak pakai, tidak ada handrails. |
RUSAK BERAT
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 89 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Catladder No. 8 Dermaga 1.2
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 90 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Catladder No. 7 Dermaga 1.2
Tidak ada catladder. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 91 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Catladder No. 6 Dermaga 1.2
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 92 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Catladder No. 5 Dermaga 1.1
Tidak ada catladder |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 93 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Catladder No. 4 Dermaga 1.1
Catladder korosi berat dan sudah tidak layak pakai, tidak ada handrails |
RUSAK RINGAN
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 94 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Catladder No. 3 Dermaga 1.1
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 95 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Catladder No. 2 Dermaga 1.1
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 96 |
16 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Catladder No. 1 Dermaga 1.1
Tidak ada catladder dan tidak ada handrails. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 97 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Bollard No. 6 Dermaga 7.1
Hasil penomoran Bollard No 6 Dermaga 7.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 98 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Bollard No. 5 Dermaga 7.1
Hasil penomoran Bollard No 5 Dermaga 7.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 99 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Bollard No. 4 Dermaga 7.1
Hasil penomoran Bollard No 4 Dermaga 7.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 100 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Bollard No. 3 Dermaga 7.1
Hasil penomoran Bollard No 3 Dermaga 7.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 101 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Bollard No. 2 Dermaga 7.1
Hasil penomoran Bollard No 2 Dermaga 7.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 102 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Bollard No. 1 Dermaga 7.1
Hasil penomoran Bollard No 1 Dermaga 7.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 103 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 10 Dermaga 2
Hasil penomoran Bollard No 10 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 104 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 9 Dermaga 2
Hasil penomoran Bollard No 9 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 105 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 8 Dermaga 2
Hasil penomoran Bollard No 8 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 106 |
14 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Bollard No. 4 Dermaga 3
Hasil penomoran Bollard No 4 Dermaga 3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 107 |
13 Nov 2026
Taufan Effendhy
|
Workshop
CIGADING 1
|
Kegiatan pemeliharaan dan penerapan Program 5R (Ringkas, Rapi, Resik, Rawat, Rajin) di area workshop.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 108 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 18 / fender no 17 - 18 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019044 |
In Process |
||
| 109 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 16 - 17 / fender no 16 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019573 |
In Process |
||
| 110 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 15 / fender no 14 - 15 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019572 |
In Process |
||
| 111 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 14 / fender no 13 - 14 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019043 |
In Process |
||
| 112 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 11 / fender no 11 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019571 |
In Process |
||
| 113 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 10 / fender no 10 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019570 |
In Process |
||
| 114 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 9 - 10 / fender no 8 - 9 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019569 |
In Process |
||
| 115 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 7 - 8 / fender no 6 - 7 |
RUSAK RINGAN
REQUEST REPAIR
|
Low 130000019568 |
In Process |
||
| 116 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi laut di dermaga 6, sejajar tiang conveyor no 6 - 7 / fender no 5 - 6 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019567 |
In Process |
||
| 117 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 27 - 31 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019566 |
In Process |
||
| 118 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 24 - 27 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019042 |
In Process |
||
| 119 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 22 - 24 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019565 |
In Process |
||
| 120 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 18 - 22 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019041 |
In Process |
||
| 121 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 17 - 18 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019564 |
In Process |
||
| 122 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 16 - 17 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019563 |
In Process |
||
| 123 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 15 - 16 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019562 |
In Process |
||
| 124 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 12 - 13 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019561 |
In Process |
||
| 125 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 11 - 12 |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019560 |
In Process |
||
| 126 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 9 - 10 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019559 |
In Process |
||
| 127 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 8 - 9 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019558 |
In Process |
||
| 128 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 5 - 6 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019044 |
In Process |
||
| 129 |
12 Nov 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Balok Tepi Dermaga 6
Terdapat kerusakan beton balok tepi sisi darat di dermaga 6, sejajar tiang conveyor no 4 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019038 |
In Process |
||
| 130 |
11 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Balok Tepi Dermaga 7.1
Terdapat 2 titik kerusakan beton balok tepi di dermaga 7.1 diantara fender 13 dan 14 |
RUSAK RINGAN
REQUEST REPAIR
|
Low 130000019522 |
In Process |
||
| 131 |
11 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Balok Tepi Dermaga 7.1
Terdapat 1 titik kerusakan beton balok tepi di dermaga 7.1 diantara fender 9 dan 10 |
RUSAK RINGAN
REQUEST REPAIR
|
Low 130000019521 |
In Process |
||
| 132 |
11 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Balok Tepi Dermaga 7.1
Terdapat 1 titik kerusakan beton balok tepi di dermaga 7.1 diantara fender 4 dan 5 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019520 |
In Process |
||
| 133 |
11 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Fender no 11 Dermaga 7.3
1 Unit Safety chains sisi anyer bagian bawah terlepas/tidak terpasang. |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019516 |
In Process |
||
| 134 |
11 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Fender no 10 Dermaga 7.3
1 pcs mur U Bolt safety chains sisi merak bagian atas Tidak ada/Hilang. |
RUSAK RINGAN
REQUEST REPAIR
|
Low 130000019515 |
In Process |
||
| 135 |
11 Nov 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Fender no 9 Dermaga 7.3
1 Unit Safety chains sisi anyer bagian bawah terlepas/tidak terpasang. |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019514 |
In Process |
||
| 136 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Fender No 9 Dermaga 1.2
Kondisi Frontal pad fender no 9, Ready to use. |
LAIK PAKAI
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 137 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Fender No 8 Dermaga 1.2
Kondisi Frontal pad fender no 8, Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 138 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Fender No 7 Dermaga 1.2
Kondisi Frontal pad fender no 7, Terkikis dan sebagian sudah tipis hingga rata dengan baud. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 139 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Fender No 6 Dermaga 1.2
Kondisi Frontal pad fender no 6, Terkikis dan sebagian sudah tipis hingga rata dengan baud. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 140 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Fender No 5 Dermaga 1.1
Kondisi Frontal pad fender no 5, Terkikis dan sebagian sudah tipis hingga rata dengan baud. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 141 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Fender No 4 Dermaga 1.1
Kondisi Frontal pad fender no 4, Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 142 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Fender No 3 Dermaga 1.1
Kondisi Frontal pad fender no 3, Terkikis dan sebagian sudah tipis hingga rata dengan baud. |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 143 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Fender No 2 Dermaga 1.1
Kondisi Frontal pad fender no 2, Terkikis dan sebagian sudah tipis hingga rata dengan baud. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 144 |
10 Nov 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Fender No 1 Dermaga 1.1
Kondisi Frontal pad fender no 1, Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 145 |
09 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Fender Dermaga 5
Menindaklanjuti proses persiapan sandar kapal tongkang bermuatan material Trunnion Ring untuk sandar di Dermaga 5, dengan menambahkan 6 unit fender darurat (ex ban loader) pada dermaga sisi merak di karenakan kapal akan sandar dengan posisi beaching |
LAIK PAKAI
REQUEST PENAMBAHAN
|
Medium 130000019436 |
In Process |
||
| 146 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Listplang Dermaga 3
Kondisi struktur istplang Dermaga 3 di dekat area fender No. 1 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019489 |
In Process |
||
| 147 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Pagar Sheet Pile Dermaga 3
Pagar sheet pile dermaga 3 mengalami kerusakan, Ada sekitar 7 segmen pagar yang mengalami patah engsel/rangka serta melengkung ke arah laut dan terdapat sebagian panel pagar yang sudah hilang diperkirakan tercebur ke laut |
RUSAK BERAT
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 148 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Bollard No. 6 Dermaga 3
Hasil penomoran Bollard No 6 Dermaga 3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 149 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Bollard No. 5 Dermaga 3
Hasil penomoran Bollard No 5 Dermaga 3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 150 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Bollard No. 3 Dermaga 3
Hasil penomoran Bollard No 3 Dermaga 3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 151 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Bollard No. 2 Dermaga 3
Hasil penomoran Bollard No 2 Dermaga 3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 152 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 3
CIGADING 1
|
Bollard No. 1 Dermaga 3
Hasil penomoran Bollard No 1 Dermaga 3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 153 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 7 Dermaga 2
Hasil penomoran Bollard No 7 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 154 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 6 Dermaga 2
Hasil penomoran Bollard No 6 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 155 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 5 Dermaga 2
Hasil penomoran Bollard No 5 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 156 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 4 Dermaga 2
Hasil penomoran Bollard No 4 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 157 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 3 Dermaga 2
Hasil penomoran Bollard No 3 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 158 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 2 Dermaga 2
Hasil penomoran Bollard No 2 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 159 |
07 Nov 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Bollard No. 1 Dermaga 2
Hasil penomoran Bollard No 1 Dermaga 2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 160 |
06 Nov 2026
Taufan Effendhy
|
Workshop
CIGADING 1
|
Kegiatan pemeliharaan dan penerapan Program 5R (Ringkas, Rapi, Resik, Rawat, Rajin) di area workshop.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 161 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 21
Lokasi : Sebelah darat (tengah) sejajar dengan Tiang conveyor 25 - 26 Kondisi : mengalami Spalling dengan ukuran panjang 220 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019461 |
In Process |
||
| 162 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 20
Lokasi : Sebelah darat (tengah) sejajar dengan Tiang conveyor 25 - 26 Kondisi : mengalami Spalling dengan ukuran panjang 150 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019460 |
In Process |
||
| 163 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 19
Lokasi : Sebelah laut (tengah) sejajar dengan Tiang conveyor 25 - 26 Kondisi : mengalami Spalling dengan ukuran panjang 870 cm x lebar 200 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019459 |
In Process |
||
| 164 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 18
Lokasi : Sebelah laut (tengah) sejajar dengan Tiang conveyor 26 - 27 Kondisi : mengalami Spalling dengan ukuran panjang 700 cm x lebar 100 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019458 |
In Process |
||
| 165 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 17
Lokasi : Sebelah laut (tengah) sejajar dengan Tiang conveyor 27 - 28 Kondisi : mengalami Spalling dengan ukuran panjang 400 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019457 |
In Process |
||
| 166 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 16
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 27 - 28 Kondisi : mengalami Spalling dengan ukuran panjang 620 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019456 |
In Process |
||
| 167 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 15
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 30 - 31 Kondisi : mengalami Spalling dengan ukuran panjang 1000 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019455 |
In Process |
||
| 168 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 14
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 30 - 31 Kondisi : mengalami Spalling dengan ukuran panjang 420 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019454 |
In Process |
||
| 169 |
05 Nov 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 13
Lokasi : Sebelah laut (tengah) sejajar dengan Tiang conveyor 30 - 31 Kondisi : mengalami Spalling dengan ukuran panjang 230 cm x lebar 70 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019453 |
In Process |
||
| 170 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 18 Dermaga 7.2
Kondisi: 2 pcs frontal pad bagian atas tidak ada dan terdapat baut menonjol. Potensi Bahaya: Berisiko merusak lambung kapal akibat benturan langsung dengan baut besi saat sandar. |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019429 |
In Process |
||
| 171 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 17 Dermaga 7.2
Kondisi: 3 pcs frontal pad bagian atas tidak ada dan terdapat baut menonjol. Potensi Bahaya: Berisiko merusak lambung kapal akibat benturan langsung dengan baut besi saat sandar. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019428 |
In Process |
||
| 172 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 16 Dermaga 7.2
Kondisi: 4 Pcs Frontal pad bagian atas tidak ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019427 |
In Process |
||
| 173 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 15 Dermaga 7.2
Kondisi: 3 pcs frontal pad bagian atas tidak ada dan terdapat baut menonjol. Potensi Bahaya: Berisiko merusak lambung kapal akibat benturan langsung dengan baut besi saat sandar. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019426 |
In Process |
||
| 174 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 14 Dermaga 7.2
Kondisi: 4 Pcs Frontal pad bagian atas tidak ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019425 |
In Process |
||
| 175 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 13 Dermaga 7.2
Kondisi: 3 pcs frontal pad bagian atas tidak ada dan terdapat baut menonjol. Potensi Bahaya: Berisiko merusak lambung kapal akibat benturan langsung dengan baut besi saat sandar. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019423 |
In Process |
||
| 176 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 10 Dermaga 7.2
Kondisi: 2 pcs frontal pad bagian atas tidak ada dan terdapat baut menonjol. Potensi Bahaya: Berisiko merusak lambung kapal akibat benturan langsung dengan baut besi saat sandar. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019422 |
In Process |
||
| 177 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 10 Dermaga 7.2
Kondisi: 3 pcs frontal pad bagian atas tidak ada dan terdapat baut menonjol. Potensi Bahaya: Berisiko merusak lambung kapal akibat benturan langsung dengan baut besi saat sandar. |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019421 |
In Process |
||
| 178 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 4 Dermaga 7.2
Kondisi: 3 Pcs Frontal Pad Bagian Atas Tidak Ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019420 |
In Process |
||
| 179 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 13 Dermaga 7.1
Kondisi: 1 Pcs Frontal Pad Bagian Atas Tidak Ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019419 |
In Process |
||
| 180 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 6 Dermaga 7.1
Kondisi: 1 Pcs Frontal Pad Bagian Atas Tidak Ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019418 |
In Process |
||
| 181 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 5 Dermaga 7.1
Kondisi: 1 Pcs Frontal Pad Bagian Atas Tidak Ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019417 |
In Process |
||
| 182 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 4 Dermaga 7.1
Kondisi: 3 Pcs Frontal Pad Bagian Atas Tidak Ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019415 |
In Process |
||
| 183 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 14 Dermaga 7.2
Kondisi: 1 Pcs Safety Chains Bagian Bawah Sisi Merak Terlepas/Tidak Terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 30000019411 |
In Process |
||
| 184 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 13 Dermaga 7.2
Kondisi: 1 Pcs Safety Chains Bagian Bawah Sisi Merak Terlepas/Tidak Terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019410 |
In Process |
||
| 185 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 14 Dermaga 7.1
Kondisi: 1 Pcs Safety Chains Bagian Bawah Sisi Anyer Terlepas/Tidak Terpasang Di Karenakan Putus Dari Sambungan |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019409 |
In Process |
||
| 186 |
04 Nov 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 9 Dermaga 7.1
Kondisi: 1 Pcs Safety Chains Bagian Bawah Sisi Anyer Terlepas/Tidak Terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019408 |
In Process |
||
| 187 |
03 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Fender Dermaga 5
Izin melaporkan kegiatan persiapan sandar tongkang bermuatan material Trunnion Ring di Dermaga 5, dengan rincian sebagai berikut: ▪️ Estimasi berat material : ± 250 ton ▪️ Estimasi sandar : 11 November 2026 ▪️ Posisi sandar : beaching position (± 20–25 m) Rekomendasi: - Pemasangan 6 (enam) set fender darurat pada tiang no 1 - no 6 dari arah Merak - Posisi Tongkang harus lebih tinggi dari lantai dermaga dan menggunakan ramdoor/plat dari tongkang ke lantai dermaga (Agar melewati Pipa/Tiang Fender atau tidak bertumpu langsung pada Pipa/Tiang Fender) |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 188 |
02 Nov 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Proses pelepasan hydrant yang lama, untuk diganti dengan hydrant machino yang baru
|
RUSAK BERAT
REQUEST GANTI
|
TIDAK | Ready to Use |
||
| 189 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 7 Dermaga 1.4
Hasil penomoran Bollard No 7 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 190 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 6 Dermaga 1.4
Hasil penomoran Bollard No 6 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 191 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 5 Dermaga 1.4
Hasil penomoran Bollard No 5 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 192 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 4 Dermaga 1.4
Hasil penomoran Bollard No 4 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 193 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 3 Dermaga 1.4
Hasil penomoran Bollard No 3 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 194 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 2 Dermaga 1.4
Hasil penomoran Bollard No 2 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 195 |
31 Oct 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Bollard No. 1 Dermaga 1.4
Hasil penomoran Bollard No 1 Dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 196 |
29 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Hydrant Dermaga 5
Berdasarkan hasil inspeksi pada Hydrant No. 1 di Dermaga 5, terpantau kondisi unit mengalami rembes/kebocoran. |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019486 |
In Process |
||
| 197 |
29 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Balok Tepi Dermaga 5
Terdapat 5 titik kerusakan beton balok tepi di dermaga 5 diantara bollard 9 dan 10 |
RUSAK BERAT
REQUEST REPAIR
|
High | Outstanding |
||
| 198 |
29 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Balok Tepi Dermaga 5
Terdapat 8 titik kerusakan beton balok tepi di dermaga 5 diantara bollard 8 dan 9 |
RUSAK BERAT
REQUEST REPAIR
|
High | Outstanding |
||
| 199 |
29 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Balok Tepi Dermaga 5
Terdapat 10 titik kerusakan beton balok tepi di dermaga 5 diantara bollard 3 dan 4 |
RUSAK BERAT
REQUEST REPAIR
|
High | Outstanding |
||
| 200 |
29 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Beton Lantai Dermaga 5
Kondisi beton lantai dermaga cukup baik, tidak ada yang mengalami spalling. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 201 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Balok Tepi Dermaga 2
Terdapat 6 pcs balok tepi (masing-masing panjang 2m) yang tidak ada / kosong di antara Fender No. 1 dan 2. |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 202 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Sebelah atas sisi laut sejajar dengan fender 6 - 7 Kondisi : mengalami spaling dengan ukuran panjang 110 cm x lebar 100 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 203 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Bagian atas sisi darat sejajar dengan fender 6 - 7 Kondisi : mengalami spaling dengan ukuran panjang 140cm x lebar 75 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 204 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Bagian atas sisi darat sejajar dengan fender 6 - 7 Kondisi : mengalami spaling dengan ukuran panjang 130cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 205 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Bagian atas sisi laut sejajar dengan fender 5 - 6 Kondisi : mengalami spaling dengan ukuran panjang 180cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 206 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Bagian bawah sisi darat sejajar dengan fender 5 - 6 Kondisi : mengalami spaling dengan ukuran panjang 130cm x lebar 80 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 207 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Sebelah tengah sisi laut sejajar dengan fender 5 - 6 Kondisi : mengalami spaling dengan ukuran panjang 125cm x lebar 95 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 208 |
28 Oct 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Beton Lantai Dermaga 2
Posisi : Bagian tengah sisi darat sejajar dengan fender 4 - 5 Kondisi : mengalami spaling dengan ukuran panjang 140cm x lebar 130 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 209 |
26 Oct 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Beton Lantai Dermaga 1.6
Posisi : Di tengah sejajar dengan Tiang conveyor 24 - 25 Kondisi : mengalami spaling dengan ukuran panjang 130cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 210 |
26 Oct 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Beton Lantai Dermaga 1.6
Posisi : Sebelah darat sejajar dengan Tiang conveyor 25 - 26 Kondisi : mengalami spaling dengan ukuran panjang 110cm x lebar 80 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 211 |
26 Oct 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Beton Lantai Dermaga 1.6
Posisi : Sebelah darat sejajar dengan Tiang conveyor 27 - 28 Kondisi : mengalami spaling dengan ukuran panjang 110cm x lebar 80 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 212 |
26 Oct 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Beton Lantai Dermaga 1.6
Posisi : Sebelah darat sejajar dengan Tiang conveyor 28 - 29 Kondisi : mengalami spaling dengan ukuran panjang 210cm x lebar 130 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 213 |
26 Oct 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Beton Lantai Dermaga 1.6
Posisi : Sebelah darat sejajar dengan Tiang conveyor 28 - 29 Kondisi : mengalami spaling dengan ukuran panjang 160cm x lebar 100 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 214 |
26 Oct 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Beton Lantai Dermaga 1.5
Posisi : Sebelah darat sejajar dengan Tiang conveyor 31 - 32 Kondisi : mengalami spaling dengan ukuran panjang 180cm x lebar 150 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 215 |
21 Oct 2026
Taufan Effendhy
|
Dermaga 7.3
CIGADING 1
|
Fender No 13 Dermaga 7.3
3 mata rantai safety chains pada fender no 13 Dermaga 7.3 tidak terpasang, segera pasang agar tidak menjadi temuan HSSE |
RELEASE
BY EXECUTOR
|
High 130000019259 |
Completed |
||
| 216 |
20 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Fender V No 13 Dermaga 5
Kondisi tiang panjang dan pipa fender mengalami deformasi berat, perlu ada tindak lanjut dari manajemen |
RUSAK BERAT
REQUEST REPAIR
|
Very High | Outstanding |
||
| 217 |
20 Oct 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Fender V Dermaga 5
Inspeksi visual pada Fender V Dermaga 5. Hasil inspeksi menunjukkan struktur fender dalam kondisi baik, rantai pengikat kencang, dan tidak ada kerusakan struktural yang mengganggu operasional sandar kapal. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 218 |
19 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Beton Balok Tepi Dermaga 1.2
2 unit beton balok tepi ukuran 2 meter tidak ada posisi dekat dengan bollard no 5 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
High 130000019251 |
In Process |
||
| 219 |
17 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Beton Lantai Bawah Dermaga 1.2
Hasil inspeksi visual menunjukkan bahwa kondisi struktur beton lantai bagian bawah Dermaga 1.2 jauh lebih baik dibandingkan Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 220 |
17 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Water Supply Dermaga 1.1 dan 1.2
Hasil inspeksi pada jaringan water supply pipa HDPE bagian bawah Dermaga 1.1 dan 1.2 menunjukkan adanya indikasi korosi pada klem/support pipa akibat paparan kelembapan udara laut yang tinggi serta beberapa unit support yang terlepas dari struktur beton. Namun secara keseluruhan klem/support pipa hdpe masih terpasang dengan baik, meskipun memerlukan pemasangan kembali support yang lepas agar bisa menopang beban pipa secara efektif. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 221 |
17 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Beton Lantai Bawah Dermaga 1.1
Hasil inspeksi visual pada struktur beton lantai bagian bawah Dermaga 1.1 menunjukkan adanya beberapa area spalling pada selimut beton akibat paparan lingkungan laut dan korosi tulangan. |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 222 |
16 Oct 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Plat Dilatasi Dermaga 4.2
Kondisi: Sambungan las pada plat area dilatasi terlepas |
RUSAK BERAT
REQUEST REPAIR
|
High 130000018453 |
In Process |
||
| 223 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 12
Lokasi : Sebelah darat (tengah) sejajar dengan Tiang conveyor 31 Kondisi : mengalami Spalling dengan ukuran panjang 360 cm x lebar 200 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019452 |
In Process |
||
| 224 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 11
Lokasi : Sebelah tengah sejajar dengan Tiang conveyor 32 Kondisi : mengalami Spalling dengan ukuran panjang 150 cm x lebar 70 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019451 |
In Process |
||
| 225 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 10
Lokasi : Sebelah darat (tengah) sejajar dengan Tiang conveyor 32 - 33 Kondisi : mengalami Spalling dengan ukuran panjang 160 cm x lebar 70 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019450 |
In Process |
||
| 226 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 9
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 32 - 33 Kondisi : mengalami Spalling dengan ukuran panjang 820 cm x lebar 70 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019449 |
In Process |
||
| 227 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 8
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 32 - 33 Kondisi : mengalami Spalling dengan ukuran panjang 260 cm x lebar 160 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019447 |
In Process |
||
| 228 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 7
Lokasi : Sebelah darat (tengah) sejajar dengan Tiang conveyor 36 - 37 Kondisi : mengalami Spalling dengan ukuran panjang 300 cm x lebar 160 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019446 |
In Process |
||
| 229 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 6
Lokasi : Sebelah darat (tengah) sejajar dengan Tiang conveyor 38 - 39 Kondisi : mengalami Spalling dengan ukuran panjang 400 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019445 |
In Process |
||
| 230 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 5
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 39 - 40 Kondisi : mengalami Spalling dengan ukuran panjang 1200 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019444 |
In Process |
||
| 231 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 4
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 41 - 42 Kondisi : mengalami Spalling dengan ukuran panjang 700 cm x lebar 110 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019443 |
In Process |
||
| 232 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 3
Lokasi : Sebelah darat sejajar dengan Tiang conveyor 41 - 42 Kondisi : mengalami Spalling dengan ukuran panjang 700 cm x lebar 210 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019442 |
In Process |
||
| 233 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 2
Lokasi : Sebelah laut sejajar dengan Tiang conveyor 43 - 44 Kondisi : mengalami Spalling dengan ukuran panjang 610 cm x lebar 50 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019441 |
In Process |
||
| 234 |
13 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Beton Lantai Dermaga 1.3 No 1
Lokasi : Sebelah darat sejajar dengan Tiang conveyor 43 - 44 Kondisi : mengalami spalling dengan ukuran panjang 280 cm x lebar 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
High 130000019440 |
In Process |
||
| 235 |
12 Oct 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Fender no 2 Dermaga 1.7
Kondisi: Terdapat shackle safety chains yang longgar pada bagian atas arah merak |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019196 |
In Process |
||
| 236 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 10 Dermaga 1.3
Hasil penomoran Bollard No 10 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 237 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 9 Dermaga 1.3
Hasil penomoran Bollard No 9 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 238 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 8 Dermaga 1.3
Hasil penomoran Bollard No 8 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 239 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 7 Dermaga 1.3
Hasil penomoran Bollard No 7 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 240 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 6 Dermaga 1.3
Hasil penomoran Bollard No 6 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 241 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 5 Dermaga 1.3
Hasil penomoran Bollard No 5 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 242 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 4 Dermaga 1.3
Hasil penomoran Bollard No 4 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 243 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 3 Dermaga 1.3
Hasil penomoran Bollard No 3 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 244 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 2 Dermaga 1.3
Hasil penomoran Bollard No 2 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 245 |
10 Oct 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Bollard No. 1 Dermaga 1.3
Hasil penomoran Bollard No 1 Dermaga 1.3 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 246 |
07 Oct 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Beton lantai bawah Dermaga 4.2
Inspeksi beton lantai bawah dermaga 4.2 dan instalasi water supply bersama tim eksekutor dermaga |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 247 |
06 Oct 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Hydrant No. 2 Dermaga 7.2
Kondisi: Handwheel tidak ada. |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 248 |
06 Oct 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Hydrant No. 1 Dermaga 7.2
Kondisi: Lapisan pelindung (cat) pada handwheel mengalami pengelupasan akibat korosi. |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 249 |
06 Oct 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Hydrant No. 2 Dermaga 7.1
Kondisi: Handwheel mengalami korosi berat hingga berlubang/keropos. |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 250 |
06 Oct 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Hydrant No. 1 Dermaga 7.1
Kondisi: Handwheel mengalami korosi berat hingga patah pada bagian as/batang katup. |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 251 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Shiphook No. 2 Dermaga 1.2
Hasil penomoran Shiphook No 2 Dermaga 1.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 252 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Shiphook No. 1 Dermaga 1.1
Hasil penomoran Shiphook No 1 Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 253 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Bollard No. 8 Dermaga 1.2
Hasil penomoran Bollard No 8 Dermaga 1.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 254 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Bollard No. 7 Dermaga 1.2
Hasil penomoran Bollard No 7 Dermaga 1.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 255 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.2
CIGADING 1
|
Bollard No. 6 Dermaga 1.2
Hasil penomoran Bollard No 6 Dermaga 1.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 256 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Bollard No. 5 Dermaga 1.1
Hasil penomoran Bollard No 5 Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 257 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Bollard No. 4 Dermaga 1.1
Hasil penomoran Bollard No 4 Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 258 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Bollard No. 3 Dermaga 1.1
Hasil penomoran Bollard No 3 Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 259 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Bollard No. 2 Dermaga 1.1
Hasil penomoran Bollard No 2 Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 260 |
03 Oct 2026
Taufan Effendhy
|
Dermaga 1.1
CIGADING 1
|
Bollard No. 1 Dermaga 1.1
Hasil penomoran Bollard No 1 Dermaga 1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 261 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 12 Dermaga 1.4
Kondisi: Mengalami korosi pada bagian handle. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 262 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 11 Dermaga 1.4
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 263 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 10 Dermaga 1.4
Kondisi: Tergenang air. Penyebab: Diperkirakan saluran pembuangan tertutup sisa material. |
KOTOR
REQUEST BERSIHKAN
|
Medium | Outstanding |
||
| 264 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 9 Dermaga 1.4
Kondisi: Tergenang air. Penyebab: Diperkirakan saluran pembuangan tertutup sisa material. |
KOTOR
REQUEST BERSIHKAN
|
Medium | Outstanding |
||
| 265 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No 8 Dermaga 1.4
Kondisi: Tertimbun sisa material batu bara. Keterangan: - Gambar kiri (before cleaning) - Gambar kanan (after cleaning) |
KOTOR
REQUEST BERSIHKAN
|
TIDAK | Ready to Use |
||
| 266 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 7 Dermaga 1.4
Kondisi: Tidak ada hydrant valve. |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 267 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 6 Dermaga 1.4
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 268 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 5 Dermaga 1.4
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 269 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 4 Dermaga 1.4
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 270 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 3 Dermaga 1.4
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 271 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 2 Dermaga 1.4
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 272 |
30 Sep 2026
Taufan Effendhy
|
Dermaga 1.4
CIGADING 1
|
Hydrant No. 1 Dermaga 1.4
Kondisi: Mengalami korosi pada bagian handle. |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 273 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Hydrant No. 12 Dermaga 1.8
Kondisi: Gate valve hydrant tidak ada. |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 1300000191034 |
In Process |
||
| 274 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Hydrant No. 11 Dermaga 1.8
Kondisi: Gate valve hydrant tidak ada. |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000019103 |
In Process |
||
| 275 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Hydrant No. 10 Dermaga 1.8
Kondisi: Manhole hydrant tergenang dan tertutup material. |
KOTOR
REQUEST BERSIHKAN
|
Medium 1300000191078 |
In Process |
||
| 276 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Hydrant No. 9 Dermaga 1.8
Kondisi: Manhole hydrant tergenang dan tertutup material. |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000019107 |
In Process |
||
| 277 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Hydrant No. 8 Dermaga 1.8
Kondisi: Manhole hydrant tertutup material. |
RUSAK BERAT
REQUEST BERSIHKAN
|
Medium 130000019106 |
In Process |
||
| 278 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Hydrant No. 7 Dermaga 1.8
Kondisi: Manhole hydrant tertutup material. |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000019105 |
In Process |
||
| 279 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Hydrant No. 6 Dermaga 1.7
Kondisi: Gate valve hydrant tidak ada. |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000019102 |
In Process |
||
| 280 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Hydrant No. 5 Dermaga 1.7
Kondisi: 4 unit handle plat cover hydrant tidak ada. |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000019101 |
In Process |
||
| 281 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Hydrant No. 3 Dermaga 1.7
Kondisi: 2 unit handle plat cover hydrant pada sisi anyer rusak dan perlu perbaikan. |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019100 |
In Process |
||
| 282 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Hydrant No. 4 Dermaga 1.6
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 283 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Hydrant No. 3 Dermaga 1.6
Kondisi: Ready to use. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 284 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Hydrant No. 2 Dermaga 1.5
Kondisi: Plat cover hydrant mengalami deformasi. |
RUSAK RINGAN
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 285 |
28 Sep 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Hydrant No. 1 Dermaga 1.5
Kondisi: Ready to use dan Mengalami korosi ringan. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 286 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 10 Dermaga 7.2
Hasil penomoran Bollard No 10 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 287 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 9 Dermaga 7.2
Hasil penomoran Bollard No 9 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 288 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 9 Dermaga 7.2
Hasil penomoran Bollard No 9 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 289 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 8 Dermaga 7.2
Hasil penomoran Bollard No 8 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 290 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 7 Dermaga 7.2
Hasil penomoran Bollard No 7 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 291 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 6 Dermaga 7.2
Hasil penomoran Bollard No 6 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 292 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 5 Dermaga 7.2
Hasil penomoran Bollard No 5 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 293 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 4 Dermaga 7.2
Hasil penomoran Bollard No 4 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 294 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 3 Dermaga 7.2
Hasil penomoran Bollard No 3 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 295 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 2 Dermaga 7.2
Hasil penomoran Bollard No 2 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 296 |
26 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Bollard No 1 Dermaga 7.2
Hasil penomoran Bollard No 1 Dermaga 7.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 297 |
21 Sep 2026
Taufan Effendhy
|
Dermaga 1.3
CIGADING 1
|
Fender No 1 Dermaga 1.3 ;
Bracket : sisi merak lepas |
RUSAK BERAT
REQUEST REPAIR
|
Very High 130000019062 |
In Process |
||
| 298 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Fender No 5 Dermaga 4.2
Hasil inspeksi penomoran Fender No 5 Dermaga 4.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 299 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Fender No 4 Dermaga 4.2
Hasil inspeksi penomoran Fender No 4 Dermaga 4.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 300 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Fender No 3 Dermaga 4.2
Hasil inspeksi penomoran Fender No 3 Dermaga 4.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 301 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4.2
CIGADING 1
|
Fender No 2 Dermaga 4.2
Hasil inspeksi penomoran Fender No 2 Dermaga 4.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 302 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 7.1
CIGADING 1
|
Fender No 1 Dermaga 4.2
Hasil inspeksi penomoran Fender No 1 Dermaga 4.2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 303 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 6 Dermaga 4.1
Hasil inspeksi penomoran Fender No 6 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 304 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 13 Dermaga 4.1
Hasil inspeksi penomoran Fender No 13 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 305 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 12 Dermaga 4.1
Hasil inspeksi penomoran Fender No 12 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 306 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 11 Dermaga 4.1
Hasil inspeksi penomoran Fender No 11 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 307 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 10 Dermaga 4.1
Hasil inspeksi penomoran Fender No 10 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 308 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 9 Dermaga 4.1
Hasil inspeksi penomoran Fender No 9 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 309 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 8 Dermaga 4.1
Hasil inspeksi penomoran Fender No 8 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 310 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 7 Dermaga 4.1
Hasil inspeksi penomoran Fender No 7 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 311 |
19 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Fender No 6 Dermaga 4.1
Hasil inspeksi penomoran Fender No 6 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 312 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 15, mengalami kerusakan berukuran P 460 x L 460 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU |
|
Ready to Use |
|
| 313 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 14, mengalami kerusakan berukuran P 220 x L 230 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU |
|
Ready to Use |
|
| 314 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 13, mengalami kerusakan berukuran P 650 x L 330 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU |
|
Ready to Use |
|
| 315 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 12, mengalami kerusakan berukuran P 350 x L 350 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU |
|
Ready to Use |
|
| 316 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 11, mengalami kerusakan berukuran P 270 x L 170 cm Perbaikan beton lantai Dermaga 4.1, Posisi kerusakan beton lantai antara bollard no 3 dan no 4, Dengan dimensi kerusakan 530 cm x 400 cm, adapun pekerjaan meliputi : - pembobokan beton lantai dermaga - penambahan tulangan - pengecoran beton lantai |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU |
|
Ready to Use |
|
| 317 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 10, mengalami kerusakan berukuran P 1140 x L 1050 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 318 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.1
Kondisi Beton Lantai pada lokasi 9, mengalami kerusakan berukuran P 530 x L 400 cm |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 319 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 8, mengalami kerusakan berlubang sepanjang 100 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 320 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4.1
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 7, mengalami kerusakan berlubang sepanjang 350 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 321 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 6, mengalami kerusakan berlubang sepanjang 140 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 322 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 5, mengalami kerusakan berlubang sepanjang 200 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 323 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 4, mengalami kerusakan berlubang sepanjang 40 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 324 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 3, mengalami kerusakan berlubang sepanjang 130 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 325 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 2, mengalami kerusakan berlubang sepanjang 100 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 326 |
18 Sep 2026
Taufan Effendhy
|
Dermaga 4
CIGADING 1
|
Area Dilatasi Dermaga 4.1
Kondisi area dilatasi pada lokasi 1, mengalami kerusakan berlubang sepanjang 350 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 327 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 81 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 328 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 80 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 329 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 79 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 330 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 78 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 331 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 77 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 332 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 76 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 333 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 75 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 334 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No74 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 335 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 73 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 336 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 72 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 337 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 71 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 338 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 70 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 339 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 69 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 340 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 68 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 341 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 67 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 342 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 66 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 343 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 65 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 344 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 64 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 345 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 63 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 346 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 62 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 347 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 61 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 348 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 60 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 349 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 59 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 350 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 58 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 351 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 57 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 352 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 56 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 353 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 55 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 354 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 54 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 355 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 53 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 356 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 52 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 357 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 51 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 358 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 50 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 359 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 49 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST SERVICE
|
PANTAU | Ready to Use |
||
| 360 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 48 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 361 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 47 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 362 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 46 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 363 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 45 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 364 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 44 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 365 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 43 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 366 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 42 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 367 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 41 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 368 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 40 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 369 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 39 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 370 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 38 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 371 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 37 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 372 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 36 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 373 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 35 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST SERVICE
|
PANTAU | Ready to Use |
||
| 374 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 34 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 375 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 33 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 376 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 32 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 377 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 31 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 378 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 30 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 379 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 29 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 380 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 28 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 381 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 27 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 382 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 26 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 383 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 25 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 384 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 24 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 385 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 23 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 386 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 22 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 387 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 21 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 388 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 20 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 389 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 19 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 390 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 18 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 391 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 17 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 392 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 16 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 393 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 15 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 394 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No14 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 395 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 13 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 396 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 12 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 397 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 11 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 398 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 10 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 399 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 9 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 400 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 8 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 401 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 7 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 402 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 6 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 403 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 5 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 404 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 4 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 405 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 3 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 406 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 2 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 407 |
17 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Kondisi Frontal Pad No 1 Dermaga 5
Gambar Kiri Tanggal : 20 Januari 2026, Gambar Kanan Tanggal : 17 September 2026 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 408 |
16 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 7 Dermaga 7.2
terdapat retakan/ guratan pada leher cell rubber fender baik sisi darat maupun laut |
RUSAK RINGAN
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 409 |
16 Sep 2026
Taufan Effendhy
|
Dermaga 7.2
CIGADING 1
|
Fender No 13 Dermaga 7.2
Safety chains bagian bawah arah merak pada fender no 13 dermaga 7.2 tidak terpasang |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 410 |
15 Sep 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Fender V No 21 Dermaga 5
Dudukan fender V no 21 dermaga 5 pada tiang pancang dan pipa fender mengalami deformasi yang cukup berat |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 411 |
15 Sep 2026
Taufan Effendhy
|
Dermaga 5
CIGADING 2
|
Fender V No 13 Dermaga 5
Dudukan fender V no 13 dermaga 5 pada tiang pancang dan pipa fender mengalami deformasi yang cukup berat |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 412 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 13 - Fender 14, 800 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018963 |
In Process |
||
| 413 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 12 - Fender 13, 590 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018962 |
In Process |
||
| 414 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 9 - Fender 10, 560 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018961 |
In Process |
||
| 415 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 8 - Fender 9, 890 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018960 |
In Process |
||
| 416 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 7 - Fender 8, 610 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018959 |
In Process |
||
| 417 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 5 - Fender 6, 140 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018958 |
In Process |
||
| 418 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 2 - Fender 3, 100 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018957 |
In Process |
||
| 419 |
14 Sep 2026
Taufan Effendhy
|
Dermaga 2
CIGADING 1
|
Jalur Kabel PHC Dermaga 2
Panjang kerusakan jalur kabel PHC di antara Fender 2 - Fender 3, 120 cm |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018956 |
In Process |
||
| 420 |
09 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Fender No 9 Dermaga 2
Frontal pad fender no 9 dermaga 2 bagian atas arah anyer terkikis berat |
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 421 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender No 5 Dermaga 4.1
Hasil inspeksi penomoran Fender No 5 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 422 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender No 4 Dermaga 4.1
Hasil inspeksi penomoran Fender No 4 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 423 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender No 3 Dermaga 4.1
Hasil inspeksi penomoran Fender No 3 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 424 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender No 2 Dermaga 4.1
Hasil inspeksi penomoran Fender No 2 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 425 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender No 1 Dermaga 4.1
Hasil inspeksi penomoran Fender No 1 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 426 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Bollard No 5 Dermaga 4.1
Hasil inspeksi penomoran Bollard No 5 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 427 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Bollard No 4 Dermaga 4.1
Hasil inspeksi penomoran Bollard No 4 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 428 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Bollard No 3 Dermaga 4.1
Hasil inspeksi penomoran Bollard No 3 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 429 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Bollard No 2 Dermaga 4.1
Hasil inspeksi penomoran Bollard No 2 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 430 |
05 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Bollard No 1 Dermaga 4.1
Hasil inspeksi penomoran Bollard No 1 Dermaga 4.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 431 |
03 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Water Supply Dermaga 5 Bocor
Water supply dermaga 5 mengalami kebocoran pada join flange |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018884 |
In Process |
||
| 432 |
02 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Fender No 15 (dihitung dari D1.5) / Fender No 4 (dihitung dari D1.6)
Fender no 4 (D1.6) tidak ada |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000018883 |
In Process |
||
| 433 |
01 Sep 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Hydrant No 2 Dermaga 5
Terjadi rembesan air pada komponen katup (valve leakage) di hydrant nomor 2 dermaga 5. Kondisi ini menunjukkan adanya kebocoran kecil yang memerlukan tindakan lebih lanjut, seperti pemeriksaan pada komponen seal atau pengencangan ulang pada bagian katup untuk mencegah kebocoran yang lebih besar. |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 434 |
31 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.6
CIGADING 1
|
Listplang Dermaga 1.6
Listplang dermaga 1.6 antara pada fender no 1 0 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018845 |
In Process |
||
| 435 |
31 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.6
CIGADING 1
|
Listplang Dermaga 1.6
Listplang dermaga 1.6 antara fender no 1 dan no 2 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018844 |
In Process |
||
| 436 |
31 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Listplang Dermaga 1.5
Listplang dermaga 1.5 antara fender no 6 dan no 7 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018843 |
In Process |
||
| 437 |
31 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Listplang Dermaga 1.5
Listplang dermaga 1.5 antara fender no 4 dan no 5 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018842 |
In Process |
||
| 438 |
31 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Listplang Dermaga 1.5
Listplang dermaga 1.5 antara fender no 3 dan no 4 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018841 |
In Process |
||
| 439 |
31 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Listplang Dermaga 1.5
Listplang dermaga 1.5 sisi anyer fender no 1 mengalami spalling |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018840 |
In Process |
||
| 440 |
29 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Track Crane Dermaga 1.3
Siku track crane tidak rata dengan beton lantai sehingga berpotensi membahayakan kendaraan yang melintas |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018829 |
In Process |
||
| 441 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Bollard No 2 Dermaga 1.7
Hasil inspeksi penomoran Bollard No 2 Dermaga 1.7 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 442 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.7
CIGADING 1
|
Bollard No 1 Dermaga 1.7
Hasil inspeksi penomoran Bollard No 1 Dermaga 1.7 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 443 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Bollard No 9 Dermaga 1.6
Hasil inspeksi penomoran Bollard No 9 Dermaga 1.6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 444 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Bollard No 8 Dermaga 1.6
Hasil inspeksi penomoran Bollard No 8 Dermaga 1.6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 445 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Bollard No 7 Dermaga 1.6
Hasil inspeksi penomoran Bollard No 7 Dermaga 1.6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 446 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.6
CIGADING 1
|
Bollard No 6 Dermaga 1.6
Hasil inspeksi penomoran Bollard No 6 Dermaga 1.6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 447 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Bollard No 5 Dermaga 1.5
Hasil inspeksi penomoran Bollard No 5 Dermaga 1.5 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 448 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Bollard No 4 Dermaga 1.5
Hasil inspeksi penomoran Bollard No 4 Dermaga 1.5 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 449 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Bollard No 3 Dermaga 1.5
Hasil inspeksi penomoran Bollard No 3 Dermaga 1.5 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 450 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Bollard No 2 Dermaga 1.5
Hasil inspeksi penomoran Bollard No 2 Dermaga 1.5 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 451 |
29 Aug 2026
Taufan Effendhy
|
Dermaga 1.5
CIGADING 1
|
Bollard No 1 Dermaga 1.5
Hasil inspeksi penomoran Bollard No 1 Dermaga 1.5 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 452 |
27 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 11 Dermaga 6
Hasil inspeksi penomoran Bollard No 11 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 453 |
27 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 10 Dermaga 6
Hasil inspeksi penomoran Bollard No 10 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 454 |
26 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Beton Balok Tepi Dermaga 1.4
3 pcs beton balok tepi ukuran 2 meter hancur (sisi anyer fender no 5) |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018810 |
In Process |
||
| 455 |
26 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 3
CIGADING 1
|
Fender No 4 Dermaga 3
Frame fender no 4 dermaga 3 mengalami deformasi / ringsek |
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018808 |
In Process |
||
| 456 |
24 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Beton Balok Tepi Dermaga 1.1
Terdapat 2 titik Kerusakan pada beton balok tepi di area Dermaga 1.1 dekat bollard no 3 |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018803 |
In Process |
||
| 457 |
24 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Fender no 3 Dermaga 1.1
Kondisi frontal pad fender no 3 dermaga 1.1 terkikis dan mengelupas parah pada bagian samping. |
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018802 |
In Process |
||
| 458 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 9 Dermaga 6
Hasil inspeksi penomoran Bollard No 9 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 459 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 8 Dermaga 6
Hasil inspeksi penomoran Bollard No 8 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 460 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 7 Dermaga 6
Hasil inspeksi penomoran Bollard No 7 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 461 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 6 Dermaga 6
Hasil inspeksi penomoran Bollard No 6 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 462 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 5 Dermaga 6
Hasil inspeksi penomoran Bollard No 5 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 463 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 4 Dermaga 6
Hasil inspeksi penomoran Bollard No 4 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 464 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 3 Dermaga 6
Hasil inspeksi penomoran Bollard No 3 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 465 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 2 Dermaga 6
Hasil inspeksi penomoran Bollard No 2 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 466 |
22 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Bollard No 1 Dermaga 6
Hasil inspeksi penomoran Bollard No 1 Dermaga 6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 467 |
21 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 4.2
CIGADING 1
|
Plat Area Dilatasi Dermaga 4.2
Plat area dilatasi dermaga 4.2 tidak rata/bergelombang dengan lantai dermaga |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 468 |
19 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Bollard No 1 Dermaga 2
Kondisi pondasi bollard no 1 dermaga 2 mengalami spalling hingga 40% |
RUSAK RINGAN
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 469 |
19 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Fender No 9 Dermaga 2
Frontal pad fender no 9 dermaga 2 terkikis berat (atas arah anyer) |
RUSAK RINGAN
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 470 |
18 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.6
CIGADING 1
|
Cylindrical Fender No 6 Dermaga 1.6
Bracket cylindrycal fender no 6 dermaga 1.6 arah merak lepas, sehingga kondisinya menggantung |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018807 |
In Process |
||
| 471 |
18 Aug 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Bollard No 2 Dermaga 1.8
Terdapat tumpukan sisa material pada bollard no 2 dermaga 1.8 |
KOTOR
REQUEST BERSIHKAN
|
TIDAK | Ready to Use |
||
| 472 |
18 Aug 2026
Taufan Effendhy
|
Dermaga 1.8
CIGADING 1
|
Fender No 2 Dermaga 1.8
Frontal pad fender no 2 dermaga 1.8 terkikis |
RUSAK RINGAN
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 473 |
15 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Fender no 30 Dermaga 6
Berdasarkan hasil inspeksi dilapangan, Fender No. 30 mencatatkan kemiringan 7°. Data di ambil menggunakan aplikasi leveling digital berbasis android. (Request di rubah posisinya) |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 474 |
15 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Fender no 23 Dermaga 6
Berdasarkan hasil inspeksi dilapangan, Fender No. 23 mencatatkan kemiringan 9°. Data di ambil menggunakan aplikasi leveling digital berbasis android. (Request di rubah posisinya) |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 475 |
15 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Fender no 7 Dermaga 6
Berdasarkan hasil inspeksi dilapangan, Fender No. 7 mencatatkan kemiringan 8° dan Cell rubber untuk fender ini pecah sejak 13/11/2025. Data leveling di ambil menggunakan aplikasi leveling digital berbasis android. |
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 476 |
13 Aug 2026
Taufan Effendhy
|
Dermaga 6
CIGADING 2
|
Fender no 1 dermaga 6
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 477 |
11 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Pipa fender V no 21 Dermaga 5
Kerusakan berat pada pipa fender no 21 Dermaga 5 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 478 |
11 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Pipa fender V no 13 Dermaga 5
Kerusakan berat pada pipa fender no 13 Dermaga 5 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 479 |
10 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 1.6
CIGADING 1
|
Fender no 6 Dermaga 1.6
Bracket cylindrical rubber fender no 6 (arah merak) Dermaga 1.6 lepas dari dinding dermaga |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018807 |
In Process |
||
| 480 |
07 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Beton lantai Dermaga 4.1
Terdapat 4 titik kerusakan (tulangan terlihat) beton lantai dengan ukuran beragam ; - 1,5 m x 1,5 m - 9 m x 9 m - 6 m x 6 m - 3 m x 4 m |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 481 |
06 Aug 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton balok tepi trestle Dermaga 6
terdapat beberapa titik spalling beton balok tepi |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
- | Outstanding |
||
| 482 |
27 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Beton Balok Tepi Dermaga 1.4
Terdapat 14 titik kerusakan beton balok tepi di dermaga 1.4 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 483 |
27 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Beton Lantai Dermaga 1.4
Beton lantai dermaga 1.4 mengalami spalling di dekat manipole cabot |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 484 |
27 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 11 Dermaga 1.4
Frontal pad fender no 11 dermaga 1.4 bagian atas terkikis cukup dalam |
RUSAK RINGAN
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 485 |
27 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 10 Dermaga 1.4
Cell rubber fender no 10 dermaga 1.4 robek pada leher bagian bawah arah laut |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 486 |
27 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 9 Dermaga 1.4
2 pcs frontal pad fender no 9 dermaga 1.4 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 487 |
24 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 4.2
CIGADING 1
|
Plat Area Dilatsi Dermaga 4.2
Las-lasan plat area dilatasi dermaga 4.2 lepas, segera las ulang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 488 |
24 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Beton Lantai Dermaga 4.2
Beton lantai dermaga 4.2 ujung arah laut mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 489 |
24 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Plat Area Dilatasi Dermaga 4.2
Plat area dilatasi dermaga 4.2 ujung arah laut bergeser |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 490 |
23 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Bollard No 7 Dermaga 5
Terdapat sisa tali tambang tongkang di bollard no 7 dermaga 5 dan sudah dibersihkan |
LAIK PAKAI
REQUEST BERSIHKAN
|
TIDAK | Ready to Use |
||
| 491 |
22 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Fender No 13 Dermaga 7.3
Safety chains arah merak (atas dan bawah) dan arah anyer (bawah) pada fender no 13 dermaga 7.3 tidak terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 492 |
22 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Fender No 12 Dermaga 7.3
Safety chains bagian bawah arah merak dan anyer fender no 12 dermaga 7.3 tidak terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 493 |
22 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Fender No 11 Dermaga 7.3
Safety chains bagian bawah arah merak fender no 11 dermaga 7.3 tidak terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 494 |
22 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Fender No 8 Dermaga 7.3
Fender darurat (ban ex loader) pada fender no 8 dermaga 7.3 tidak pada posisi seharusnya |
KOTOR
REQUEST REPAIR
|
Medium | Outstanding |
||
| 495 |
22 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Fender No 4 Dermaga 7.3
Terdapat gap antara cell rubber fender no 4 dermaga 7.3 dengan dinding dermaga |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 496 |
22 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Plat Area Ramdoor Kapal Roro Dermaga 7.3
Plat area ramdoor kapal roro dermaga 7.3 mencuat akibat las-lasanya lepas |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 497 |
20 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 3
CIGADING 1
|
Fender No 5 Dermaga 3
Perbaikan fender no 5 dermaga 3 meliputi perbaikan frontal pad dan pengencangan safety chains |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018572 |
In Process |
||
| 498 |
20 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.2
CIGADING 1
|
Fender No 6 Dermaga 1.2
1 pcs baut pengingat coupling frame fender tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 499 |
17 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Beton Balok Tepi Dermaga 1.3 (posisi antara fender no 5 dan no 6)
kerusakan beton balok tepi dermaga 1.3 (posisi antara fender no 5 dan no 6) akibat terkena ramdoor kapal roro |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 500 |
17 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Crane Track Dermaga 1.3 (jalur MPC/sudah tidak terpakai)
Kerusakan siku crane track di dermaga 1.3 akibat terkena ramdoor kapal roro |
RUSAK BERAT
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 501 |
17 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Fender No 6 Dermaga 1.3
2 pcs frontal pad fender no 6 dermaga 1.3 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 502 |
16 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender No 19 Dermaga 6
Terdapat gap/jarak antara cell rubber dengan dinding dermaga |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 503 |
15 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Hydrant No 2 Dermaga 7.2
Pengencangan valve hydrant no 2 dermaga 7.2 yang belum tertutup rapat |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 504 |
14 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 3
CIGADING 1
|
Hydrant No 4 Dermaga 3
Penggantian elbow HDPE pada hydrant no 4 dermaga 3 |
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018537 |
In Process |
||
| 505 |
14 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Hydrant No 1 Dermaga 5
Pengencangan / penutupan hydrant no 1 dermaga 5 yang semula rembes / mengalir air debit yang kecil |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 506 |
14 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Fender Darurat Tiang No 6 (dari anyer)
fender darurat pada tiang no 6 (dari anyer) robek pada bagian atas |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 507 |
14 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Fender Darurat Tiang No 3 (dari anyer)
Posisi fender darurat pada tiang no 3 tidak pada posisi yang seharusnya |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 508 |
13 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Fender No 3 Dermaga 1.1
Kondisi frontal pad fender no 3, bagian atas terkikis berat dan ada beberapa frontal pad yang sudah tipis |
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 509 |
13 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Beton Balok Tepi Dermaga 1.1
Beton balok tepi dermaga 1.1 terlepas dari lantai dermaga, lokasi berada di antara fender no 4 dan 5 dermaga 1.1 |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 510 |
11 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Hydrant No 4 Dermaga 1.3
Hydrant No 4 Dermaga 1.3, Tergenang |
KOTOR
REQUEST BERSIHKAN
|
Medium | Outstanding |
||
| 511 |
11 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Hydrant No 3 Dermaga 1.3
Hydrant No 3 Dermaga 1.3 Tergenang, bersihkan |
KOTOR
REQUEST BERSIHKAN
|
Medium | Outstanding |
||
| 512 |
10 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Lantai Dermaga 4.2
Lantai dermaga 4.2 mengalami kerusakan |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 513 |
10 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Plat Area Dilatasi Dermaga 4.1
Plat area dilatasi dermaga 4.1 tidak rata dengan beton lantai dermaga |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 514 |
09 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1
CIGADING 1
|
Papan Nama Dermaga 1.2 (di belakang tower 11)
Papan nama dermaga 1.3 di belakang tower 11 jatuh |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 515 |
09 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender No 32 Dermaga 6
3 pcs frontal pad fender no 32 dermaga 6 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 516 |
08 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1
CIGADING 1
|
Pagar Pengaman Trestle 1
Pagar Pengaman Trestle 1 terjatuh ke laut akibat korosi berat |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018493 |
In Process |
||
| 517 |
08 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.6
CIGADING 1
|
Kondisi beton balok tepi dermaga 1.6 geser dan terlepas dari lantai dermaga
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018492 |
In Process |
||
| 518 |
08 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Kondisi beton balok tepi dermaga 1.5 geser dan terlepas dari lantai dermaga
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018491 |
In Process |
||
| 519 |
07 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Fender Darurat (eks ban loader) Dermaga 5 Dibeberapa titik fender darurat tidak berfungsi secara maksimal karena posisi yang kurang tepat dan ada beberapa yang sudah robek
|
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 520 |
06 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.6
CIGADING 1
|
Dinding Listplang Dermaga 1.6 (dekat fender no 15)
Perbaikan beton Listplang Dermaga 1.6 meliputi pekerjaan: - pemasangan perancah - pembobokan Listplang - pemasangan bekisting - pengecoran Listplang |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018445 |
In Process |
||
| 521 |
06 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1
CIGADING 1
|
Beton Pondasi Conveyor Counter Wight Tower 11
Perbaikan beton pondasi conveyor counter wight tower 11 pekerjaan meliputi ; - pembobokan beton pondasi - penguatan struktur tulangan - pengecoran pondasi |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018453 |
In Process |
||
| 522 |
03 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 4.2
CIGADING 1
|
Fender V No 12 Dermaga 4.2
1 psc mur fender V no 12 dermaga 4.2 tidak ada |
LAIK PAKAI
REQUEST PENAMBAHAN
|
No Priority | Outstanding |
||
| 523 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 7 Dermaga 1.4
Pada safety chains fender no 7 dermaga 1.4 terdapat terpal yang tersangkut, terpal yang tersangkut di safety chains sudah dibersihkan/diambil |
LAIK PAKAI
REQUEST BERSIHKAN
|
No Priority 130000018422 |
In Process |
||
| 524 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 25 (Laut)
Beton Pondasi Conveyor A101 No 25 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 525 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 23 (Laut)
Beton Pondasi Conveyor A101 No 23 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 526 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 23 (Darat)
Beton Pondasi Conveyor A101 No 23 (Darat) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 527 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 21 (Laut)
Beton Pondasi Conveyor A101 No 21 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 528 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 17 (Darat)
Beton Pondasi Conveyor A101 No 17 (Darat) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 529 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 16 (Laut)
Beton Pondasi Conveyor A101 No 16 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 530 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 16 (Darat)
Beton Pondasi Conveyor A101 No 16 (Darat) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 531 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 14 (Laut)
Beton Pondasi Conveyor A101 No 14 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 532 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 12 (Darat)
Beton Pondasi Conveyor A101 No 12 (Darat) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 533 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 10 (Laut)
Beton Pondasi Conveyor A101 No 10 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 534 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 9 (Laut)
Beton Pondasi Conveyor A101 No 9 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 535 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 6 (Laut)
Beton Pondasi Conveyor A101 No 6 (Laut) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 536 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 4 (Darat)
Beton Pondasi Conveyor A101 No 4 (Darat) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 537 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Beton Pondasi Conveyor A101 No 3 (Darat)
Beton Pondasi Conveyor A101 No 3 (Darat) mengalami spalling |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 538 |
02 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender No 7 Dermaga 6
Fender No 7 Dermaga 6 cell rubber pecah semenjak 13/11/2025 |
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 539 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Hydrant No 7 Dermaga 1.4
Tidak ada gate valve pada hydrant no 7 dermaga 1.4 |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000018410 |
In Process |
||
| 540 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Hydrant No 7 Dermaga 1.4
Manhole Hydrant No 7 Dermaga 1.4 terimbun materil batu bara, bersihkan |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018409 |
In Process |
||
| 541 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 5 Dermaga 1.4
Salah satu mata rantai safety chains fender no 5 dermaga 1.4 tidak terhubung, perbaiki safety chains |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018408 |
In Process |
||
| 542 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 3 Dermaga 1.4
Salah satu mata rantai safety chains fender no 3 dermaga 1.4 tidak terhubung, perbaiki safety chains |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018407 |
In Process |
||
| 543 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Hydrant No 8 Dermaga 2
Hydrant No 8 Dermaga 2 tertimbun material, bersihkan |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018414 |
In Process |
||
| 544 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Hydrant No 7 Dermaga 2
Handle gate valve hydrant no 7 dermaga 2 patah |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018413 |
In Process |
||
| 545 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Jalur Kabel Dermaga 2 (sejajar dengan hydrant no 5)
Jalur Kabel Dermaga 2 (sejajar dengan hydrant no 5) mengalami spalling sehingga tulangan terlihat berpotensi melukai kabel PHC |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018412 |
In Process |
||
| 546 |
01 Jul 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Jalur Kabel Dermaga 2 (sejajar dengan fender no 3)
Jalur Kabel Dermaga 2 (sejajar dengan fender no 3) mengalami spalling sehingga tulangan terlihat berpotensi melukai kabel PHC |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018411 |
In Process |
||
| 547 |
30 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Water supply Dermaga 5
8 pcs canal support water supply (pipa HDPE) mengalami korosi berat |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018030 |
In Process |
||
| 548 |
29 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Hydrant No 6 Dermaga 2
Handle gate valve hydrant no 6 dermaga 2 tidak ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018398 |
In Process |
||
| 549 |
29 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Hydrant No 5 Dermaga 2
Handle gate valve hydrant no 5 dermaga 2 tidak ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018397 |
In Process |
||
| 550 |
29 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Hydrant No 2 Dermaga 2
Hydrant no 2 Dermaga 2 tidak terdapat coupling, sehingga tidak bisa digunakan |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000018396 |
In Process |
||
| 551 |
29 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Hydrant No 1 Dermaga 2
1 pcs handle cover manhole hydrant no 1 dermaga 2 tidak ada |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018395 |
In Process |
||
| 552 |
27 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 3
CIGADING 1
|
Hydrant No 3 Dermaga 3
Hydrant No 3 Dermaga 3 tertimbun material batu bara |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018401 |
In Process |
||
| 553 |
27 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 3
CIGADING 1
|
Hydrant No 2 Dermaga 3
Hydrant no 2 Dermaga 3 tidak ada handle gate valvennya |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018400 |
In Process |
||
| 554 |
27 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 3
CIGADING 1
|
Hydrant No 1 Dermaga 3
Hydrant No 1 Dermaga 3 tertimbun material batu bara |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018401 |
In Process |
||
| 555 |
26 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Hydrant no 1 Dermaga 4.1
Safety H beam hydrant no 1 Dermaga 4.1 korosi dan penyok |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 556 |
25 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Hydrant No 8 Dermaga 1.4
Inspeksi dan perawatan minor hidrant no 8 dermaga 1.4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 557 |
25 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Hydrant no 7 Dermaga 1.4
Hydrant no 7 Dermaga 1.4 tidak ada 1 set gate valve, serta manhole tertimbun material |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000018410 |
In Process |
||
| 558 |
24 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Hydrant no 1 Dermaga 1.1
Perawatan minor / cleaning pada manhole hydrant no 1 D1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 559 |
24 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Hydrant no 1 Dermaga 1.1
Perawatan minor / cleaning pada manhole hydrant no 1 D1.1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 560 |
23 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Balok Frontal Pad Dermaga 5
Beberapa titik balok frontal pad Dermaga 5 jatuh ke laut / tidak ada |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 561 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 18 Dermaga 7.2
2 pcs frontal pad fender no 18 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 562 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 17 Dermaga 7.2
2 pcs frontal pad fender no 17 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 563 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 16 Dermaga 7.2
4 pcs frontal pad fender no 16 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 564 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 15 Dermaga 7.2
3 pcs frontal pad fender no 15 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 565 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 14 Dermaga 7.2
4 pcs frontal pad fender no 14 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 566 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 13 Dermaga 7.2
2 pcs frontal pad fender no 13 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 567 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 12 Dermaga 7.2
2 pcs frontal pad fender no 12 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 568 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 10 Dermaga 7.2
3 pcs frontal pad fender no 10 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 569 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 9 Dermaga 7.2
1 pcs frontal pad fender no 9 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 570 |
22 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender No 5 Dermaga 7.2
1 pcs frontal pad fender no 5 Dermaga 7.2 tidak ada |
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 571 |
19 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Hydrant Dermaga 4.2
Safety H beam hydrant Dermaga 4.2 korosi berat, |
LAIK PAKAI
REQUEST REPAIR
|
TIDAK |
|
Ready to Use |
|
| 572 |
18 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.7
CIGADING 1
|
Hydrant no 6 Dermaga 1.7
Hydrant no 6 Dermaga 1.7 gate valve 1 set tidak ada |
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000018359 |
In Process |
||
| 573 |
17 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.1
CIGADING 1
|
Fender no 14 Dermaga 7.1
Fender no 14 Dermaga 7.1 safety chains arah anyer tidak terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018353 |
In Process |
||
| 574 |
15 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Fender no 4 Dermaga 1.1
Fender no 4 Dermaga 1.1 frontal pad terkikis berat sehingga plat frame fender terlihat |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 575 |
13 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Hydrant No 1 Dermaga 1.4
Hydrant no 1 Dermaga 1.4 tergenang |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018357 |
In Process |
||
| 576 |
13 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Beton Balok Tepi Dermaga 1.4
Sebanyak 2 pcs beton balok tepi ukuran 2 meter dan 1 pcs beton balok tepi ukuran 1 meter Hancur 80% dan tulangan terlihat, lokasi di dekat fender no 5 D1.4 |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 577 |
12 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Beton Balok Tepi Dermaga 4.2
Hampir sebagian besar beton balok tepi Dermaga 4.2 hancur |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 578 |
11 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Area Dilatasi Trestle Dermaga 6
Dari 10 area dilatasi terdapat 1 (segmen nomor 9) yang aspal penutup plat area dilatasinya hampir 90% tidak ada, Sehingga terdapat beda tinggi dan plat terpapar langsung |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 579 |
10 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Fender Dermaga 2
Frontal pad pada fender-fender di Dermaga 2 mengalami luka/terkikis, Pada fender-fender berikut ; No 1, No 3, No 5, No 9, No 11 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 580 |
09 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Fender Darurat (eks ban loader) Dermaga 5
Dibeberapa titik fender darurat tidak berfungsi secara maksimal karena posisi yang kurang tepat |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 581 |
09 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Beton Balok Tepi Dermaga 5
Terdapat titik kerusakan beton balok tepi hingga terlihat tulangannya, posisinya diantara bollard no 2 dan 3 (dari arah merak) Dermaga 5 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 582 |
08 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Fender no 15 Dermaga 2
Perawatan minor pada fender no 15 Dermaga 2 ; - Pembersihan rope/tali pada safety chains |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 583 |
08 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.3
CIGADING 1
|
Hydrant no 3 Dermaga 7.3
Siku support hydrant no 3 lepas dan pipa hydrant bengkok |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 584 |
06 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender no 5 Dermaga 6
Ring plat baut fender no 5 korosi berat sehingga lepas |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 585 |
05 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Hydrant no 1 Dermaga 4.1
Safety H beam hydrant no 1 korosi berat, melengkung dan terlepas dari lantai dermaga |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 586 |
04 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Fender no 3 Dermaga 1.1
Frontal pad fender no 3 Dermaga 1.1 terkikis berat hingga plat frame fender terlihat |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 587 |
03 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Plat siku beton lantai Dermaga 7.2
Plat siku lepas dari beton lantai dermaga |
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018355 |
In Process |
||
| 588 |
02 Jun 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Pipa fender V Dermaga 5
Kerusakan pipa fender Dermaga 5 (pecah) |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 589 |
29 May 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Beton balok tepi Dermaga 4.1
Terdapat beberapa titik beton balok tepi Dermaga 4.1 yang hancur sampai terlihat tulangan |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 590 |
26 May 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Frontal pad no 77 Dermaga 5
Penambahan fender darurat (ban exloader) di frontal pad no 77 Dermaga 5 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 591 |
26 May 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Frontal pad no 73 Dermaga 5
balok frontal pad yang digantikan dengan balok kayu kelapa sudah tidak ada |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 592 |
25 May 2026
Kustiananda Windu Ryendi
|
Dermaga 7.1
CIGADING 1
|
Fender no 16 Dermaga 7.1
Terdapat baut fender yang kendor sehingga ketika frame fender terhempas ombak bergerak/goyang |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 593 |
25 May 2026
Kustiananda Windu Ryendi
|
Dermaga 7.1
CIGADING 1
|
Fender no 14 Dermaga 7.1
Safety chains bagian bawah arah anyer tidak terpasang |
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 594 |
21 May 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender V no 12 Dermaga 4.2
Baut pada fender V no 12 Dermaga 4.2 : - arah darat tidak center / bengkok 1 pcs - arah laut baut dan plat ring tidak ada masing-masing 1 pcs |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 595 |
21 May 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Fender V no 3 Dermaga 4.2
Baut pada fender V no 3 Dermaga 4.2 arah laut tidak center / bengkok |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 596 |
20 May 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Fender no 7 Dermaga 1.3
Terdapat balok kayu di atas site pile fender no 7 Dermaga 1.3 |
KOTOR
REQUEST BERSIHKAN
|
PANTAU 130000018352 |
In Process |
||
| 597 |
20 May 2026
Kustiananda Windu Ryendi
|
Dermaga 1.3
CIGADING 1
|
Beton Balok Tepi Dermaga 1.3
Terdapat beberapa titik kerusakan beton balok tepi di Deramga 1.3 |
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 598 |
19 May 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Beton Lantai Dermaga 5
Kondisi beton lantai dermaga 5 sangat baik |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 599 |
18 May 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Mooring Dolphin Dermaga1.1
Korosi pada area walkway mooring dolphin Dermaga 1.1 |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 600 |
13 May 2026
Kustiananda Windu Ryendi
|
Dermaga 7.2
CIGADING 1
|
Fender no 10 Dermaga 7.2
Pembersihan sampah (terpal) pada fender no 10 Dermaga 7.2 |
LAIK PAKAI
REQUEST BERSIHKAN
|
TIDAK | Ready to Use |
||
| 601 |
12 May 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Fender no 21 Dermaga 5
Kerusakan berat pada fender no 21 Dermaga 5 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 602 |
06 May 2026
Kustiananda Windu Ryendi
|
Dermaga 2
CIGADING 1
|
Fender no 4 Dermaga 2
1 pcs baut fender (arah darat) kendor, request kencangkan |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018040 |
In Process |
||
| 603 |
05 May 2026
Kustiananda Windu Ryendi
|
Dermaga 5
CIGADING 2
|
Water supply Dermaga 5
8 pcs canal support water supply (pipa HDPE) mengalami korosi berat |
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018030 |
In Process |
||
| 604 |
04 May 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Walkway Mooring Dolphin Dermaga 1.4 mengalami korosi berat
|
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 605 |
01 May 2026
Kustiananda Windu Ryendi
|
Dermaga 1.2
CIGADING 1
|
Fender no 9 Dermaga 1.2
Frame fender no 9 Dermaga 1.2 kontruksinya melengkung |
LAIK PAKAI
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 606 |
30 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Instalasi water supply D1.4, D1.7 dan D1.8
Pengecekan bersama dengan eksekutor kondisi instalasi water supply D1.4, D1.7 dan D1.8 Hydrant di D1.4 (no 1, 2, 3,4 dan 6) yang bisa digunakan Hydrant di D1.7 (no 1,2,3,4 dan 5 ) yang bisa digunakan Hydrand di D1.8 tidak ada jalur instalasi water supply |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 607 |
29 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 1.1
CIGADING 1
|
Fender no 2 Dermaga 1.1
Plat coupling frame fender no 2 Dermaga 1.1 korosi dan melengkung |
RUSAK BERAT
REQUEST GANTI
|
PANTAU | Ready to Use |
||
| 608 |
28 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 1.5
CIGADING 1
|
Fender no 1 Dermaga 1.5
Kondisi fender baik |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 609 |
27 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Beton Balok Tepi Dermaga 1.5
Beton balok tepi terlepas beton lantai dermaga posisi dekat dengan bollard no 4 |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 610 |
24 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 4
CIGADING 1
|
Beton lantai Dermaga 4.1
Terdapat 4 titik kerusakan (tulangan terlihat) beton lantai dengan ukuran beragam ; - 1,5 m x 1,5 m - 9 m x 9 m - 6 m x 6 m - 3 m x 4 m |
RUSAK BERAT
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 611 |
23 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender no 18 Dermaga 6
Pembersihan sampah/tali pada safety chains |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 612 |
23 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender no 13 Dermaga 6
Pembersihan sampah/tali pada safety chains |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 613 |
23 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 6
CIGADING 2
|
Fender no 11 Dermaga 6
Pembersihan sampah/tali pada safety chains |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 614 |
20 Apr 2026
Kustiananda Windu Ryendi
|
Dermaga 7.1
CIGADING 1
|
Pengecekan gate valve di Dermaga 7.1,
Gate valve no 1 Dermaga 7.1 bocor |
RUSAK RINGAN
REQUEST REPAIR
|
PANTAU | Ready to Use |
||
| 615 |
09 Mar 2026
Kustiananda Windu Ryendi
|
Dermaga 1.4
CIGADING 1
|
Fender No 7 Dermaga 1.4
Pada safety chains fender no 7 dermaga 1.4 terdapat terpal yang tersangkut, bersihkan |
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018422 |
In Process |
| NO | Tanggal / Petugas | Lokasi | Keterangan Aktivitas | Kondisi & Rekomendasi | Notifikasi | Dokumentasi | Status | Aksi |
|---|---|---|---|---|---|---|---|---|
| 1 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu Auxtrafo GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 2 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu main trafo GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 3 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu ruang elektrik GSU 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 4 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu motor Gsu-04
Holding Drive 46 Bearing 38 Fan 45 Closing Drive 54 Bearing 40 Fan 45 Trolley Drive 52 Bearing 37 Fan 46 Suhu Motor belt feeder GSU 04 Drive 35 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 5 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Motor drive closing terpantau Kotor di GSU 04 butuh di cleaning
|
KOTOR
REQUEST BERSIHKAN
|
Medium 130000019653 |
In Process |
||
| 6 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Main trafo GSU 04 butuh di cleaning
|
KOTOR
REQUEST BERSIHKAN
|
Medium 130000019652 |
In Process |
||
| 7 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 8 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 9 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Menghidupkan jalur lampu yg mati di area boom GSU 04
Setelah di cek lampu yg mati hanya 1pcs di sebelah anyer |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019651 |
In Process |
||
| 10 |
21 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Motor creeper gantry GSU 04 tidak 2pcs, 1pcs sebelah laut dan 1pcs sebelah darat
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
Medium 130000019650 |
In Process |
||
| 11 |
21 Nov 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Pengukuran suhu motor Gsu-01
Motor drive belt feeder 36 Holding Drive 59 Bearing 40 Fan 36 Closing Drive 51 Bearing 39 Fan 46 Trolley Drive 49 Bearing 38 Fan 47 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 12 |
21 Nov 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Penggantian filter motor fan holding closing trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 13 |
21 Nov 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Lampu LED 18 watt ruang panel elektrik mati 5 pcs GSU-01, rekues ganti
|
LAIK PAKAI
REQUEST GANTI
|
Medium 130000019648 |
In Process |
||
| 14 |
21 Nov 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Kontaktor EH700 dengung posisi di panel drive trolley/boom GSU-01, rekues servis
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019649 |
In Process |
||
| 15 |
20 Nov 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Hasil tes running setelah di cleaning bucket elevator SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 16 |
20 Nov 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning fan motor bucket feeder before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 17 |
19 Nov 2026
Anton Diki W
|
Dermaga 5
CIGADING 2
|
Pengukuran suhu ruang trafo dermaga 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 18 |
19 Nov 2026
Hasyim Alhabsyi
|
Dermaga 5
CIGADING 2
|
Inspeksi lampu penerangan dermaga 5, kondisi lampu ok terang semua
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 19 |
18 Nov 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Lampu indikator RST (warna Merah) di panel gate hooper terbakar (meleleh). Req. Ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000019628 |
Completed |
||
| 20 |
18 Nov 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Kontak emergency button di panel gate hooper terbakar (meleleh). Req. Ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000019629 |
Completed |
||
| 21 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang elektrik DLLC 04 26,6 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 22 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang trafo DLLC 04 32,0 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 23 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Suhu ruang gantry 30.6 derajat celcius DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 24 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 25 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Kondisi ruang cabin operator banyak putung rokok, rekues cleaning DLLC-04
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 26 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Grounding yang ada di dalem pintu panel ruang elektrik putus 2pcs request ganti , DLLC 04
- panel SLM 1 cubicle - Hold MM cubicle |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019624 |
In Process |
||
| 27 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Lampu led 15watt yg ada di dalem panel elektrik mati 1pcs request ganti DLLC 04
- panel Slew/Gantry Switch Cubicle |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019625 |
In Process |
||
| 28 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Kondisi Slipring DLLC 04 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 29 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Baut chamswitch holding baut lepas 1 pcs, sementara di tyrap DLLC-04
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000019626 |
In Process |
||
| 30 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Relay impulse di panel gantry terpantau dengung ( =14C-K24 ) , request ganti DLLC 04
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019627 |
In Process |
||
| 31 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
kondisi slipring kabel drum 6kV untuk saat ini masih terpantau amann dan bersih DLLC 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 32 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Grounding area gantry DLLC 04 terpantau lengkap
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 33 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Motor vibro Hopper DLLC 04 tidak terpasang 1pcs sebelah laut bagian merak
|
RELEASE
BY EXECUTOR
|
PANTAU | Completed |
||
| 34 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengetesan gate Hooper open / close : OK DLLC 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 35 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning panel gate hopper before & after DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 36 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning dan lubrikasi motor creeper gantry DLLC 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 37 |
18 Nov 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning dan lubrikasi roll pendulum medium voltage DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 38 |
18 Nov 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Chamswitch holding closing baut lengkap, kondisi aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 39 |
18 Nov 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Cleaning dan lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 40 |
18 Nov 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Ruang cabin operator banyak putung rokok, rekues cleaning
|
LAIK PAKAI
REQUEST BERSIHKAN
|
Medium | Outstanding |
||
| 41 |
18 Nov 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Kondisi slipring terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 42 |
17 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Lampu stadion mati 3 pcs rekues ganti LED posisi Merak Conv A101
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018880 |
In Process |
||
| 43 |
17 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu panel P1A 30,5 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 44 |
17 Nov 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Cleaning underspeed posisi tail conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 45 |
17 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Lampu stadion mati 3 pcs rekues ganti LED posisi Anyer conv A101
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 46 |
17 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Cleaning underspeed posisi tail Conv A101
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 47 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu indikator cabin operator mati 3 pcs GSU-06.
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019594 |
In Process |
||
| 48 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Tombol Sakelar untuk Cabin Flood Light di panel ruang cabin operator rusak. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019600 |
In Process |
||
| 49 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Stop kontak 220VAC di cabin operator pong. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019602 |
In Process |
||
| 50 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Lampu indikator untuk tombol Hopper Gate Open di cabin operator mati 1 pcs. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019601 |
In Process |
||
| 51 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing
kondisi ok di GSU-05 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 52 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding,
kondisi ok di GSU-05 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 53 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch boom
kondisi ok di GSU-05 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 54 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lampu LED 18 watt ruang motor room mati 6 pcs GSU-05, rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019593 |
In Process |
||
| 55 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengukuran suhu ruang panel elektrik GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 56 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 57 |
16 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 58 |
16 Nov 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Cleaning dan lubrikasi roll pendulum medium voltage GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 59 |
16 Nov 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Cleaning dan lubrikasi zerospeed GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 60 |
16 Nov 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kiri
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 61 |
16 Nov 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kanan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 62 |
16 Nov 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor drive CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 63 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning dan lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 64 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Panel lift GSU-05 kotor, rekues cleaning
Fan panel GSU-05 kotor, rekues cleaning |
LAIK PAKAI
REQUEST BERSIHKAN
|
Medium 130000019598 |
In Process |
||
| 65 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu LED motor room mati 4 pcs, rekues ganti
Dudukan lampu di motor room ada yang patah, rekues servis |
LAIK PAKAI
REQUEST GANTI
|
Medium 130000019599 |
In Process |
||
| 66 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu LED 18 watt walkway boom mati 38 pcs, rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019593 |
In Process |
||
| 67 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning dan lubrikasi zerospeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 68 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Cleaning panel cabin desk operator
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 69 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Kabel vibrating GSU-06 sobek akibat tergesek, rekues servis
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019595 |
In Process |
||
| 70 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Panel lift GSU-06 kotor, rekues cleaning
Fan panel GSU-06 kotor, rekues cleaning |
LAIK PAKAI
REQUEST BERSIHKAN
|
Medium 130000019597 |
In Process |
||
| 71 |
16 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Pengencangan baut LSA CPA Gantry
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 72 |
14 Nov 2026
Anton Diki W
|
Conveyor BCNO
CIGADING 1
|
Pengecekan suhu motor BCNO :
Motor 1 Drive 47 Bearing 45 Brake 46 Motor 2 Drive 45 Bearing 43 Brake 50 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 73 |
14 Nov 2026
Anton Diki W
|
Conveyor C02
CIGADING 1
|
Pengecekan suhu motor C02 :
Motor 1 Drive 49 Bearing 44 Brake 47 Motor 2 Drive 48 Bearing 46 Brake 48 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 74 |
14 Nov 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Pengukuran suhu ruang panel tower 11
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 75 |
14 Nov 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Pengukuran suhu motor :
PBCN-01 : Drive 49 Bearing 41 Brake 46 PBCN-02 : Drive 54 Bearing 48 Brake 54 Fan 41 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 76 |
14 Nov 2026
Anton Diki W
|
Conveyor C02
CIGADING 1
|
Proses cleaning motor drive C02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 77 |
14 Nov 2026
Anton Diki W
|
Tower 2
CIGADING 1
|
Fan di panel kapasitor mati lokasi di tower 2 , request service
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019554 |
In Process |
||
| 78 |
14 Nov 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Cleaning motor drive PBCN 01 dan PBCN 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 79 |
14 Nov 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lubrikasi underspeed GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 80 |
14 Nov 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran suhu motor belt feeder GSU-01 :
Drive 37,9 derajat celcius Bearing 35,7 derajat celcius |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 81 |
14 Nov 2026
Anton Diki W
|
Conveyor PBCN 2
CIGADING 1
|
Dudukan sling pullcord di conveyor PBCN 02 tidak terpasang di conveyor nomor 80 , rekues pasang
|
RELEASE
BY EXECUTOR
|
Medium 130000019553 |
Completed |
||
| 82 |
14 Nov 2026
Hasyim Alhabsyi
|
Conveyor C02
CIGADING 1
|
Cleaning motor drive 1&2 C02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 83 |
14 Nov 2026
Hasyim Alhabsyi
|
Conveyor BCNO
CIGADING 1
|
Cleaning motor drive 1&2 BCNO
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 84 |
14 Nov 2026
Hasyim Alhabsyi
|
Conveyor C02
CIGADING 1
|
Pengukuran suhu VSD motor 1 & 2
Hasil pengukuran sebesar 43,7 & 44,8 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 85 |
14 Nov 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Cleaning motor drive
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 86 |
14 Nov 2026
Hasyim Alhabsyi
|
Conveyor PBCN 2
CIGADING 1
|
Cleaning motor drive
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 87 |
14 Nov 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Pengukuran suhu motor belt feeder GSU-04 :
Drive 38,8 derajat celcius Bearing 37,8 derajat celcius |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 88 |
14 Nov 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Lubrikasi zerospeed GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 89 |
13 Nov 2026
Hasyim Alhabsyi
|
Dermaga 1
CIGADING 1
|
Pemasangan alat SS Monitoring suhu dan kelembapan di Capasitor Bank
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 90 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengukuran suhu ruang panel elektrik GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 91 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 92 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 93 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch boom terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 94 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lampu LED walkways boom 18watt mati 35 pcs. GSU-05 request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 95 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu LED motor room mati 8 pcs
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 96 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Dudukan lampu motor room patah, rekues repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 97 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Chamswitch boom terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 98 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Chamswitch closing terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 99 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Kondisi chamswitch holding terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 100 |
12 Nov 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi motor gate Hooper GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 101 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 102 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lubrikasi roll festune area belakang cabin operator.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 103 |
12 Nov 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Cleaning dan lubrikasi 4 titik motor creeper brake gantry.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 104 |
11 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu trafo GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 105 |
11 Nov 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran suhu trafo GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 106 |
11 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu ruang panel elektrik GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 107 |
11 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 108 |
11 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Grounding di area Motor creeper gantry tidak terpasang GSU 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 109 |
11 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Motor creeper gantry GSU 04 tidak terpasang 2pcs, 1pcs sebelah laut dan 1pcs sebelah darat
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 110 |
11 Nov 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Cleaning motor powerpack gate feeder GSU 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 111 |
10 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu motor drive A101 :
Drive 40 Bearing 37 Fan 38 Brake 43 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 112 |
10 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Dudukan sling pullcord A101 patah di tiang nomor 200 , rekues repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 113 |
10 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Cleaning dan lubrikasi safety device area conveyor A101
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 114 |
10 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Lubrikasi safety device area conveyor
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 115 |
10 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu trafo panel P1A 36,0 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 116 |
10 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu ruang panel P1A 30,5 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 117 |
10 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Tray kabel pada tiang no 13 & 14 patah & korosi, rekues ganti tray
|
LAIK PAKAI
REQUEST GANTI
|
Low | Outstanding |
||
| 118 |
10 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Tray kabel tiang nomor 9 struktur ujung tray rekues di pasang pengaman, agar terhindar dari luka pada kabel
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 119 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Pengukuran suhu ruang elektrik 26,9 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 120 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Pengukuran suhu ruang trafo 33,2 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 121 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Pengukuran suhu panel gantry 31,1 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 122 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Selektor auto manual pada panel powerpack terbakar akibat kemasukan air dan kotoran Karena pintu panel tidak tertutup rapat dan kunci nya tidak ada , request ganti , DLLC 01
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019501 |
In Process |
||
| 123 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Lampu led 15watt yg ada di dalem panel elektrik mati 2pcs request ganti DLLC 01
- panel cubicle - panel slew/Gantry MM cubicle |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019504 |
In Process |
||
| 124 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
CPU di ruang panel elektrik kondisi mati butuh di service
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019503 |
In Process |
||
| 125 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Kondisi Slipring DLLC 01 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 126 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Chamswitch holding DLLC 01 terpantau lengkap
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 127 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Trafo DLLC 01 kondisi kotor, request cleaning
|
KOTOR
REQUEST BERSIHKAN
|
Medium 130000019500 |
In Process |
||
| 128 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Roll pendulum medium voltage DLLC-01 macet 4 Pcs , request service
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019497 |
In Process |
||
| 129 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Grounding area gantry DLLC 01 terpantau Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 130 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning dan lubrikasi roll pendulum medium voltage DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 131 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning dan lubrikasi motor creeper gantry DLLC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 132 |
09 Nov 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning powerpack gate Hooper dan panel gate Hooper DLLC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 133 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Buzzer indikator di ruang cabin operator mati, rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019494 |
In Process |
||
| 134 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Kondisi slipring terpantau aman (ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 135 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Terdapat percikan bunga api pada relay 24V di panel gate hooper DLLC-02 sisi kanan.
Req. Ganti |
RELEASE
BY EXECUTOR
|
Medium 130000019496 |
Completed |
||
| 136 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Push button untuk gate corong sisi laut di hopper DLLC-02 tidak berfungsi. Power dari pushbutton tidak sampai ke Selenoid, sehingga tidak bisa menggerakan gate untuk buka / tutup. Req. Service
|
RELEASE
BY EXECUTOR
|
Medium 130000019495 |
Completed |
||
| 137 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Chamswitch holding closing terpantau aman, baut lengkap
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 138 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning dan lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 139 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning dan lubrikasi motor creeper gantry,
Motor creeper gantry tidak terpasang 1 pcs |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 140 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning motor powerpack gate hopper
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 141 |
09 Nov 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
motor eldro brake gantry DLLC 02 No. 1 sebelah laut anyer belum terpasang. req. pasang
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017481 |
In Process |
||
| 142 |
09 Nov 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Motor gantry di DLLC-02 sisi laut anyer, belum terpasang. Request pasang
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000016734 |
In Process |
||
| 143 |
07 Nov 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan cleaning motor drive holding, closing, slewing
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 144 |
07 Nov 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi kontrol elektrik dan mekanis gate hooper PHC-01. Proses buka-tutup gate normal, tidak ada kendala.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 145 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu ruang elektrik 30,2 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 146 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu ruang trafo 44,8 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 147 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu ruang gantry 42,1 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 148 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Inspeksi dan pengencangan baud di ruang panel elektrik
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 149 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Dinding motor room di bagian merak ( dekat pintu ) ada yg bolong , request repair
|
LAIK PAKAI
REQUEST REPAIR
|
Low | Outstanding |
||
| 150 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Grounding area gantry terpantau terpasang semua PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 151 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Bridge crane PHC 02 kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 152 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Cleaning motor kabel drum medium voltage PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 153 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Kondisi Slipring PHC 02 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 154 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
cleaning power pack break holding , closing dan luffing PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 155 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
exhaust fan noise kasar req. service PHC 02
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000018901 |
In Process |
||
| 156 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Exhaust fan ruang trafo mati 1 sebelah anyer PHC 02
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019291 |
In Process |
||
| 157 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor creeper No.3 sebalah darat anyer tidak terpasang req. Pasang , PHC 02
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 158 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor gantry No.5 sebalah darat merak tidak terpasang req. Pasang
PHC 02 |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 159 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Cleaning motor powerpack gate Hooper dan panel powerpack gate Hooper PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 160 |
07 Nov 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Cleaning dan lubrikasi motor creeper gantry PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 161 |
07 Nov 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cleaning dan lubrikasi motor creeper gantry
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 162 |
07 Nov 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cleaning motor powerpack gate hopper
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 163 |
07 Nov 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cleaning dan lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 164 |
07 Nov 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Ruang trafo kotor, rekues cleaning
|
RELEASE
BY EXECUTOR
|
TIDAK | Completed |
||
| 165 |
06 Nov 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Preventive program running inspeksi CCSU, pengukuran suhu motor CCSU :
Semua keterangan suhu menggunakan Celcius. • Motor main pump 45,7 derajat • Motor emergency pump 49,8 derajat • Motor feeding pump 44,4 derajat • Motor fan 49.3 derajat Motor CC3 Fan 1 46,7 derajat Fan 2 49,2 derajat Drive 41,8 derajat Bearing 40,8 derajat |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 166 |
05 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Cleaning baterai 12V untuk panel charging yang mengalami oksidasi
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 167 |
05 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Kabel tray korosi di sisi kanan trafo room Conveyor A101. Kabel tray di ganjel besi tanpa siku penahan. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019434 |
In Process |
||
| 168 |
05 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Titik ke 2 untuk kabel tray yang korosi di sisi kanan trafo room Conveyor A101. Request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019433 |
In Process |
||
| 169 |
05 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu panel VCB 30,3 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 170 |
05 Nov 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Kabel tray di belakang Trafo Conveyor A101 korosi. Req. Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019008 |
In Process |
||
| 171 |
05 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Kontaktor panel charging (ruangan VCB) dengung, request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019482 |
In Process |
||
| 172 |
05 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu panel P1A 29,2 derajat Celcius. Kondisi sedang running
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 173 |
05 Nov 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu motor drive A101 :
Drive 39 Bearing 37 Fan 37 Brake 43 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 174 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Pengukuran suhu ruang panel elektrik 24.4 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 175 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Pengukuran suhu ruang trafo 34.6 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 176 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Pengukuran suhu ruang panel gantry 30.6 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 177 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Kondisi Slipring DLLC 03 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 178 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Grounding di area luffing terpantau lengkap ( oke )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 179 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Baut chamswitch holding DLLC 03 terpantau lengkap
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 180 |
04 Nov 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Lubrikasi dan cleaning motor creeper gantry DLLC 03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 181 |
04 Nov 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Lampu boom mati 1 pcs, rekues ganti
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 182 |
04 Nov 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Kondisi slipring terpantau aman (ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 183 |
04 Nov 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Cleaning motor creeper gantry
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 184 |
04 Nov 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Cleaning dan lubrikasi roll pendulum medium voltage
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 185 |
04 Nov 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Cleaning panel gate hopper
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 186 |
04 Nov 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
area ruang panel gantry DLLC-04 mati. Pengecekan Sakelar, ada Power nya.
Req. Pengecekan jalur kabel dan penggantian lampu TL 8W (jika dibutuhkan) |
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 187 |
03 Nov 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Pengukuran lampu penerangan ruang panel P1C, kondisi lampu LED menyala semua (ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 188 |
03 Nov 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Pengukuran lampu penerangan ruang panel P1B, kondisi lampu LED menyala semua (ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 189 |
03 Nov 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu panel P1C 30.5 derajat Celcius. Kondisi sedang running
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 190 |
03 Nov 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu panel P1B 29.5 derajat Celcius. Kondisi sedang running
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 191 |
02 Nov 2026
Hasyim Alhabsyi
|
Dermaga 1
CIGADING 1
|
Lampu penerangan dermaga 1.1 mati 1 pcs tiang no 2 dari anyer, rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 192 |
02 Nov 2026
Anton Diki W
|
Dermaga 1
CIGADING 1
|
Terminal power area dermaga 1.1 kondisi ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 193 |
02 Nov 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Cleaning motor drive pbcn
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 194 |
02 Nov 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Underspeed conveyor PBCN 01 dan PBCN 02 Kondisi Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 195 |
02 Nov 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Beltsway dan emergency berfungsi dengan aman dan ok✅
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 196 |
02 Nov 2026
Hasyim Alhabsyi
|
Conveyor C02
CIGADING 1
|
Dudukan underspeed C02 patah (korosi), rekues repai
|
RELEASE
BY EXECUTOR
|
Medium 130000019386 |
Completed |
||
| 197 |
31 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning panel elektrik mainpump
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 198 |
31 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning ruang panel elektrik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 199 |
31 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU (before) dan ( after )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 200 |
31 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning paddleswitch CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 201 |
31 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Rotary Lamp indikator Traveling mati di 3 titik.
sisi Merak -Darat mati, sisi Anyer - Darat mati, sisi Anyer - Laut mati. |
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019360 |
In Process |
||
| 202 |
31 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning sensor sink in & sink out HL SKT CCSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 203 |
29 Oct 2026
Hasyim Alhabsyi
|
Dermaga 6
CIGADING 2
|
Fotocell lampu Threstle Dermaga 6 panel Nomor 2 dan Nomor 7 dari arah Darat rusak. Req. Ganti
note : secara fungsi, fotocell masih bagus |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019347 |
In Process |
||
| 204 |
29 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Melakukan pengukuran Megger Motor CC2 CSU di Workshop
Note : motor CC2 rembes. Rekues ganti seal U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019344 |
In Process |
||
| 205 |
29 Oct 2026
Anton Diki W
|
Dermaga 6
CIGADING 2
|
Pengecekan Lampu penerangan Threstle Dermaga 6
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 206 |
29 Oct 2026
Anton Diki W
|
Dermaga 6
CIGADING 2
|
Lampu penerangan Threstle Dermaga 6 tiang ke 10 panel no 05 dari arah darat mati 1pcs
Note : power di kabel on |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
Medium | Outstanding |
||
| 207 |
29 Oct 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Lubrikasi dan cleaning area safety device conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 208 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 209 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 210 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch boom terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 211 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 212 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU 05 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 213 |
28 Oct 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 214 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 215 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch holding terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 216 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch boom terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 217 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 218 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Kabel glend motor vibrating GSU 06 luka/sobek , langsung action , sementara di rubber lalu di vinyl
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 219 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 220 |
28 Oct 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Pengencangan baud LSA CPA GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 221 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Pintu panel auxiliary engselnya patah, rekues repair
|
RELEASE
BY EXECUTOR
|
Medium 130000019327 |
Completed |
||
| 222 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning dan lubrikasi underspeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 223 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Pengencengan baut panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 224 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Lampu boom sebelah anyer GSU-05 mati 1 pcs
|
RELEASE
BY EXECUTOR
|
Medium 130000019326 |
Completed |
||
| 225 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu boom sebelah anyer GSU-06 mati 1 pcs
|
RELEASE
BY EXECUTOR
|
Medium 130000019324 |
Completed |
||
| 226 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Cleaning dan lubrikasi underspeed GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 227 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Cleaning dan lubrikasi roll pendulum medium voltage GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 228 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran jalur input zerospeed GSU-01 sistem 1 PBCN 01 (hasil ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 229 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran jalur input zerospeed GSU-01 sistem 2 PBCN 02 (hasil ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 230 |
28 Oct 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran jalur input zerospeed GSU-04 sistem 2 PBCN 02 (hasil ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 231 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor drive closing GSU 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 232 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning magnet switch GSU 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 233 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Inspeksi Jalur sling komunikasi cabin operator no 2 dari cabin kondisi sling rantas GSU 01 , request ganti
|
RELEASE
REQUEST GANTI
|
Low 130000019329 |
Completed |
||
| 234 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Rapihkan kabel yg muai / terbakar ( potong ) zerospeed sebelah laut PBCN 01
Request repair |
RELEASE
REQUEST REPAIR
|
Low 130000019328 |
Completed |
||
| 235 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning zerospeed sistem 1&2 GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 236 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor gate power pack dan panel gate powerpack GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 237 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Motor creeper gantry GSU 01 tidak 3pcs, 1pcs sebelah laut dan 2pcs sebelah darat
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 238 |
28 Oct 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Motor gantry GSU 01 tidak terpasang 3pcs sebelah laut
|
RELEASE
BY EXECUTOR
|
PANTAU | Completed |
||
| 239 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Grounding area Motor creeper gantry sebelah laut hilang, rekues pasang
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
PANTAU 130000019654 |
In Process |
||
| 240 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Motor creeper gantry tidak terpasang 3 pcs, rekues pasang
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 241 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor drive trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 242 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Cleaning motor powerpack belt feeder hopper GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 243 |
28 Oct 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Cleaning dan lubrikasi zerospeed sistem 1 dan 2 di GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 244 |
27 Oct 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu motor drive A101 :
Drive 44 Bearing 44 Fan 38 Brake 43 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 245 |
27 Oct 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Dudukan sling pullcord A101 patah di tiang nomor 200 , rekues repair
|
LAIK PAKAI
REQUEST REPAIR
|
Medium 130000019309 |
In Process |
||
| 246 |
27 Oct 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu ruang panel elektrik
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 247 |
27 Oct 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Lubrikasi safety device area conveyor A101
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 248 |
27 Oct 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Pengecekan lampu penerangan area tail conveyor A101. Semua lampu dalam kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 249 |
27 Oct 2026
Hasyim Alhabsyi
|
Dermaga 6
CIGADING 2
|
Lampu penerangan 120W di Dermaga 6 pada tiang No.10 (dihitung dari arah Anyer), nyala sebagian (rusak). Request Ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000018596 |
Completed |
||
| 250 |
26 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Pengukuran pencahayaan panel room elektrik dengan alat Lux meter di PHC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 251 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu ruang trafo 48 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 252 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu ruang panel gantry 42 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 253 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu motor PHC-02 :
HOLDING drive 42 Bearing 41 Fan 51 Brake 1 & 2 45 43 CLOSING Drive 48 Bearing 44 Fan 52 Brake 1 & 2 48 47 SLEWING 1 Drive 42 Bearing 40 Fan 41 Brake 45 SLEWING 2 Drive 47 Bearing 42 Fan 41 Brake 48 LUFFING Drive 39 Bearing 35 Fan 38 Brake 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 254 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
cleaning power pack break holding , closing dan luffing PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 255 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
exhaust fan noise kasar req. service PHC 02
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000018901 |
In Process |
||
| 256 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Exhaust fan ruang trafo mati 1 sebelah anyer PHC 02
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019291 |
In Process |
||
| 257 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor creeper No.3 sebalah darat anyer tidak terpasang req. Pasang , PHC 02
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium | Outstanding |
||
| 258 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor gantry No.5 sebelah darat merak tidak terpasang req. Pasang
PHC 02 |
RUSAK RINGAN
REQUEST SERVICE
|
Medium | Outstanding |
||
| 259 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Kondisi Slipring PHC 02 terpantau OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 260 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Cleaning motor powerpack gate Hooper dan panel powerpack gate Hooper PHC 02 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 261 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Cleaning motor creeper gantry PHC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 262 |
26 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Kabel power incoming Drive VSD Closed/gantry PHC-02 kabel power indikasi muai/terbakar. Suhu kabel 48 ⁰C sebelum panel di buka, setelah panel dibuka menjadi 40 ⁰C. Perbandingan dengan yang lain 30 ⁰C. Req.repair
Sudah di infokan ke. Cc-elektrik cg1 Pak haykal Mas suleman (Akan dilakukan perbaikan setelah bongkaran gandum selesai est.2 hari, sementara dilakukan pengecekan suhu secara berkala oleh elektrik shift) |
RELEASE
BY EXECUTOR
|
Medium 130000019292 |
Completed |
||
| 263 |
26 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Kondisi ruang trafo kotor, rekues cleaning
|
LAIK PAKAI
REQUEST BERSIHKAN
|
PANTAU | Ready to Use |
||
| 264 |
26 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Kondisi slipring PHC-01 terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 265 |
26 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01
HOLDING Fan 47 Drive 40 Bearing 40 Brake 1 & 2 41 & 41 CLOSING Fan 50 Drive 47 Bearing 51 Brake 1 & 2 52 & 51 SLEWING 1 Fan 40 Drive 45 Bearing 43 Brake 1 50 SLEWING 2 Fan 41 Drive 47 Bearing 43 Brake 1 51 LUFFING Fan 40 Drive 37 Bearing 36 Brake 1 37 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 266 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran pencahayaan ruang panel room dengan alat Lux meter di DLLC-03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 267 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengecekan lampu penerangan di seluruh titik Crane DLLC-03, kondisi OK dan kondisi Normal semua.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 268 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu motor DLLC-04:
HOLDING Fan 48 Drive 47 Bearing 42 Brake 1 & 2 49 & 50 CLOSING Fan 47 Drive 45 Bearing 40 Brake 1 & 2 51 & 54 SLEWING 1 Fan 49 Drive 41 Bearing 40 Brake 1 45 SLEWING 2 Fan 50 Drive 42 Bearing 40 Brake 1 46 LUFFING Fan 42 Drive 41 Bearing 34 Brake 1 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 269 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang panel elektrik 31 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 270 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang trafo 32 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 271 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang panel Gantry 29 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 272 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Kondisi Slipring DLLC 04 untuk saat ini masih terpantau OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 273 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning motor creeper gantry DLLC 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 274 |
24 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning panel gate Hooper DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 275 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
exhaust fan motor room berdengung, kemungkinan sementara dari bearing fan motornya. Rekues servis
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000019284 |
In Process |
||
| 276 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu motor DLLC-03:
HOLDING Fan 46 Drive 43 Bearing 40 Brake 1 & 2 53 & 55 SLEWING 2 Fan 45 Drive 39 Bearing 38 Brake 1 37 LUFFING Fan 40 Drive 38 Bearing 36 Brake 1 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 277 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu motor fan closing 45 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 278 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu motor drive closing 44 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 279 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Kondisi slipring terpantau aman (bersih) DLLC-03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 280 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu bearing motor slewing 1 36 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 281 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu ruang panel elektrik 25 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 282 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu motor fan slewing 45 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 283 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu brake slewing 41 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 284 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu drive motor slewing 1 arah laut 37 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 285 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu ruang trafo 29 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 286 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengencangan baud panel gantry yang kendor (berakibat getaran saat running)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 287 |
24 Oct 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Pengukuran suhu ruang panel gantry 23 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 288 |
23 Oct 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 289 |
23 Oct 2026
Hasyim Alhabsyi
|
Feeding SGT
CIGADING 1
|
Cleaning safety device area bucket conveyor SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 290 |
23 Oct 2026
Hasyim Alhabsyi
|
Feeding SGT
CIGADING 1
|
Pengecekan kontrol fan blower dan cleaning panel kontrolnya.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 291 |
23 Oct 2026
Hasyim Alhabsyi
|
Feeding SGT
CIGADING 1
|
Pengencangan baut-baut di panel Feeding SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 292 |
22 Oct 2026
Anton Diki W
|
Dermaga 5
CIGADING 2
|
Kontaktor lampu dermaga 5 terpantau dengung , pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 293 |
22 Oct 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Melakukan inspeksi elektrik di area Dermaga 5, Pengecekan trafo, Panel power lampu penerangan, dan lampu penerangan. Kondisi lampu penerang D5 sudah OK (nyala) untuk semua tiang.
Tiang 1 dan 3 dari Anyer menggunakan fotocell (beda jalur dengan tiang lainnya). |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 294 |
21 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning motor fan CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 295 |
21 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning motor drive CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 296 |
20 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Tray kabel conveyor A103 kabel bagian merak rusak. req. repair jalur
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019255 |
In Process |
||
| 297 |
20 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Lampu penerangan Conveyor A103 mati 3 pcs.
Sebelah anyer mati 1 Pcs No. 4 dari laut Sebelah merak 2 Pcs No. 1 dan No. 5 dari laut |
RELEASE
BY EXECUTOR
|
Medium 130000019254 |
Completed |
||
| 298 |
20 Oct 2026
Hasyim Alhabsyi
|
TFH & Feeding
CIGADING 2
|
Lampu LED Conveyor TFH mati 3 pcs, sebelah anyer 1 pcs. Sebelah darat 2 pcs, rekues ganti
|
LAIK PAKAI
REQUEST GANTI
|
Medium 130000019254 |
In Process |
||
| 299 |
20 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Main trafo P1C banyak sawangnya dan kotor, rekues cleaning
|
RELEASE
BY EXECUTOR
|
Medium 130000019253 |
Completed |
||
| 300 |
20 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Lubrikasi seluruh safety device di area Conveyor A103
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 301 |
20 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Ruang panel P1C dinding banyak yang retak dan ada lubang di sisi ac, rekues repair
|
RELEASE
BY EXECUTOR
|
PANTAU | Completed |
||
| 302 |
20 Oct 2026
Hasyim Alhabsyi
|
TFH & Feeding
CIGADING 2
|
Cover fan motor drive TFH korosi, rekues ganti
|
RELEASE
BY EXECUTOR
|
PANTAU | Completed |
||
| 303 |
20 Oct 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu motor drive A103
Motor 1 Drive 41 Fan 39 Bearing 36 Brake 40 Motor 2 Drive 37 Bearing 32 Fan 33 Brake 36 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 304 |
19 Oct 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Pengukuran suhu ruang trafo PHC-02 saat Shutdown Inspection.
Hasil pengukuran berada di range normal. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 305 |
19 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Cleaning panel cabin desk operator PHC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 306 |
19 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Kondisi slipring PHC-01 untuk saat ini terpantau Kotor , request cleaning
|
RELEASE
BY EXECUTOR
|
Low | Completed |
||
| 307 |
19 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Pengetesan gate Hooper open / close : OK , PHC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 308 |
19 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Cleaning dan lubrikasi creeper gantry PHC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 309 |
19 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Cleaning motor powerpack gate Hooper dan panel powerpack gate Hooper PHC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 310 |
19 Oct 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Kondisi slipring PHC-02 terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 311 |
19 Oct 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Cleaning motorpowerpack gate hopper PHC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 312 |
17 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Hasil Megger Motor gantry DLLC 04 no 08 sebelah merak
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 313 |
17 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Hasil Megger Motor gantry DLLC 04 no 02 sebelah laut
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 314 |
17 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Hasil Megger Motor gantry DLLC 04 no 06 sebelah darat
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 315 |
17 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Hasil Megger Motor gantry DLLC 04 no 04 sebelah laut oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 316 |
14 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Pengukuran suhu motor DLLC-04:
HOLDING Fan 45 Drive 42 Bearing 40 Brake 1 & 2 42 & 43 CLOSING Fan 45 Drive 42 Bearing 40 Brake 1 & 2 43 & 42 SLEWING 1 Fan 44 Drive 39 Bearing 36 Brake 1 39 SLEWING 2 Fan 45 Drive 41 Bearing 38 Brake 1 37 LUFFING Fan 41 Drive 38 Bearing 36 Brake 1 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 317 |
13 Oct 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Motor kanan Drive 41 Fan 42 Bearing 39 Motor kiri Drive 42 Bearing 38 Fan 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 318 |
13 Oct 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor single drive A102 :
Drive 39 Fan 37 Bearing 38 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 319 |
12 Oct 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 320 |
12 Oct 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Lubrikasi motor creeper brake gantry sisi laut dan darat.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 321 |
09 Oct 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 322 |
08 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Kondisi konekan dan dudukan motor pinlock PHC 01 sebelah darat korosi. request service.
|
RELEASE
BY EXECUTOR
|
Medium 130000019183 |
Completed |
||
| 323 |
08 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor pinlock phc-01 sebelah darat, Oke
U1 - G : 110 Mohm V1 - G : 110 Mohm W1 - G : 110 Mohm U2 - G : 110 Mohm V2 - G : 110 Mohm W2 - G : 110 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 110 Mohm U1 - W2 : 110 Mohm V1 - V2 : 0 Mohm V1 - U2 : 110 Mohm V1 - W2 : 110 Mohm W1 - W2 : 0 Mohm W1 - U2 : 110 Mohm W1 - V2 : 110 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 324 |
08 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Kondisi konekan dan dudukan motor pinlock PHC 01 sebelah laut korosi request service, ( note nilai tahanan Oke )
|
RELEASE
BY EXECUTOR
|
Medium 130000019182 |
Completed |
||
| 325 |
08 Oct 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Cleaning motor gantry PHC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 326 |
08 Oct 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Hasil Megger Motor gantry phc-02 No. 7 sebelah darat, Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 327 |
08 Oct 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor MV. Cable drum PHC-01 sebelah anyer , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 328 |
08 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor pinlock phc-01 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 329 |
08 Oct 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Hasil Megger Motor gantry phc-02 no 7 sebelah darat , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 330 |
08 Oct 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor MV. Cable drum phc-01 sebelah merak , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 331 |
08 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Hasil Megger Motor gantry phc-02 no 4 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 332 |
08 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Hasil Megger Motor gantry phc-02 no 1 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 333 |
08 Oct 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Hasil Megger Motor gantry phc-02 no 2 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 334 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Pengukuran suhu panel holding,slewing,closing,luffing DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 335 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang panel elektrik DLLC-04
Hasil pengukuran ruang panel elektrik DLLC-04 30.5 derajat celcius |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 336 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Pengukuran suhu ruang trafo DLLC-04
Suhu ruang trafo 44.0 derajat celcius. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 337 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Pengukuran panel LV DLLC-04 41.8 derajat celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 338 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Pengukuran suhu panel gantry DLLC-04.
Hasil pengukuran panel gantry DLLC-04 37.9 derajat celcius. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 339 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Pengencengan baud chamswitch holding yang kendor di DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 340 |
07 Oct 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Kondisi slipring DLLC-04 terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 341 |
07 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 342 |
07 Oct 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning panel gate hopper DLLC-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 343 |
06 Oct 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu panel P1B 27.3 derajat Celcius. Kondisi sedang running
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 344 |
06 Oct 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu trafo P1B 38.3 derajat Celcius.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 345 |
06 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu ruang panel P1C 28.5 derajat Celcius. Kondisi sedang running
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 346 |
06 Oct 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu motor drive A103
Motor 1 Drive 41 Fan 39 Bearing 38 Brake 41 Motor 2 Drive 41 Bearing 35 Fan 36 Brake 38 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 347 |
06 Oct 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Lubrikasi safety device area conveyor A103
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 348 |
05 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu motor main pump hidrolik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 349 |
05 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kiri
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 350 |
05 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kanan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 351 |
05 Oct 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor drive CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 352 |
05 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor feeding pump 58.2 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 353 |
05 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor emergency pump CSU 63.9 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 354 |
05 Oct 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor fan CSU 60.8 Derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 355 |
02 Oct 2026
Hasyim Alhabsyi
|
Tower 2
CIGADING 1
|
Pengukuran suhu panel TTN-1 Tower 2.
27,4 derajat celcius |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 356 |
02 Oct 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Pengukuran suhu panel TTN-1 tower 11. 33,6 derajat Celcius
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 357 |
01 Oct 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Lubrikasi safety device area conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 358 |
01 Oct 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Motor kanan Drive 38 Fan 39 Bearing 38 Motor kiri Drive 40 Bearing 39 Fan 39 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 359 |
01 Oct 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor single drive A102 :
Drive 40 Fan 38 Bearing 36 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 360 |
30 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 361 |
30 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor drive holding, closing dan trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 362 |
30 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Kontaktor brake trolley pong sebelah laut nomor 1 pcs, Rekues ganti GSU-04
|
LAIK PAKAI
REQUEST GANTI
|
Medium 130000019073 |
Completed |
||
| 363 |
30 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Kontaktor brake holding pong. Panel nomor 2 sebelah anyer
|
LAIK PAKAI
REQUEST GANTI
|
Medium 130000019070 |
Completed |
||
| 364 |
30 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Kontaktor brake holding pong 2 pcs dan ada indikasi terbakar. Panel sebelah anyer nomor 1
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 365 |
28 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning sensor sink in sink out HL SKT CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 366 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 8 sebelah darat , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 367 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 7 sebelah darat , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 368 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 6 sebelah darat , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 369 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 5 sebelah darat , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 370 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 4 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 371 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 3 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 372 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 2 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 373 |
26 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor gantry DLLC-03 no 01 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 374 |
24 Sep 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 375 |
24 Sep 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 376 |
24 Sep 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 377 |
24 Sep 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang Trafo P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 378 |
24 Sep 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang panel elektrik P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 379 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 380 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 381 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 34.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 382 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 42.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 383 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu ruang panel elektrik GSU-04 : 28.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 384 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Closing GSU-04 : 27.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 385 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding inverter GSU-04 : 32.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 386 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry GSU-04 : 29.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 387 |
23 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 41.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 388 |
23 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lidah kontaktor coil brake trolley pong 1pcs ( sebelah laut ) GSU 01, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000019069 |
Completed |
||
| 389 |
23 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lidah kontaktor coil brake closing pong 1pcs ( sebelah Anyer panel no 02 ) GSU 01, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000019066 |
Completed |
||
| 390 |
23 Sep 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Lidah kontaktor coil brake holding pong 1pcs ( sebelah anyer panel no. 01 ) GSU 01, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000019067 |
Completed |
||
| 391 |
23 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lidah kontaktor coil brake trolley pong 1pcs ( kontaktor sebelah laut ) GSU 04, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000019073 |
Completed |
||
| 392 |
23 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lidah kontaktor coil brake closing pong 1pcs ( sebelah merak panel no 01 ) GSU 04, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000019071 |
Completed |
||
| 393 |
23 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lidah kontaktor coil brake holding pong 2pcs ( panel sebelah anyer no. 01 dan no. 02 ) GSU 04, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000019070 |
Completed |
||
| 394 |
22 Sep 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 395 |
22 Sep 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 396 |
22 Sep 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Pengukuran suhu ruang panel GSU-05 : 34.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 397 |
22 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pipa kabel lampu handrail hopper GSU-05 patah dan posisi ngegantung ke bawah (langsung action, pipa kabel sudah pada posisi sebelumnya)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 398 |
22 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 399 |
21 Sep 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor Feeding Pump : 34.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 400 |
21 Sep 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Motor Main Pump : 39.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 401 |
21 Sep 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 2 CCSU : 27.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 402 |
21 Sep 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 1 CCSU : 23.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 403 |
21 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning ruang panel elektrik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 404 |
21 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU (before) dan ( after )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 405 |
21 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Trafo CSU kondisi kotor , request cleaning
|
RELEASE
REQUEST BERSIHKAN
|
Medium 130000019019 |
Completed |
||
| 406 |
21 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning slipring CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 407 |
21 Sep 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning paddleswitch CC3 CCSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 408 |
21 Sep 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning sink in sink out HL SKT CCSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 409 |
19 Sep 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01 :
HOLDING drive 43 Bearing 41 Fan 52 Brake 1 & 2 43 44 CLOSING Drive 47 Bearing 45 Fan 50 Brake 1 & 2 50 49 SLEWING 1 Drive 42 Bearing 40 Fan 45 Brake 48 SLEWING 2 Drive 45 Bearing 41 Fan 43 Brake 48 LUFFING Drive 38 Bearing 36 Fan 40 Brake 41 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 410 |
19 Sep 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Cleaning motor powerpack gate Hooper dan panel powerpack gate Hooper PHC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 411 |
17 Sep 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1A
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 412 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor gantry GSU 05 no 01 sebelah laut , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 413 |
17 Sep 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Hasil Megger Motor gantry GSU 06 no 14 sebelah darat, Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 414 |
17 Sep 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Hasil Megger Motor gantry GSU 06 no 16 sebelah darat , Oke
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 415 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 416 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Karet coupling motor kabel drum GSU 05 tipis , request ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000019005 |
Completed |
||
| 417 |
17 Sep 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 418 |
17 Sep 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch holding terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 419 |
17 Sep 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lampu LED 18W motor room GSU-06 mati 6pcs dan tidak terpasang 6pcs , req ganti
|
LAIK PAKAI
REQUEST GANTI
|
- 130000018995 |
In Process |
||
| 420 |
17 Sep 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 421 |
17 Sep 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU 05 luka/sobek , langsung action , sementara di rubber lalu di vinyl
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 422 |
16 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
gate hopper DLLC-03 sebelah darat limit switch request di setting ulang
|
LAIK PAKAI
REQUEST SERVICE
|
PANTAU | Ready to Use |
||
| 423 |
16 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Slipring DLLC 03 untuk saat ini masih terpantau amann ( ok )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 424 |
16 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 425 |
16 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning motor powerpack gate Hooper dan panel powerpack gate Hooper DLLC 03 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 426 |
15 Sep 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Proses lubrikasi safety device di sepanjang Conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 427 |
15 Sep 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Motor kanan Drive 37 Fan 38 Bearing 37 Motor kiri Drive 40 Bearing 36 Fan 39 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 428 |
15 Sep 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor single drive A102 :
Drive 40 Fan 36 Bearing 37 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 429 |
14 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
TL LED 8W untuk penerangan di Panel room DLLC-02 mati 2 Pcs.
|
RELEASE
REQUEST GANTI
|
Medium 130000019016 |
Completed |
||
| 430 |
14 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Preventive elektrik area slipring DLLC-02, terpantau masih OK.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 431 |
14 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning dan Inspeksi Preventive area panel trafo room DLLC-02. Kondisi sementara masih OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 432 |
14 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning dan lubrikasi motor truster brake DLLC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 433 |
14 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning dan preventive panel elektrik dan operator control di hopper DLLC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 434 |
14 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning dan Preventive motor Powerpack DLLC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 435 |
10 Sep 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Inspeksi dan Pengukuran suhu Trafo P1C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 436 |
10 Sep 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Posisi Underspeed conveyor A103 berada di bawah, sehingga sering terkena Grease dan percikan material, antisipasi terjadi Error/ salah pembacaan. Req. Pindahkan lokasi kebagian atas
|
LAIK PAKAI
REQUEST REPAIR
|
- | Outstanding |
||
| 437 |
10 Sep 2026
Hasyim Alhabsyi
|
TFH & Feeding
CIGADING 2
|
Lampu penerangan LED 19W di Conveyor TFH mati 3 titik.
Sisi darat : Tiang Nomor 1 dan 5 Sisi laut : Tiang Nomor 5 Request Ganti |
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 438 |
10 Sep 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Lampu penerangan bulb 19W di Conveyor A103 mati 3 titik.
Sisi Anyer : Tiang Nomor 3 Sisi Merak : Tiang Nomor 1 dan 5 (Posisi dihitung dari arah Laut ke Darat) Request Ganti |
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 439 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing PHC-01 : 42.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 440 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Slewing PHC-01 : 32.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 441 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Closing PHC-01 : 32.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 442 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Holding PHC-01 : 33.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 443 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Power Panel PHC-01 : 31.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 444 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel gantry PHC-02 : 38.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 445 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-02 : 41.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 446 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-01 : 43.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 447 |
09 Sep 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Supporting elektrik eksekutor// Pemasangan kabel baru Medium Volatge 6KV di PHC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 448 |
08 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor kabel drum sebelah merak PHC-02 noise bearing kasar , couple macet pada saat di putar ke arah merak , request service
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000018946 |
In Process |
||
| 449 |
08 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor kabel drum sebelah anyer PHC-02 noise bearing kasar, request service
|
RELEASE
REQUEST SERVICE
|
Medium 130000018947 |
Completed |
||
| 450 |
08 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor cabel drum medium voltage PHC 02 sebelah merak hasil nilai 18,20Mohm ( no oke / tahanan kecil ) , request service
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000018948 |
In Process |
||
| 451 |
08 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Motor cabel drum medium voltage PHC 02 sebelah Anyer hasil nilai 3,25Mohm - 10,39Mohm ( no oke / tahanan kecil ) , request service
|
RELEASE
REQUEST SERVICE
|
Medium 130000018949 |
Completed |
||
| 452 |
07 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motorpowerpack belt feeder, rekues add motorpowerpack belt feeder dikasih atap agar tidak tertumpuk material di GSU-01
|
RELEASE
PREVENTIVE MAINTENANCE
|
TIDAK | Completed |
||
| 453 |
07 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Lampu indikator running di panel gate powerpack GSU-04 tidak terpasang
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 454 |
07 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-04 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 455 |
07 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengecekkan lidah kontaktor holding closing trolley GSU-04 (kondisi kontaktor ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 456 |
07 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Cleaning dan lubrikasi zerospeed GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 457 |
07 Sep 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Cleaning motor gate power pack dan panel gate powerpack GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 458 |
07 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Penggantian filter motor fan holding, closing, dan trolley di area motor room GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 459 |
07 Sep 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Lubrikasi roll festune cabin operator GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 460 |
05 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi area ruang trafo, terdapat terdapat titik korosi dan terdapat beberapa baut yg kendor akibat vibrasi di pintu panel cubicle trafonya, Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 461 |
05 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu motor PHC-02 :
HOLDING drive 40 Bearing 40 Fan 51 Brake 1 & 2 39 40 CLOSING Drive 41 Bearing 40 Fan 57 Brake 1 & 2 46 44 SLEWING 1 Drive 44 Bearing 38 Fan 46 Brake 43 SLEWING 2 Drive 42 Bearing 40 Fan 40 Brake 45 LUFFING Drive 34 Bearing 33 Fan 38 Brake 36 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 462 |
05 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Inspeksi area slipring PHC-02 sudah mulai berdebu tebal. Req. service & cleaning
|
KOTOR
REQUEST SERVICE
|
Medium 130000018903 |
In Process |
||
| 463 |
05 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
suhu trafo PHC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 464 |
05 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
ruang trafo PHC-2 korosi bolong di bagian pojok laut dekat pintu
|
RELEASE
REQUEST REPAIR
|
Medium 130000018066 |
Completed |
||
| 465 |
05 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Inspeksi pada bagian Exhaust fan, terdapat noise kasar saat posisi running.
Req. Service |
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000018901 |
In Process |
||
| 466 |
05 Sep 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Inspeksi area top boom. Motor pin lock phc-02 tidak terpasang
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018902 |
In Process |
||
| 467 |
05 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01 :
HOLDING drive 44 Bearing 41 Fan 54 Brake 1 & 2 45 44 CLOSING Drive 47 Bearing 44 Fan 52 Brake 1 & 2 54 52 SLEWING 1 Drive 44 Bearing 38 Fan 46 Brake 55 SLEWING 2 Drive 50 Bearing 40 Fan 41 Brake 56 LUFFING Drive 38 Bearing 39 Fan 42 Brake 43 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 468 |
05 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Suhu trafo phc-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 469 |
05 Sep 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Lubrikasi motor creeper dan roll pendulum cable drum di PHC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 470 |
04 Sep 2026
Hasyim Alhabsyi
|
Conveyor BCNO
CIGADING 1
|
Bekas sayatan kabel penerangan BCNO, pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 471 |
04 Sep 2026
Anton Diki W
|
Conveyor C02
CIGADING 1
|
kabel C02 sebelah merak tiang no 4 dari laut
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 472 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 29.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 473 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 474 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 31.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 475 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 29.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 476 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 29.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 477 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 32.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 478 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 32.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 479 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 30.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 480 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 28.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 481 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-02 : 48.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 482 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-01 : 33.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 483 |
03 Sep 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-01 : 40.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 484 |
03 Sep 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Kondisi Slipring DLLC 01 untuk saat ini masih terpantau OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 485 |
03 Sep 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 486 |
02 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning ruang panel elektrik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 487 |
02 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning motor drive CC3 dan Motor fan CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 488 |
02 Sep 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Preventive elektrik program Cleaning slipring CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 489 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 490 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 32.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 491 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 31.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 492 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 30.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 493 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 31.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 494 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 30.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 495 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 496 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 31.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 497 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-04 : 36.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 498 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-03 : 41.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 499 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-04 : 42.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 500 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-03 : 47.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 501 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Kondisi slipring DLLC-04 saat ini masih terpantau OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 502 |
01 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Pengetesan gate Hooper open / close : OK DLLC 03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 503 |
01 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 504 |
01 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Kondisi Slipring DLLC 03 untuk saat ini masih terpantau OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 505 |
01 Sep 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning motor powerpack gate Hooper dan panel powerpack gate Hooper DLLC 03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 506 |
01 Sep 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi kondisi getaran di ruang trafo DLLC-04 saat running inspection, normal.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 507 |
31 Aug 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Inspeksi dan Pengukuran suhu Trafo P1C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 508 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 509 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 510 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 27.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 511 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 43.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 512 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu ruang panel elektrik GSU-04 : 30.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 513 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Closing GSU-04 : 28.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 514 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding inverter GSU-04 : 27.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 515 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry GSU-04 : 26.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 516 |
31 Aug 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 29.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 517 |
31 Aug 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Hasil Megger Motor drive A103 sebelah Merak
G - G : 0 Mohm U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 518 |
31 Aug 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Hasil Megger Motor drive A103 sebelah anyer
G - G : 0 Mohm U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 519 |
31 Aug 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu motor Gsu-04
Holding Drive 53 Bearing 41 Fan 44 Closing Drive 57 Bearing 42 Fan 46 Trolley Drive 49 Bearing 42 Fan 45 Suhu Motor belt feeder GSU 04 Motor 01 Drive 32 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 520 |
31 Aug 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Bearing roll festune lepas 4 pcs GSU-04, bagian anyer
rekues ganti |
RELEASE
REQUEST GANTI
|
Medium 130000018835 |
Completed |
||
| 521 |
31 Aug 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Sling safety komunikasi putus di GSU 04 sebelah darat, req ganti
Sementara di vynil dan ( sudah di infokan ke elektrik eksekutor ) |
RELEASE
REQUEST GANTI
|
Medium 130000018836 |
Completed |
||
| 522 |
28 Aug 2026
Anton Diki W
|
Conveyor C02
CIGADING 1
|
Pengecekan suhu motor C02 :
Motor 1 Drive 45 Bearing 44 Brake 47 Motor 2 Drive 48 Bearing 41 Brake 48 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 523 |
28 Aug 2026
Anton Diki W
|
Conveyor BCNO
CIGADING 1
|
Pengecekan suhu motor BCNO :
Motor 1 Drive 39 Bearing 44 Brake 48 Motor 2 Drive 46 Bearing 40 Brake 49 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 524 |
28 Aug 2026
Anton Diki W
|
Conveyor C02
CIGADING 1
|
Pengukuran suhu panel variabel speed drive (VSD) C02 motor B terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 525 |
27 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 526 |
27 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 527 |
27 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 528 |
27 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang Trafo P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 529 |
27 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang panel elektrik P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 530 |
27 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi lampu penerangan di area Conveyor A102, masih terdapat banyak lampu yang mati.
Sisi Merak : 14 titik Sisi Anyer : 36 titik |
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 531 |
27 Aug 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Motor kanan Drive 39 Fan 38 Bearing 36 Motor kiri Drive 40 Bearing 38 Fan 41 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 532 |
27 Aug 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor single drive A102 :
Drive 40 Fan 37 Bearing 36 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 533 |
26 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Kondisi slipring CSU saat ini terpantau bersih dan ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 534 |
26 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU (before) dan ( after )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 535 |
25 Aug 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor gantry no 1 sebelah darat DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 536 |
25 Aug 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor gantry no 03 sebelah darat DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 537 |
25 Aug 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor kabel drum medium voltage DLLC-02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 538 |
25 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Hasil Megger Motor kabel drum medium voltage CSU
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 539 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing PHC-01 : 36.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 540 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Slewing PHC-01 : 38.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 541 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Closing PHC-01 : 35.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 542 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Holding PHC-01 : 29.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 543 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Power Panel PHC-01 : 28.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 544 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel gantry PHC-02 : 47.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 545 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-02: 44.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 546 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-01 : 42.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 547 |
24 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
emergency di power panel elektrik tidak terpasang PHC 01
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
- | Outstanding |
||
| 548 |
24 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Kondisi slipring PHC-01 saat ini terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 549 |
24 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01 :
HOLDING drive 42 Bearing 40 Fan 51 Brake 1 & 2 41 40 CLOSING Drive 44 Bearing 41 Fan 49 Brake 1 & 2 49 48 SLEWING 1 Drive 42 Bearing 36 Fan 39 Brake 45 SLEWING 2 Drive 40 Bearing 36 Fan 41 Brake 49 LUFFING Drive 37 Bearing 36 Fan 41 Brake 38 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 550 |
24 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Ruang trafo phc-01 dinding arah laut ada yang bolong 2 titik. Ditakutkan masuk air, rekues repair/foam
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 551 |
24 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Cleaning motor dan panel motor powerpack gate Hooper PHC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 552 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi pengukuran vibrasi bearing slewing 2 dekat pintu PHC-02, overall good condition
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 553 |
24 Aug 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Kondisi slipring PHC-02 terpantau aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 554 |
22 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Dudukan konekan PHC-01 korosi, hasil megger ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 555 |
22 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 4 sisi laut sebelah Anyer
U1 - G : 20 Mohm V1 - G : 12 Mohm W1 - G : 20 Mohm U2 - G : 17 Mohm V2 - G : 2 Mohm W2 - G : 20 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 20 Mohm U1 - W2 : 20 Mohm V1 - V2 : 0 Mohm V1 - U2 : 20 Mohm V1 - W2 : 20 Mohm W1 - W2 : 0 Mohm W1 - U2 : 20 Mohm W1 - V2 : 20 Mohm |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
Medium 130000018796 |
In Process |
||
| 556 |
22 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 6 sisi darat sebelah merak
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 557 |
22 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 8 sisi darat sebelah merak
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 558 |
22 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 7 sebelah darat
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 559 |
22 Aug 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 5 sisi darat sebelah merak
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 560 |
22 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 3 sisi laut sebelah Anyer
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 561 |
22 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 2 sisi laut sebelah merak
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 562 |
22 Aug 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor gantry PHC-01 no 1 sisi laut sebelah merak
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 563 |
21 Aug 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 564 |
21 Aug 2026
Hasyim Alhabsyi
|
Feeding SGT
CIGADING 1
|
Cleaning safety device area bucket elevator SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 565 |
20 Aug 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 566 |
20 Aug 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 567 |
19 Aug 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-04 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 568 |
19 Aug 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Kondisi Slipring DLLC 04 untuk saat ini masih terpantau OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 569 |
19 Aug 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Cleaning dan lubrikasi motor gantry dan creeper gantry DLLC 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 570 |
19 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Joystick operator sebelah kiri robek, rekues ganti di DLLC-03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 571 |
19 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Panel cabin desk operator banyak abu roko, sudah langsung di action(cleaning) di DLLC-03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 572 |
18 Aug 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor Fan CCSU : 36.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 573 |
18 Aug 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Motor Main Pump : 43.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 574 |
18 Aug 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 2 CCSU : 27.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 575 |
18 Aug 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 1 CCSU : 26.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 576 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kanan , Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 577 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kiri , Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 578 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor drive CC3 , Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 579 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor emergency pump CSU , OKE
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 580 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor feeding pump CSU , OKE
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 581 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor fan CSU , OKE : 50.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 582 |
18 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu motor main pump hidrolik CSU ,OKE
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 583 |
14 Aug 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Tray kabel di area conveyor PBCN Tertimpa matrial, request cleaning
|
RELEASE
REQUEST BERSIHKAN
|
Medium | Completed |
||
| 584 |
14 Aug 2026
Anton Diki W
|
Conveyor PBCN 2
CIGADING 1
|
Belt rip PBCN-02 perlu identifikasi lanjutan pengecekan jalur kabel/inputan dari relay ke PLC di panel tower 11.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 585 |
14 Aug 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Sensor proximity conveyor PBCN 01 dan PBCN 02 Kondisi Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 586 |
14 Aug 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Pull cord no tiang 80 putus di conveyor PBCN 01 , request repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 587 |
14 Aug 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Lubrikasi zerospeed PBCN 01 dan PBCN 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 588 |
14 Aug 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Pengecekan dan cleaning zerospeed PBCN 01 dan PBCN 02 Kondisi Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 589 |
14 Aug 2026
Hasyim Alhabsyi
|
Conveyor PBCN 2
CIGADING 1
|
Zerospeed GSU-01 kemasukan semut, langsung di cleaning
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 590 |
13 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Dudukan sling pullcord sebelah anyer A102 patah di tiang nomor 692, rekues repair
|
RELEASE
BY EXECUTOR
|
Medium 130000018728 |
Completed |
||
| 591 |
13 Aug 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Dudukan sling pullcord sebelah anyer A102 patah di tiang nomor 697, rekues repair
|
RELEASE
BY EXECUTOR
|
Medium 130000018728 |
Completed |
||
| 592 |
11 Aug 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1A
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 593 |
11 Aug 2026
Anton Diki W
|
Dermaga 5
CIGADING 2
|
Lampu penerangan dermaga 05 mati 1pcs , request ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000016165 |
Completed |
||
| 594 |
10 Aug 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning area Slipring, kondisi saat ini terpantau bersih.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 595 |
10 Aug 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning paddleswitch CC3 CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 596 |
10 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning ruang panel elektrik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 597 |
10 Aug 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU (before) , proses dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 598 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 27.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 599 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 32.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 600 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 33.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 601 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 29.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 602 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 34.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 603 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 29.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 604 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 605 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 34.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 606 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 28.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 607 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-02 : 40.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 608 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-01 : 29.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 609 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-01 : 48.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 610 |
08 Aug 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Konekan di medium voltage ada indikasi korosi, rekues servis
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000018682 |
In Process |
||
| 611 |
08 Aug 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Hasil Megger Motor gantry DLLC 01 no 04 sebelah darat
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 612 |
08 Aug 2026
Anton Diki W
|
DLLC - 01
CIGADING 1
|
Hasil Megger Motor gantry DLLC 01 no 03 sebelah laut
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 613 |
08 Aug 2026
Anton Diki W
|
DLLC - 01
CIGADING 1
|
Hasil Megger Motor gantry DLLC 01 no 01 sebelah darat
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 614 |
08 Aug 2026
Anton Diki W
|
DLLC - 01
CIGADING 1
|
Hasil Megger Motor gantry DLLC 01 no 02 sebelah darat
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 615 |
06 Aug 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Hasil Megger Motor gantry GSU 06 no 2 sebelah laut
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 616 |
06 Aug 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Hasil Megger Motor gantry GSU 06 no 01 sebelah laut
U1 - G : 265 Mohm V1 - G : 273 Mohm W1 - G : 155 Mohm U2 - G : 343 Mohm V2 - G : 285 Mohm W2 - G : 330 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 617 |
05 Aug 2026
Hasyim Alhabsyi
|
TFH & Feeding
CIGADING 2
|
Hasil Megger Motor Drive TFH :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 618 |
04 Aug 2026
Anton Diki W
|
TFH & Feeding
CIGADING 2
|
Cleaning motor powerpack TFH before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 619 |
04 Aug 2026
Anton Diki W
|
TFH & Feeding
CIGADING 2
|
Cleaning motor drive TFH before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 620 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 32.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 621 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 31.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 622 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 31.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 623 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 36.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 624 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 28.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 625 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 33.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 626 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 34.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 627 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 628 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-04 : 40.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 629 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-03 : 31.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 630 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-04 : 40.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 631 |
03 Aug 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-03 : 49.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 632 |
03 Aug 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Motor vibro Hopper DLLC 03 kondisi saat ini terpantau Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 633 |
03 Aug 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning motor powerpack gate Hooper DLLC 03 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 634 |
01 Aug 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Program megger motor drive BOOM GSU-04 :
GROUND-GROUND pengukuran 0 Mohm, GROUND-POSITIF, GROUND-NEGATIF hasil pengukuran 550Mohm POSITIF - NEGATIF hasil pengukuran 0 Mohm Exsitasi Ground F1 Ground F2 Hasil pengukuran 550Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 635 |
01 Aug 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Hasil Megger Motor cabel reel medium voltage GSU 04 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 636 |
01 Aug 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-04 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 637 |
30 Jul 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Panel lampu penerangan dermaga 06 no13 engsel rusak / patah request repair , sementara di tirap
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 638 |
30 Jul 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
MCB 6 ampere lampu penerangan dermaga 06 panel no15 short, request ganti MCB
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 639 |
30 Jul 2026
Hasyim Alhabsyi
|
Dermaga 6
CIGADING 2
|
Lampu penerangan 120W di tiang No.10, mati. Request Ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000018596 |
Completed |
||
| 640 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 641 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 31.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 642 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 34.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 643 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 34.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 644 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 28.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 645 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 28.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 646 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 647 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 30.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 648 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 31.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 649 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-02 : 46.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 650 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-01 : 30.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 651 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-01 : 45.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 652 |
29 Jul 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Kondisi Slipring DLLC 01 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 653 |
29 Jul 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning motor powerpack gate Hooper DLLC 01 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 654 |
29 Jul 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Cleaning cabin desk operator DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 655 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 656 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 657 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Cleaning dan lubrikasi underspeed GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 658 |
28 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning underspeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 659 |
28 Jul 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 660 |
28 Jul 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 661 |
28 Jul 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 662 |
28 Jul 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 663 |
28 Jul 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch holding terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 664 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU 05 luka/sobek , langsung action , sementara di rubber lalu di vinyl
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 665 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Pengencangan baud panel LSA CPA Gantry GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 666 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 667 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 668 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 669 |
28 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 670 |
27 Jul 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01 :
HOLDING drive 40 Bearing 36 Fan 52 Brake 1 & 2 41 41 CLOSING Drive 44 Bearing 38 Fan 48 Brake 1 & 2 47 45 SLEWING 1 Drive 40 Bearing 35 Fan 38 Brake 45 SLEWING 2 Drive 38 Bearing 33 Fan 40 Brake 42 LUFFING Drive 38 Bearing 35 Fan 40 Brake 36 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 671 |
27 Jul 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Karet couple holding di PHC 01 tidak terpasang , request repair dan pasang karet couple
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 672 |
27 Jul 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Slipring PHC 01 kotor request cleaning
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 673 |
27 Jul 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Ruang trafo PHC-01 kotor, rekues cleaning
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 674 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 675 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 676 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 30.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 677 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 42.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 678 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu ruang panel elektrik GSU-04 : 32.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 679 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Closing GSU-04 : 28.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 680 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding inverter GSU-04 : 30.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 681 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry GSU-04 : 26.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 682 |
25 Jul 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 34.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 683 |
25 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil magger motor latch boom GSU 01 hasil nilai 2,29Mohm ( no oke ) , request service
|
RELEASE
REQUEST SERVICE
|
Medium 130000018602 |
Completed |
||
| 684 |
25 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-01 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 685 |
24 Jul 2026
Hasyim Alhabsyi
|
Feeding SGT
CIGADING 1
|
Cleaning fan blower dan Inspeksi panel elektrik di Feeding SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 686 |
24 Jul 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 687 |
23 Jul 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1A
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 688 |
23 Jul 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Kondisi panel vsd kotor rekues cleaning, di P1A
|
KOTOR
REQUEST BERSIHKAN
|
Medium 130000018603 |
In Process |
||
| 689 |
23 Jul 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu motor drive A101 :
Drive 41 Bearing 47 Fan 36 Brake 41 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 690 |
23 Jul 2026
Hasyim Alhabsyi
|
Dermaga 6
CIGADING 2
|
Lampu penerangan 120W di tiang No.10 (dihitung dari arah Anyer), nyala sebagian (rusak). Request Ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000018596 |
Completed |
||
| 691 |
22 Jul 2026
Hasyim Alhabsyi
|
Conveyor BCNO
CIGADING 1
|
Cleaning motor drive, motor brake, motor fan dan cleaning panel di conveyor BCNO
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 692 |
22 Jul 2026
Hasyim Alhabsyi
|
Conveyor C02
CIGADING 1
|
Cleaning motor drive, motor brake, motor fan dan cleaning panel di conveyor C02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 693 |
20 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor Fan CCSU : 33.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 694 |
20 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor Feeding Pump : 35.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 695 |
20 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Motor Main Pump : 52.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 696 |
20 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 2 CCSU : 27.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 697 |
20 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 1 CCSU : 28.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 698 |
20 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning area Slipring CCSU, kondisi OK.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 699 |
20 Jul 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning ruang panel elektrik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 700 |
20 Jul 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU (before) dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 701 |
18 Jul 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor drive holding DLLC 03 hasil oke.
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 702 |
18 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor brake slewing sisi laut
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 703 |
18 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Hasil Megger Motor closing :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 704 |
17 Jul 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Pengukuran suhu motor :
PBCN-01 : Drive 50 Bearing 43 Brake 48 PBCN-02 : Drive 47 Bearing 51 Brake 53 Fan 43 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 705 |
17 Jul 2026
Anton Diki W
|
Conveyor PBCN 1
CIGADING 1
|
Pullcord sling safety conveyor PBCN 01 putus di tiang nomor 80 , request repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000018569 |
Completed |
||
| 706 |
17 Jul 2026
Hasyim Alhabsyi
|
Conveyor PBCN 2
CIGADING 1
|
Cleaning motor drive PBCN-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 707 |
17 Jul 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Cleaning motor drive PBCN01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 708 |
16 Jul 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 709 |
16 Jul 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 710 |
16 Jul 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 711 |
16 Jul 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang Trafo P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 712 |
16 Jul 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang panel elektrik P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 713 |
16 Jul 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Lampu led ruang panel P1B lepas dari dudukan lampu "request perbaikan"
|
LAIK PAKAI
REQUEST REPAIR
|
- | Outstanding |
||
| 714 |
16 Jul 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Kondisi trafo P1B terlihat kotor, rekues cleaning
|
LAIK PAKAI
REQUEST BERSIHKAN
|
- | Outstanding |
||
| 715 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Cleaning motor brake luffing DLLC 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 716 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor fan luffing DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 717 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor luffing DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 718 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor brake holding sebelah anyer DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 719 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor brake holding sebelah merak DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 720 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor brake closing sebelah anyer DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 721 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor brake closing sebelah merak DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 722 |
15 Jul 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor holding DLLC 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 723 |
15 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor closing DLLC-02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 724 |
15 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Hasil Megger Motor slewing DLLC sebelah darat
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 725 |
15 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Hasil Megger motor slewing DLLC-02 Csebelah laut
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 726 |
15 Jul 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Grounding di dekat pintu motor room sebelah laut putus. Rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 727 |
13 Jul 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning sensor shink in/out HLSKT CCSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 728 |
13 Jul 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Hasil Megger Motor gantry CSU no 24 sebelah laut
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 729 |
13 Jul 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Hasil Megger Motor gantry CSU no 21 sebelah laut U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 730 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing PHC-01 : 41.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 731 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Slewing PHC-01 : 32.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 732 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Closing PHC-01 : 32.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 733 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Holding PHC-01 : 32.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 734 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Power Panel PHC-01 : 29.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 735 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel gantry PHC-02 : 37.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 736 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-02 : 42.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 737 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-01 : 43.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 738 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Hasil Megger Motor Slewing 01 Sebelah Darat di PHC 02 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 739 |
11 Jul 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Hasil Megger Motor Holding PHC 02 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 740 |
11 Jul 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Hasil Megger Motor slewing 02 sebelah laut PHC 02 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 741 |
11 Jul 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Hasil Megger Motor closing PHC 02 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 742 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.08:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 743 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.07:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 744 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.06:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 745 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.05:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 746 |
09 Jul 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
kabel RST motor vibrating GSU-06 sebelah anyer sisi laut tidak ada skun nya, rekues pasang skun
|
RELEASE
BY EXECUTOR
|
Medium 130000018503 |
Completed |
||
| 747 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.04:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 748 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.03:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 749 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.02:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 750 |
09 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Hasil Megger Motor gantry GSU 01 sebelah darat no.01:
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 751 |
09 Jul 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Hasil Megger Motor Vibro arah laut GSU 06 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 752 |
09 Jul 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Hasil Megger Motor vibrating GSU 06 sebelah Anyer :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 753 |
09 Jul 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Hasil Megger Motor vibro sebelah merak GSU 06 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 754 |
08 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Lubrikasi roll festun cabin operator GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 755 |
08 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Cleaning motor power pack
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 756 |
08 Jul 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Motor trastle brake tidak terpasang 2 pcs di sisi merak darat dan merak laut. Req. Pasangkan
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017501 |
In Process |
||
| 757 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengecekkan lidah kontaktor holding closing trolley GSU-01 (kondisi kontaktor ok)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 758 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor drive holding closing dan trolley GSU 01
Note: filter GSU 01 terpantau masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 759 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Cleaning motor gate power pack GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 760 |
08 Jul 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
motor eldro brake gantry GSU 01 tidak terpasang 3pcs , sebelah laut Anyer 1pcs dan 2pcs sebelah daratt , request pasang
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 761 |
07 Jul 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Inspeksi dan Pengukuran suhu Trafo P1C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 762 |
07 Jul 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Kondisi Ruang trafo P1C kotor banyak sawangnya. Rekues cleaning
|
RELEASE
BY EXECUTOR
|
Medium 130000018486 |
Completed |
||
| 763 |
07 Jul 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu motor drive A103
Motor 1 Drive 42 Fan 38 Bearing 38 Brake 40 Motor 2 Drive 40 Bearing 37 Fan 36 Brake 38 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 764 |
07 Jul 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Filter vsd ruang panel P1C kondisi kotor, rekues ganti
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 765 |
07 Jul 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Filter vsd ruang panel P1B kondisi OKE.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 766 |
02 Jul 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Hasil Megger Motor Trolley GSU 05 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 767 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Motor vibrating sebelah Anyer GSU 05 , tidak ada skun nyaa , request penambahan skun
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000018502 |
In Process |
||
| 768 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor closing GSU 05 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 769 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor holding GSU 05 :
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 770 |
02 Jul 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Hasil Megger Motor Boom GSU 05 :
U1 - G : 180 Mohm V1 - G : 174 Mohm W1 - G : 140 Mohm U2 - G : 150 Mohm V2 - G : 160 Mohm W2 - G : 170 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 242 Mohm U1 - W2 : 240 Mohm V1 - V2 : 0 Mohm V1 - U2 : 230 Mohm V1 - W2 : 244 Mohm W1 - W2 : 0 Mohm W1 - U2 : 236 Mohm W1 - V2 : 245 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 771 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 31.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 772 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 31.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 773 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 35.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 774 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 29.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 775 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 28.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 776 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 34.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 777 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 778 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 30.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 779 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-04 : 42.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 780 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-03 : 30.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 781 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-04 : 44.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 782 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-03 : 38.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 783 |
01 Jul 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Baut chamswitch holding DLLC 03 terpantau lengkap
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 784 |
01 Jul 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning dan lubrikasi motor creeper gantry DLLC 03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 785 |
01 Jul 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning panel gate Hooper DLLC 03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 786 |
01 Jul 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning motor powerpack gate Hooper DLLC 03 , before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 787 |
01 Jul 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Motor vibro gate hooper sisi Laut di DLLC-04 mengalami kerusakan (suara kasar). Indikasi dari kerusakan bearing.
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 788 |
30 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 789 |
30 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 790 |
30 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 791 |
30 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang Trafo P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 792 |
30 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang panel elektrik P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 793 |
30 Jun 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Cleaning dan lubrikasi safety device area conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 794 |
29 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cleaning panel desk control operator kiri dan kanan di PHC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 795 |
29 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Grouding area gantry tidak terpasang 2 pcs PHC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 796 |
29 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Kondisi slipring PHC-01 terpantau ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 797 |
29 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cleaning motor pack gate hopper PHC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 798 |
27 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Motor Gantry Nomor 2 (Sisi Laut arah Anyer)
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm Hasil Megger motor dinyatakan bagus (OK) |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 799 |
27 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Motor Gantry Nomor 4 (Sisi Laut arah Merak)
U1 - G : 0,11 Mohm V1 - G : 0,22 Mohm W1 - G : 0,11 Mohm U2 - G : 0,22 Mohm V2 - G : 0,18 Mohm W2 - G : 0,11 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 0,09 Mohm U1 - W2 : 0,07 Mohm V1 - V2 : 0 Mohm V1 - U2 : 0,16 Mohm V1 - W2 : 0,17 Mohm W1 - W2 : 0 Mohm W1 - U2 : 0,17 Mohm W1 - V2 : 0,16 Mohm Hasil Megger motor rendah dan terdapat genangan air dalam covernya |
RELEASE
REQUEST SERVICE
|
Medium 130000018389 |
Completed |
||
| 800 |
27 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Motor Gantry Nomor 3 (Sisi Laut arah Merak)
U1 - G : 280 Mohm V1 - G : 311 Mohm W1 - G : 320 Mohm U2 - G : 119 Mohm V2 - G : 116 Mohm W2 - G : 114 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 0,14 Mohm U1 - W2 : 0,16 Mohm V1 - V2 : 0 Mohm V1 - U2 : 0,14 Mohm V1 - W2 : 0,16 Mohm W1 - W2 : 0 Mohm W1 - U2 : 0,14 Mohm W1 - V2 : 0,16 Mohm Hasil Megger motor rendah dan terdapat genangan air dalam covernya |
RELEASE
REQUEST SERVICE
|
Medium 130000018388 |
Completed |
||
| 801 |
27 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Pengecekan & Cleaning seluruh Motor Gantry sisi darat di GSU-01 (Hasil Megger OK = 550 MOhm)
Untuk motor gantry sebelah darat yang mengalami korosi sudah di bersihkan dan di amplas. |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 802 |
26 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Magnetic contactor K11 indikasi terdapat percikan api Saat motor bucket elevator SGT di running , posisi ada di panel SGT , request service
|
RELEASE
REQUEST SERVICE
|
Medium 130000018387 |
Completed |
||
| 803 |
26 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Tes running bucket elevator SGT after magger
Note : horn bucket elevator SGT tidak terpasang |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 804 |
26 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Motor bucket elevator SGT hasil megger ok 550 Mohm. Ground-ground, Ground-phase, Phase-phase
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 805 |
26 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Kondisi sebelum dan sesudah di magger motor bucket elevator SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 806 |
26 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 807 |
25 Jun 2026
Hasyim Alhabsyi
|
Dermaga 5
CIGADING 2
|
Lampu dermaga 5 mati 1 pcs di tiang nomor 3 & 4
|
RELEASE
BY EXECUTOR
|
Medium 130000016165 |
Completed |
||
| 808 |
24 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Kondisi slipring saat ini cukup bersih dan ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 809 |
24 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Jalur kabel sudah di tutup foam sealant oleh elektrik, kondisi jalur saat ini sudah ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 810 |
23 Jun 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1A
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 811 |
23 Jun 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Hasil Megger Motor Trolley
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 812 |
23 Jun 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Hasil Megger Motor Boom
U1 - G : 109 Mohm V1 - G : 107 Mohm W1 - G : 106 Mohm U2 - G : 108 Mohm V2 - G : 112 Mohm W2 - G : 110 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 114 Mohm U1 - W2 : 125 Mohm V1 - V2 : 0 Mohm V1 - U2 : 125 Mohm V1 - W2 : 112 Mohm W1 - W2 : 0 Mohm W1 - U2 : 112 Mohm W1 - V2 : 114 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 813 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 28.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 814 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 29.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 815 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 30.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 816 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 33.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 817 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 28.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 818 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 33.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 819 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 820 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 31.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 821 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 38.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 822 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-02 : 43.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 823 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-01 : 29.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 824 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-01 : 49.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 825 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
kondisi slipring kabel drum 6kV untuk saat ini masih terpantau amann DLLC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 826 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Kondisi Slipring DLLC 01 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 827 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning Motor kabel drum medium voltage DLLC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 828 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Kontak NC PB stop rusak ( panel motor powerpack gate Hopper ) DLLC 01, request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018346 |
Completed |
||
| 829 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Motor vibro Hopper DLLC 01 sebelah laut terdapat kelainan bunyi , indikasi untuk saat ini darii bearing , request service
|
RELEASE
REQUEST SERVICE
|
Medium 130000018345 |
Completed |
||
| 830 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Motor vibro Hopper DLLC 01 sebelah merakk bagian daratt terdapat kelainan bunyi , indikasi untuk saat ini darii bearing , request service
|
RELEASE
REQUEST SERVICE
|
Medium 130000018373 |
Completed |
||
| 831 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning motor creeper gantry DLLC 01 , before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 832 |
22 Jun 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning motor powerpack gate Hooper DLLC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 833 |
22 Jun 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Cleaning motorpack gate hopper DLLC-02
|
LAIK PAKAI
REQUEST REPAIR
|
TIDAK | Ready to Use |
||
| 834 |
20 Jun 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Hasil Megger Motor Closing
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 835 |
20 Jun 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Hasil Megger Motor Holding
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 836 |
19 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning dan lubrikasi safety device area bucket elevator SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 837 |
19 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Tes running bucket elevator SGT, kondisi ok
Note : horn bucket elevator SGT tidak terpasang |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 838 |
19 Jun 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 839 |
18 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil magger brake Slewing 02 tahanan isolasi 550 Mohm, Ground-ground. Ground-phase. Phase-phase
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 840 |
18 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Hasil Megger Motor Slewing 02
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 841 |
18 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil magger brake Slewing 01 tahanan isolasi 550 Mohm, Ground-ground. Ground-phase. Phase-phase
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 842 |
18 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Hasil Megger Motor Slewing 01
U1 - G : 550 Mohm V1 - G : 550 Mohm W1 - G : 550 Mohm U2 - G : 550 Mohm V2 - G : 550 Mohm W2 - G : 550 Mohm Antar Phase U1 - U2 : 0 Mohm U1 - V2 : 550 Mohm U1 - W2 : 550 Mohm V1 - V2 : 0 Mohm V1 - U2 : 550 Mohm V1 - W2 : 550 Mohm W1 - W2 : 0 Mohm W1 - U2 : 550 Mohm W1 - V2 : 550 Mohm |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 843 |
17 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Motor fan holding hasil megger ok 550 Mohm, Ground-ground. Ground-phase. Phase-phase ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 844 |
17 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Motor fan luffing hasil megger ok 550 Mohm, Ground-ground. Ground-phase. Phase-phase ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 845 |
17 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Motor brake luffing hasil megger ok 550 Mohm, Ground-ground. Ground-phase. Phase-phase ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 846 |
17 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Motor drive luffing hasil megger ok 550 Mohm, Ground-ground. Ground-phase. Phase-phase ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 847 |
17 Jun 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Motor drive closing hasil megger ok 550 Mohm, Ground-ground. Ground-phase. Phase-phase ok
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 848 |
17 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Program megger motor drive TROLLEY GSU-04 :
Antar Phase GROUND - GROUND = 0 MOhm, GROUND - POSITIF = 550 MOhm GROUND - NEGATIF = 550 MOhm POSITIF - NEGATIF = 0 MOhm Exsitasi Ground - F1 : 550 MOhm Ground - F2 : 550 MOhm Kode Motor : M6 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 849 |
15 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengencangan baut di ruang panel room CCSU, dan cleaning ruang trafo.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 850 |
15 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU. dokumentasi before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 851 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 852 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 853 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 34.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 854 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 36.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 855 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu ruang panel elektrik GSU-04 : 27.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 856 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Closing GSU-04 : 38.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 857 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding inverter GSU-04 : 31.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 858 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry GSU-04 : 26.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 859 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 30.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 860 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Pengecekan lidah kontaktor motor brake di GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 861 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-01 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 862 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Cleaning dan Penggantian filter motor fan holding closing trolley GSU-04 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 863 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Program megger motor drive HOLDING GSU-04 :
Antar Phase GROUND - GROUND = 0 MOhm, GROUND - POSITIF = 46 MOhm GROUND - NEGATIF = 47 MOhm POSITIF - NEGATIF = 0 MOhm Exsitasi Ground - F1 : 550 MOhm Ground - F2 : 550 MOhm Pantau berkala Kode Motor : M4 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 864 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Program megger motor drive CLOSING GSU-04 :
Antar Phase GROUND - GROUND = 0 MOhm, GROUND - POSITIF = 24 MOhm GROUND - NEGATIF = 24 Mohm POSITIF - NEGATIF = 0 MOhm Exsitasi Ground - F1 : 550 MOhm Ground - F2 : 550 MOhm Request Service Kode Motor : M5 |
RELEASE
REQUEST SERVICE
|
Medium 130000018329 |
Completed |
||
| 865 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor powerpack belt feeder GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 866 |
13 Jun 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor drive & fan holding, closing, dan trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 867 |
12 Jun 2026
Anton Diki W
|
Tower 2
CIGADING 1
|
Cleaning motor drive BCNO 01 dan BCNO 02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 868 |
11 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor Fan CCSU : 33.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 869 |
11 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengukuran suhu motor Feeding Pump : 34.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 870 |
11 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Motor Main Pump : 52.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 871 |
11 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 2 CCSU : 26.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 872 |
11 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 1 CCSU : 26.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 873 |
11 Jun 2026
Anton Diki W
|
CCSU
CIGADING 1
|
test running setelah di magger CSU , ready for use
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 874 |
11 Jun 2026
Anton Diki W
|
CCSU
CIGADING 1
|
After magger cleaning motor fan , motor feeding pump , emergency pump
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 875 |
11 Jun 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Hasil megger motor fan 550 Mohm. Ground-ground, ground-phase, phase-phase
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 876 |
11 Jun 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Hasil megger motor emergency pump 550 Mohm. Ground-ground, ground-phase, phase-phase
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 877 |
11 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Kabel ground putus di area CC2 CSU
|
RELEASE
REQUEST REPAIR
|
Medium 130000016631 |
Completed |
||
| 878 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing PHC-01 : 40.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 879 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Slewing PHC-01 : 35.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 880 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Closing PHC-01 : 33.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 881 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Holding PHC-01 : 33.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 882 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Power Panel PHC-01 : 32.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 883 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel gantry PHC-02 : 38.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 884 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-02 : 41.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 885 |
10 Jun 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-01 : 41.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 886 |
10 Jun 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Preventive elektrik program Megger / Pengujian tahanan (resistansi) isolasi di DLLC-01 :
1. Megger insulation tes motor drive Holding. Ground-ground, ground-phase, phase-phase hasil 550Mohm 2. Megger insulation tes motor drive Closing. Ground-ground, ground-phase, phase-phase hasil 550Mohm 3. Megger insulation tes motor drive slewing 1. Ground-ground, ground-phase, phase-phase hasil 550Mohm 4. Megger insulation tes motor drive slewing 2. Ground-ground, ground-phase, phase-phase hasil 550Mohm 5. Megger insulation tes motor brake holding. Ground-ground, ground-phase, phase-phase hasil 550Mohm 6. Megger insulation tes motor brake closing. Ground-ground, ground-phase, phase-phase hasil 550Mohm 7. Megger insulation tes motor brake slewing 1&2 Ground-ground, ground-phase, phase-phase hasil 550Mohm 8. Megger insulation tes motor drive luffing. Ground-ground, ground-phase, phase-phase hasil 550Mohm 9. Megger insulation tes motor fan holding, closing. Ground-ground, ground-phase, phase-phase hasil 550Mohm 10. Megger insulation tes motor fan luffing. Ground-ground, ground-phase, phase-phase hasil 550Mohm 11. Cleaning semua motor yang di Megger |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 887 |
09 Jun 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Inspeksi dan Pengukuran suhu Trafo P1C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 888 |
09 Jun 2026
Anton Diki W
|
TFH & Feeding
CIGADING 2
|
Dudukan Motor drive TFH korosi request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018325 |
In Process |
||
| 889 |
09 Jun 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu motor drive A103
Motor 1 Drive 39 Fan 40 Bearing 37 Brake 38 Motor 2 Drive 37 Bearing 36 Fan 38 Brake 37 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 890 |
09 Jun 2026
Anton Diki W
|
TFH & Feeding
CIGADING 2
|
Pengukuran suhu motor drive TFH :
Drive 48 Fan 48 Bearing 38 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 891 |
08 Jun 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
AC ruang ruang trafo mengeluarkan angin panas DLLC-02, Sudah di eksekusi oleh tim Tampomas.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 892 |
08 Jun 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Pengukuran suhu motor DLLC-02:
HOLDING Fan 46 Drive 43 Bearing 42 Brake 1 & 2 46 & 48 CLOSING Fan 45 Drive 44 Bearing 39 Brake 1 & 2 47 & 50 SLEWING 1 Fan 46 Drive 38 Bearing 37 Brake 1 41 SLEWING 2 Fan 45 Drive 38 Bearing 36 Brake 1 40 LUFFING Fan 40 Drive 38 Bearing 36 Brake 1 42 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 893 |
06 Jun 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Preventive elektrik program magger A101 :
1. motor fan A101 hasil magger 550 Mohm, ground-ground, ground-phase, phase-phase ok 2. cleaning motor drive |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 894 |
06 Jun 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Preventive elektrik program magger A101 :
1. Motor drive A101 hasil magger 550 Mohm, ground-ground, ground-phase, phase-phase ok 2. cleaning motor drive |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 895 |
05 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Hasil magger Motor gantry CSU hasill Oke ( sample Motor no 1 , 10 , 11 , 12 sudah di lakukan )
Catatan : beberapa baut cover patah karena getass ( sementara di silikon dan tyrap ) |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 896 |
05 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Preventive elektrik program cleaning 4 motor screw HLS-KT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 897 |
05 Jun 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Preventive elektrik program magger motor CSU :
Magger motor screw nomor 1.2.3.4 hasil magger 550Mohm, ground-ground ok, ground-phase ok, phase-phase ok |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 898 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 899 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 31.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 900 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 41.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 901 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 33.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 902 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 27.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 903 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 32.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 904 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 905 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 30.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 906 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-04 : 32.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 907 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-03 : 33.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 908 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-04 : 45.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 909 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-03 : 43.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 910 |
03 Jun 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning powerpack gate Hooper DLLC 03 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 911 |
03 Jun 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi area gate hooper dan test fungsi, berjalan dengan normal.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 912 |
02 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 913 |
02 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 914 |
02 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 915 |
02 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang Trafo P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 916 |
02 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang panel elektrik P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 917 |
02 Jun 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 918 |
02 Jun 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 919 |
02 Jun 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Indikasi terdapat kabel yang short di area jalur penerangan Conveyor A102. Untuk sementara MCB nomor 6 di Panel di Off kan. Req. Perbaiki jalur
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018328 |
In Process |
||
| 920 |
02 Jun 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Lubrikasi safety device area conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 921 |
02 Jun 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Filter vsd ruang panel P1B kondisi kotor, rekues ganti
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 922 |
02 Jun 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Drive 43 Bearing 40 Fan 40 |
KOTOR
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 923 |
02 Jun 2026
Hasyim Alhabsyi
|
Dermaga 6
CIGADING 2
|
Pengecekan lampu penerangan trestel area dermaga 6 di semua titik. Kondisi OK dan fotocell berfungsi semua.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 924 |
30 May 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Program megger motor drive HOLDING GSU-01:
Antar Phase GROUND - GROUND = 0 MOhm, GROUND - POSITIF = 550 MOhm GROUND - NEGATIF = 550 MOhm POSITIF - NEGATIF = 0 MOhm Exsitasi Ground - F1 : 550 MOhm Ground - F2 : 550 MOhm Kode Motor : M1 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 925 |
30 May 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Program megger motor drive CLOSING GSU-01 :
Antar Phase GROUND - GROUND = 0 MOhm, GROUND - POSITIF = 550 MOhm GROUND - NEGATIF = 550 MOhm POSITIF - NEGATIF = 0 MOhm Exsitasi Ground - F1 : 550 MOhm Ground - F2 : 550 MOhm Kode Motor : M2 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 926 |
29 May 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Program pengujian tahanan isolasi (megger test) motor drive PBCN1, motor brake, dan motor fan. Hasil pengujian nilainya masih OK (550 MOhm)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 927 |
29 May 2026
Hasyim Alhabsyi
|
Conveyor PBCN 2
CIGADING 1
|
Program pengujian tahanan isolasi (megger test) motor drive PBCN2, motor brake, dan motor fan. Hasil pengujian nilainya masih OK (550 MOhm)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 928 |
26 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Melanjutkan program test tahanan isolasi (megger test) untuk 8 pcs AC motor gantry, dan 1 motor kabel drum Medium Voltage. Nilai tahanan : 550 M Ohm semuanya (Kondisi Baik)
Catatan : OK w/ note untuk AC motor nomor 6 (req. ganti Dioda brake SEW Eurodrive tipe BGE 1.5) |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 929 |
25 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Program Insulation tester (test Megger) motor drive dan brake Holding, Clossing, Slewing 1&2 di area motor room dan motor drive Luffing. Hasil nilai tahanannya : 550M Ohm
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 930 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning dan inspeksi elektrikal area Slipring
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 931 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning dan inspeksi sensor Paddleswitch di area CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 932 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning area panel room CCSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 933 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning area Trafo room
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 934 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Penggantian filter motor fan trafo di area trofo room
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 935 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning sensor Sink-in area motor screw HL-SKT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 936 |
23 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning 4 motor screw HL-SKT CCSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 937 |
21 May 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 938 |
21 May 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 939 |
21 May 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch holding dan closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 940 |
21 May 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Chamswitch holding dan closing terpantau OK GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 941 |
21 May 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Pengencangan baud panel LSA/CPA Gantry GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 942 |
21 May 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Cleaning zerospeed GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 943 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 2 CCSU : 28.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 944 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 1 CCSU : 28.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 945 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu motor fan CC3 kiri
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 946 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu Motor fan CC3 kanan ( oke )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 947 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu Motor drive CC3 CSU ( oke )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 948 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu Motor emergency pump CSU
( OKE ) |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 949 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu Motor feeding pump CSU ( OKE )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 950 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu Motor fan CSU ( OKE ) : 40.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 951 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengecekan area slipring dari bagian mainhole atas. Kondisi saat ini sudah cukup bersih dan tidak ditemukan tumpahan material saat kondisi running.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 952 |
20 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu motor main pump hidrolik CSU
( OKE ) |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 953 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi panel-panel di area panel room CCSU, tidak ditemukan indikasi. OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 954 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Pengecekan Kompresor CCSU, kondisi OK. Hanya area sekitar, masih perlu di cleaning.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 955 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Running inspection motor cable drum CCSU. Kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 956 |
20 May 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi equipment Motor gate trucking area CC3 di CCSU, kondisi OK (berikut nameplate motornya)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 957 |
19 May 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1A
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 958 |
19 May 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Filter panel vsd P1A kotor, rekues ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018136 |
In Process |
||
| 959 |
19 May 2026
Anton Diki W
|
Conveyor A101
CIGADING 2
|
Pengukuran suhu motor drive A101 :
Drive 39 Bearing 41 Fan 38 Brake 41 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 960 |
19 May 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Kabel medium voltage 6kV bekas raychem sudah terkelupas, rekuest raychem ulang. Ada 6 titik
|
RELEASE
BY EXECUTOR
|
Medium 130000014227 |
Completed |
||
| 961 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing PHC-01 : 37.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 962 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Slewing PHC-01 : 40.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 963 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Closing PHC-01 : 33.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 964 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Holding PHC-01 : 33.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 965 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Power Panel PHC-01 : 32.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 966 |
18 May 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel gantry PHC-02 : 38.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 967 |
18 May 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-02 : 42.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 968 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-01 : 42.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 969 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Lampu upper / boom tengah PHC-01 masih mati. (Req. Ganti jika crane di posisi laydown)
|
RUSAK RINGAN
REQUEST GANTI
|
TIDAK | Ready to Use |
||
| 970 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Lubrikasi dan repair ringan pada area rol pengarah kabel drum, beberapa ada yang keras (tidak berputar) sudah di normalkan.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 971 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Pengecekan dan cleaning limit switch pada sliding gate hooper PHC-01. Test fungsi gate hooper, OK.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 972 |
18 May 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cleaning motor power pack di hooper PHC-01 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 973 |
18 May 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Pengukuran suhu motor PHC-02 :
HOLDING drive 45 Bearing 42 Fan 51 Brake 1 & 2 46 45 CLOSING Drive 49 Bearing 44 Fan 57 Brake 1 & 2 54 50 SLEWING 1 Drive 46 Bearing 42 Fan 47 Brake 49 SLEWING 2 Drive 41 Bearing 40 Fan 43 Brake 47 LUFFING Drive 37 Bearing 35 Fan 40 Brake 34 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 974 |
18 May 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Ac standing 7 PK sebelah anyer jatuh posisi crane a PHC-02 sedang running, indikasi kawat penahan putus (langsung action) posisi ac saat ini sudah aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 975 |
18 May 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Ruang trafo phc-02 dinding arah anyer ada yang bolong. Ditakutkan masuk air, rekues repair/foam
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 976 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 977 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 978 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Inverter Gantry GSU-01 : 31.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 979 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 43.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 980 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu ruang panel elektrik GSU-04 : 29.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 981 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Closing GSU-04 : 27.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 982 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding inverter GSU-04 : 25.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 983 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry GSU-04 : 26.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 984 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 41.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 985 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Konekan Motor gantry ditemukan lepas 1 pcs (akan dilakukan program megger)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 986 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Motor Eldo brake tidak terpasang di sebelah laut-anyer dan Limit Switch Rusak, Request Perbaiki
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017501 |
In Process |
||
| 987 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Motor Eldo brake tidak terpasang di sebelah darat-anyer dan Limit Switch Rusak, Request Perbaiki
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017501 |
In Process |
||
| 988 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Lampu LED Desk Control 24 VDC mati sebanyak 3 pcs, Request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018124 |
Completed |
||
| 989 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Penggantian filter fan motor holding, clossing, dan trolley GSU-01 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 990 |
14 May 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Penggantian filter fan motor holding, clossing, dan trolley GSU-04 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 991 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
- Motor Eldo brake tidak terpasang di sebelah laut-anyer
- Motor Eldo brake tidak terpasang di sebelah darat-anyer - Motor Eldo brake tidak terpasang di sebelah laut-merak |
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 992 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor power pack, dan motor belt feeder GSU-01 (Test running gate dan belt feeder, OK)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 993 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Konekan Motor gantry ditemukan lepas 1 pcs dan konekan brake ditemukan lepas sebanyak 2pcs (akan dilakukan program megger)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 994 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Ruangan Panel room bocor dan sebagian ada yang sudah jebol. Request Ganti plavon yang jebol
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018130 |
In Process |
||
| 995 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor holding dan penggantian filter fan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 996 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor clossing dan penggantian filter fan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 997 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning motor trolley dan penggantian filter fan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 998 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Ventilasi Fan/Ducting di bagian motor Trolley miring, kondisi saat ini diikat plat tipis. (Tidak ada sparepart nya)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 999 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Emergency Button Gantry Macet/Keras di sebelah darat merak 1pcs dan laut merak 1pcs. Request untuk diganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018129 |
Completed |
||
| 1000 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Kabel Grounding Tidak terpasang/hilang. Request repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 1001 |
14 May 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Panel LCS Gantry lepas dari dudukannya. Request repair dudukan panel LCS
|
RELEASE
REQUEST REPAIR
|
Medium 130000018131 |
Completed |
||
| 1002 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1003 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1004 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 37.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1005 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 34.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1006 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 28.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1007 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 31.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1008 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 30.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1009 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 33.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1010 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-04 : 31.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1011 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 30.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1012 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-04 : 45.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1013 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-03 : 42.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1014 |
13 May 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Motor vibro Hopper DLLC 03 sebelah merakk bagian daratt terdapat kelainan bunyi , indikasi untuk saat ini darii bearing , request service.
|
RELEASE
REQUEST SERVICE
|
Medium 130000018115 |
Completed |
||
| 1015 |
13 May 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning panel gate Hooper DLLC 03
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1016 |
13 May 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning powerpack gate Hooper DLLC 03 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1017 |
12 May 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1018 |
12 May 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1019 |
12 May 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1B Motor 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1020 |
12 May 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang Trafo P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1021 |
12 May 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Inspeksi dan Pengukuran suhu ruang panel elektrik P1B
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1022 |
12 May 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Motor kanan Drive 41 Fan 40 Bearing 39 Motor kiri Drive 42 Bearing 38 Fan 41 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1023 |
12 May 2026
Anton Diki W
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor single drive A102 :
Drive 38 Fan 36 Bearing 38 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1024 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 28.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1025 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 29.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1026 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 29.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1027 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 29.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1028 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 27.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1029 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 33.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1030 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 31.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1031 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 34.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1032 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 31.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1033 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-02 : 46.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1034 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-01 : 29.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1035 |
11 May 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-01 : 42.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1036 |
11 May 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Baut chamswitch holding baut lepas 1 pcs, sementara di tyrap DLLC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1037 |
11 May 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Kondisi Slipring DLLC 02 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1038 |
11 May 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Cleaning panel cabin desk operator DLLC-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1039 |
11 May 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
grounding gate Hooper tidak terpasang 4pcs di DLLC 02
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1040 |
11 May 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Cleaning powerpack gate Hooper DLLC 02 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1041 |
09 May 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Inspeksi dan Pengukuran suhu Trafo P1C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1042 |
09 May 2026
Hasyim Alhabsyi
|
TFH & Feeding
CIGADING 2
|
lighting system Conveyor TFH dan Feeding terdapat 2 titik lampu yang mati di sisi darat
- Tiang nomor 1 dan nomor 5 Request Ganti |
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 1043 |
09 May 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Ruang panel room (trafo room) di P1C kotor. Request Cleaning
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 1044 |
09 May 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Di lighting system Conveyor A103 terdapat 2 titik lampu yang mati.
- Tiang nomor 1 sisi Merak - Tiang nomor 4 sisi Anyer Request Ganti |
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 1045 |
09 May 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Lubrikasi dan cleaning safety device area Conveyor A103
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1046 |
09 May 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu motor drive A103
Motor 1 Drive 41 Fan 37 Bearing 40 Motor 2 Drive 45 Bearing 41 Fan 39 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1047 |
08 May 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Tes running bucket elevator SGT, kondisi ok
Note : horn bucket elevator SGT tidak terpasang |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1048 |
08 May 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT. (Kondisi yang sebelumnya kotor, sudah langsung dibersihkan oleh tim Preventive. Dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1049 |
08 May 2026
Hasyim Alhabsyi
|
Feeding SGT
CIGADING 1
|
Preventive elektrik lighting system dan Cleaning area Bunker Feeding SGT. Kondisi kotor untuk lighting yang kotor dibersihkan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1050 |
07 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Slipring CSU sangat kotor, langsung di cleaning before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1051 |
07 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU (before) dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1052 |
06 May 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01 :
HOLDING drive 42 Bearing 39 Fan 52 Brake 1 & 2 44 46 CLOSING Drive 49 Bearing 44 Fan 50 Brake 1 & 2 52 50 SLEWING 1 Drive 41 Bearing 34 Fan 42 Brake 41 SLEWING 2 Drive 38 Bearing 38 Fan 44 Brake 50 LUFFING Drive 35 Bearing 36 Fan 42 Brake 39 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1053 |
06 May 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Ditemukan Kontaktor Motor gantry No.5 (501Q1) di panel gantry PHC-02 posisi : dilepas
Req. Normalkan |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1054 |
06 May 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
Ruang main trafo dan switchgear terindikasi masih bolong dan terdapat indikasi bolong baru di PHC-02.
|
RELEASE
REQUEST REPAIR
|
Medium 130000018066 |
Completed |
||
| 1055 |
05 May 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Supporting kegiatan preventif mekanik dan eksekutor di area CC2 (CSU). Pengecekan rel, chain, dan shovel yang mengalami kerusakan. Langsung di tangani oleh tim Eksekutor Mekanik
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1056 |
05 May 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch holding dan closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1057 |
05 May 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Kabel glend motor vibrating GSU 06 luka/sobek , sementara di rubber lalu di vinyl. Request ganti.
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018504 |
In Process |
||
| 1058 |
05 May 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Pengencangan baud di panel LSA/CPA gantry GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1059 |
05 May 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1060 |
04 May 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Pengukuran suhu motor Gsu-04
Holding Drive 52 Bearing 45 Fan 43 Closing Drive 56 Bearing 42 Fan 48 Trolley Drive 60 Bearing 41 Fan 46 Suhu Motor belt feeder GSU 04 Motor 01 Drive 37 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1061 |
04 May 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Pengukuran suhu motor Gsu-01
Holding Drive 59 Bearing 42 Fan 48 Closing Drive 60 Bearing 47 Fan 50 Trolley Drive 53 Bearing 42 Fan 50 Suhu motor belt feeder GSU 01 Motor 2 Drive 39 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1062 |
04 May 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Penggantian filter motor fan holding closing trolley GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1063 |
04 May 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Penggantian filter motor fan holding closing trolley GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1064 |
30 Apr 2026
Anton Diki W
|
Tower 2
CIGADING 1
|
Pengecekan suhu motor BCNO :
Motor 1 Drive 49 Bearing 46 Brake 46 Motor 2 Drive 44 Bearing 43 Brake 50 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1065 |
29 Apr 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Pengecekan safety device di area conveyor PBCN-01 sebelum running kapal batubara
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1066 |
29 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Lubrikasi roll pendulum/ pengarah kabel drum 6kV DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1067 |
29 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Pengecekan ruang trafo, main trafo dan switchgear DLLC-01, Kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1068 |
29 Apr 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Pengecekan Bridge crane DLLC 01 untuk sistem elektriknya, kondisi OK.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1069 |
29 Apr 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Kondisi Slipring DLLC 01 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1070 |
29 Apr 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Chamswitch holding closing kondisi baut masih lengkap (ok) DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1071 |
29 Apr 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Ruang gantry DLLC 01 kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1072 |
29 Apr 2026
Anton Diki W
|
DLLC-01
CIGADING 1
|
Cleaning powerpack gate Hooper DLLC 01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1073 |
29 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Lampu penerangan Downlight dan Upperlight OK. Lampu bisa di nyalakan dari local panel di gantry.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1074 |
28 Apr 2026
Hasyim Alhabsyi
|
Conveyor PBCN 2
CIGADING 1
|
Lubrikasi zero speed GSU-01 dan GSU-04 sisi laut dan sisi darat conveyor PBCN-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1075 |
28 Apr 2026
Hasyim Alhabsyi
|
Conveyor PBCN 1
CIGADING 1
|
Lubrikasi zero speed GSU-01 dan GSU-04 sisi laut dan sisi darat conveyor PBCN-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1076 |
27 Apr 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 2 CCSU : 28.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1077 |
27 Apr 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel 1 CCSU : 30.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1078 |
27 Apr 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Inspeksi area slipring CCSU, masih terdapat tumpukan sisa material di area slipring.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1079 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor drive CC2 sisi laut
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1080 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor drive CC2 sisi darat
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1081 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kanan
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1082 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu fan CC3 kiri
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1083 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
suhu Motor drive CC3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1084 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Kabel grounding CC2 putus. Request Ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000016631 |
Completed |
||
| 1085 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor emergency pump CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1086 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu Motor feeding pump CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1087 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu motor fan CSU : 57.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1088 |
27 Apr 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Suhu motor main pump hidrolik CSU
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1089 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing PHC-01 : 36.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1090 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Slewing PHC-01 : 35.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1091 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Closing PHC-01 : 33.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1092 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Holding PHC-01 : 32.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1093 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Power Panel PHC-01 : 31.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1094 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel gantry PHC-02 : 37.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1095 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-02 : 42.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1096 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo PHC-01 : 43.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1097 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Sakelar untuk lampu penerangan di motor room PHC-02 rusak. Request Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017986 |
In Process |
||
| 1098 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Motor truster brake gantry No. 3 macet (Posisi : Darat arah Anyer). Request Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017981 |
In Process |
||
| 1099 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Lampu boom tengah (400 W) dan lampu top boom (400 W) di PHC-02 mati (2 Pcs). Request Ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017985 |
In Process |
||
| 1100 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Sakelar untuk lampu penerangan di auxtrally trafo PHC-02 rusak. Request Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017984 |
In Process |
||
| 1101 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Inspeksi cabel reel Medium Voltage, AC Motor 1 dan AC Motor 2.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1102 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Pengecekan motor Pin lock sisi darat dan sisi laut di area top boom PHC-01. Kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1103 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Exhaust fan di area motor room tidak terpasang di kedua titiknya. Request Pasangkan
|
RUSAK RINGAN
REQUEST SERVICE
|
Medium 130000017983 |
In Process |
||
| 1104 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Motor truster brake gantry No. 3 macet (Posisi : Darat arah Anyer). Request Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017982 |
In Process |
||
| 1105 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Sakelar untuk lampu penerangan di auxtrally trafo rusak. Request Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017979 |
In Process |
||
| 1106 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Lampu penerangan di depan ruang trafo PHC-01 berkedip, Request Ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017978 |
Completed |
||
| 1107 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Lampu boom tengah (400 W) di PHC-01 mati. Request Ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017977 |
In Process |
||
| 1108 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Cooling fan oil tidak terpasang di motor Powerpack gate hooper PHC-01
|
RELEASE
REQUEST REPAIR
|
Medium 130000016236 |
Completed |
||
| 1109 |
25 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Inspeksi cabel reel Medium Voltage, AC Motor 1 dan AC Motor 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1110 |
25 Apr 2026
Anton Diki W
|
PHC-02
CIGADING 1
|
cleaning power pack gate hopper PHC-02 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1111 |
25 Apr 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
Cleaning panel elektrik gate hooper PHC-01 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1112 |
25 Apr 2026
Anton Diki W
|
PHC-01
CIGADING 1
|
cleaning power pack gate hopper PHC-01 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1113 |
24 Apr 2026
Anton Diki W
|
Feeding SGT
CIGADING 1
|
Cleaning motor bucket elevator SGT
Before dan after |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1114 |
23 Apr 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Inspeksi dan Pengukuran suhu Panel VSD P1A
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1115 |
23 Apr 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Cleaning dan lubrikasi safety device A101
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1116 |
23 Apr 2026
Hasyim Alhabsyi
|
Conveyor A101
CIGADING 2
|
Lubrikasi zerospeed GSU-05 dan GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1117 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1118 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 30.0°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1119 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 30.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1120 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 34.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1121 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 27.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1122 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 33.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1123 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 31.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1124 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 29.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1125 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-04 : 34.4°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1126 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-03 : 29.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1127 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-04 : 41.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1128 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-03 : 50.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1129 |
22 Apr 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Bridge crane DLLC 04 kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1130 |
22 Apr 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Kondisi Slipring DLLC 04 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1131 |
22 Apr 2026
Anton Diki W
|
DLLC-04
CIGADING 1
|
Baut chamswitch holding baut lepas 1 pcs, sementara di tyrap DLLC-04
|
RELEASE
PREVENTIVE MAINTENANCE
|
PANTAU | Completed |
||
| 1132 |
22 Apr 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Kondisi Slipring DLLC 03 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1133 |
22 Apr 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Baut chamswitch holding baut lepas 1 pcs, sementara di tyrap DLLC-03
|
RELEASE
REQUEST PENAMBAHAN
|
PANTAU | Completed |
||
| 1134 |
22 Apr 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
Cleaning powerpack gate Hooper DLLC 03 before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1135 |
22 Apr 2026
Anton Diki W
|
DLLC-03
CIGADING 1
|
grounding gate Hooper tidak terpasang 2pcs di DLLC 03
|
RELEASE
BY EXECUTOR
|
PANTAU | Completed |
||
| 1136 |
22 Apr 2026
Hasyim Alhabsyi
|
DLLC-03
CIGADING 1
|
Cleaning motor powerpack gate Hooper DLLC 03 (dokumentasi before dan after)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1137 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 2)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1138 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Inspeksi dan Pengukuran suhu Vibrating (Motor 1)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1139 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Cam switch holding dan closing terpantau OK di GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1140 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Roll festune cabin operator Kendor di GSU 05 ( langsung action ), dokumentasi before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1141 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1142 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Motor gantry GSU 05 tidak terpasang 1pcs no 2 Darii darat
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1143 |
21 Apr 2026
Anton Diki W
|
GSU-05
CIGADING 2
|
Bearing roll festune cabin GSU 05 tidak terpasang 1 pcs no 2 Dari cabin
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000015110 |
In Process |
||
| 1144 |
21 Apr 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll pendulum medium voltage GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1145 |
21 Apr 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1146 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Kabel glend motor vibrating GSU-05 luka, langsung action di rubber lalu di vinyl
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
Medium 130000017798 |
In Process |
||
| 1147 |
21 Apr 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Cover fan motor cabin operator tidak terpasang di GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1148 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning zerospeed GSU-05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1149 |
21 Apr 2026
Anton Diki W
|
GSU-06
CIGADING 2
|
Chamswitch holding dan closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1150 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Pengencangan baud LSA/CPA GANTRY GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1151 |
21 Apr 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Cleaning zerospeed GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1152 |
20 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Motor room DLLC-01 berlubang, rekues service
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1153 |
20 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Grounding hopper DLLC-01 tidak terpasang 3 pcs, Req pasang
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
PANTAU | Ready to Use |
||
| 1154 |
20 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Cleaning motor powerpack gate hopper DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1155 |
20 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Ruang trafo DLLC-01 kotor, Req Cleaning
|
RELEASE
REQUEST BERSIHKAN
|
Medium 130000016820 |
Completed |
||
| 1156 |
20 Apr 2026
Anton Diki W
|
DLLC-02
CIGADING 1
|
Kondisi Slipring DLLC 02 untuk saat ini masih terpantau amann
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1157 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1158 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Boom trolley Inverter GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1159 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry Inverter GSU-01 : 32.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1160 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Trafo GSU-01 : 38.6°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1161 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu ruang panel elektrik GSU-04 : 28.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1162 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Closing GSU-04 : 31.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1163 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Holding inverter GSU-04 : 33.1°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1164 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel Gantry GSU-04 : 25.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1165 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu panel PLC Control GSU-01 : 32.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1166 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Coupling motor kabel drum GSU-04 berkarat. Req. Service
|
RELEASE
REQUEST SERVICE
|
Medium 130000017930 |
Completed |
||
| 1167 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Cover fan motor kabel drum GSU-04 rusak dan korosi. Req. Ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017931 |
Completed |
||
| 1168 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cover fan motor kabel drum GSU-01 rusak dan korosi. Req. Ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017928 |
Completed |
||
| 1169 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Karet coupling motor kabel drum GSU-01 lepas dari dudukannya. Req. Service
|
RELEASE
REQUEST SERVICE
|
Medium 130000017929 |
Completed |
||
| 1170 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Main trafo GSU 01 butuh di cleaning
|
RELEASE
REQUEST BERSIHKAN
|
Medium 130000017932 |
Completed |
||
| 1171 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Struktur kanopi panel LCS gantry GSU-04 rusak. Request Perbaikan
|
RELEASE
REQUEST REPAIR
|
Medium 130000018050 |
Completed |
||
| 1172 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Motor eldo brake GSU-04 tidak ada 2 pcs (1 darat merak, 1 laut merak)
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000017501 |
In Process |
||
| 1173 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Atap / Plavon ruang panel terlihat bekas bocor di GSU-04, req. Pantau
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1174 |
18 Apr 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Motor eldro break GSU-01 tidak terpasang sebayak 3 Pcs ( ket : 2pcs sisi darat Anyer, 1pcs sisi laut Anyer). Request pasang
|
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 1175 |
18 Apr 2026
Anton Diki W
|
GSU-04
CIGADING 1
|
Roll pendulum kabel drum di GSU-04 sebanyak 6 pcs macet di sebelah merak. Request Repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017924 |
Completed |
||
| 1176 |
18 Apr 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
Roll pendulum kabel drum di GSU-01 sebanyak 3 pcs macet di sebelah merak. Request Repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017923 |
Completed |
||
| 1177 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Lubrikasi roll festune cabin operator di GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1178 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Lubrikasi underspeed GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1179 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Cleaning underspeed GSU-01, ditemukannya semut di dalam underspeed (langsung di cleaning & tutup lobang menggunakan silikon)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1180 |
18 Apr 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Penggantian filter motor fan boom GSU-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1181 |
17 Apr 2026
Hasyim Alhabsyi
|
CONV C02
CIGADING 1
|
Preventive program shutdown Cleaning motor BCNO
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1182 |
17 Apr 2026
Hasyim Alhabsyi
|
CONV BCNO
CIGADING 1
|
Preventive program shutdown Cleaning motor BCNO dan cleaning Panel Tower 11
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1183 |
16 Apr 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
tray kabel area A103 rusak. Request Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 1184 |
16 Apr 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Karet legging di drum bend head pulley (shuttle) indikasi sobek di area A103 request Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017916 |
In Process |
||
| 1185 |
16 Apr 2026
Anton Diki W
|
TFH & Feeding
CIGADING 2
|
Cleaning motor power pack TFH
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1186 |
16 Apr 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Lampu LED conveyor A103 mati 7pcs sebelah merak dan 7pcs sebelah Anyer. Request Ganti
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 1187 |
16 Apr 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Pengukuran suhu motor drive Conveyor A103
Motor 1 Drive 41 Fan 38 Bearing 40 Motor 2 Drive 42 Bearing 39 Fan 42 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1188 |
16 Apr 2026
Anton Diki W
|
Conveyor A103
CIGADING 2
|
Ruang panel P1C banyak yang retak di dinding, Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 1189 |
16 Apr 2026
Hasyim Alhabsyi
|
MV CGD2
CIGADING 2
|
Trafo 30 KV Cigading 2 kotor, rekues cleaning
|
RUSAK RINGAN
REQUEST BERSIHKAN
|
Medium 130000017913 |
In Process |
||
| 1190 |
15 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Pengukuran suhu motor PHC-01 :
HOLDING drive 43 Bearing 40 Fan 57 Brake 1 & 2 46 46 CLOSING Drive 54 Bearing 47 Fan 53 Brake 1 & 2 58 56 SLEWING 1 Drive 52 Bearing 42 Fan 46 Brake 58 SLEWING 2 Drive 50 Bearing 40 Fan 40 Brake 60 LUFFING Drive 36 Bearing 35 Fan 42 Brake 37 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1191 |
15 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Perbaiki jalur lampu frame lights dan MCB 203f3 yg rusak di PHC 01
|
RELEASE
REQUEST REPAIR
|
Medium 130000017912<br/> 130000017907 |
Completed |
||
| 1192 |
15 Apr 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Grounding area gantry tidak terpasang 2 pcs, rekues pasang PHC-01
|
RELEASE
REQUEST PENAMBAHAN
|
Medium | Completed |
||
| 1193 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 29.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1194 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Luffing: 28.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1195 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 30.9°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1196 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Closing: 30.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1197 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 33.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1198 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Holding : 30.3°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1199 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 32.2°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1200 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel room elektrik Slewing : 31.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1201 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-02 : 29.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1202 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-02 : 40.5°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1203 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu Panel Gantry DLLC-01 : 30.8°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1204 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Inspeksi dan Pengukuran suhu trafo DLLC-01 : 49.7°C
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1205 |
14 Apr 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Cleaning motor powerpack gate hopper DLLC-01
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1206 |
14 Apr 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Underspeed conveyor A103 posisi di bawah, terdapat Grease dan kotor butuh di cleaning
|
RUSAK RINGAN
REQUEST BERSIHKAN
|
Medium | Outstanding |
||
| 1207 |
14 Apr 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor drive A102
Motor kanan Drive 42 Fan 40 Bearing 38 Motor kiri Drive 42 Bearing 37 Fan 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1208 |
14 Apr 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
Pengukuran suhu motor single drive A102 :
Drive 39 Fan 36 Bearing 35 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1209 |
13 Apr 2026
Hasyim Alhabsyi
|
GSU-04
CIGADING 1
|
Lubrikasi roll festun cabin operator GSU-04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1210 |
30 Mar 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Motor Screw No.4 (sisi laut arah merak) di Crane CSU macet. Request Repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017653 |
Completed |
||
| 1211 |
30 Mar 2026
Anton Diki W
|
GSU-01
CIGADING 1
|
lampu indikator shuttle pos 1 dan pos 2 mati. 1 mati dan 1 tidak terpasang.. 24 Vdc GSU-01
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 1212 |
30 Mar 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Tangkai Limit switch batas laut di rel belt feeder GSU-01 patah, Req. Repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 1213 |
30 Mar 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Motor gantry GSU 01 tidak terpasang 3 pcs sebelah laut
|
RELEASE
BY EXECUTOR
|
Medium | Completed |
||
| 1214 |
30 Mar 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Eldro brake gantry GSU 01 tidak terpasang 3pcs. Request Tambahkan (pasang)
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium | Outstanding |
||
| 1215 |
30 Mar 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
Kondisi Panel Komunikasi di Gsu-01 lembab plus kemasukan air. Req. perbaiki seal panel yang sudah rusak. gsu-01 dan foam bagian lubang yang tidak tertutup.
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 1216 |
30 Mar 2026
Hasyim Alhabsyi
|
GSU-01
CIGADING 1
|
bebaskan proximity batas bawah gate hopper GSU-01 yang ke gencet plat pengarah. sudah dibebaskan. req. modifikasi plat pengarah proximity seperti bagian laut.
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 1217 |
27 Mar 2026
Hasyim Alhabsyi
|
FEEDING SGT
CIGADING 1
|
Perbaikan Motor Fan Feeding SGT karena short, kabel di panel Control di lepas.
|
RELEASE
REQUEST REPAIR
|
Medium 130000017706 |
Completed |
||
| 1218 |
17 Mar 2026
Hasyim Alhabsyi
|
CONV C02
CIGADING 1
|
Cleaning motor drive conveyor C-02
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1219 |
17 Mar 2026
Hasyim Alhabsyi
|
CONV BCNO
CIGADING 1
|
Cleaning motor drive conveyor BCNO
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1220 |
13 Mar 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning jalur kabel slipring CSU. Dokumentasi before dan after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1221 |
13 Mar 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Cleaning dan Penggantian filter fan ruang trafo CSU. Dokumentasi before-after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1222 |
13 Mar 2026
Anton Diki W
|
CCSU
CIGADING 1
|
Junction box Motor screw CSU lepas dari dudukan indikasi ketarik. Request Repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 1223 |
13 Mar 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning ruang panel elektrik CSU. Dokumentasi before-after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1224 |
13 Mar 2026
Hasyim Alhabsyi
|
CCSU
CIGADING 1
|
Cleaning sensor sink in HL SKT CSU. Dokumentasi before-after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1225 |
12 Mar 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
MCB no.07 di panel no.2 (LP0-G-102B) conveyor A102 untuk tiang lampu no.41, 42, 43 sering trip. Req. Perbaiki jalur kabel
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000016936 |
In Process |
||
| 1226 |
12 Mar 2026
Hasyim Alhabsyi
|
Conveyor A102
CIGADING 2
|
MCB 6A (no.05) untuk penerangan lampu conv A102 di panel arah darat sisi merak sering trip. Req. Repair jalur kabel
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000016473 |
In Process |
||
| 1227 |
11 Mar 2026
Hasyim Alhabsyi
|
DLLC-02
CIGADING 1
|
Grounding area gantry DLLC 02 terpantau lengkap
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1228 |
11 Mar 2026
Hasyim Alhabsyi
|
DLLC-01
CIGADING 1
|
Lampu LED 8 watt ruang panel gantry mati 2 pcs, rekues ganti DLLC-02
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017661 |
In Process |
||
| 1229 |
10 Mar 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
"Pengukuran suhu motor drive A103
Motor 1 Drive 39 Fan 35 Bearing 38 Motor 2 Drive 39 Bearing 36 Fan 33" |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1230 |
10 Mar 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Filter panel drive P1C kotor, rekues ganti
|
RELEASE
BY EXECUTOR
|
Medium 130000017655 |
Completed |
||
| 1231 |
10 Mar 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Filter panel vsd bagian belakang P1C tidak terpasang 4pcs. Request Tambahkan
|
RELEASE
BY EXECUTOR
|
Medium 130000017656 |
Completed |
||
| 1232 |
10 Mar 2026
Hasyim Alhabsyi
|
Conveyor A103
CIGADING 2
|
Kondisi panel vsd kotor rekues cleaning, di P1C
|
RELEASE
BY EXECUTOR
|
Medium 130000017651 |
Completed |
||
| 1233 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu LED 18W motor room GSU-06 tidak terpasang 6pcs, Req. Tambahkan
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000014231 |
In Process |
||
| 1234 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Chamswitch holding dan closing terpantau OK GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1235 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Perbaikan kabel vibrating luka langsung action GSU 06. DOkumentasi before-after
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1236 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lubrikasi roll festune cabin operator GSU 06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1237 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
pengencangan baud di panel LSA/CPA gantry GSU-06
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1238 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Raychem kabel medium voltage GSU-06 terkelupas 1 titik, rekues raychem ulang
|
RELEASE
BY EXECUTOR
|
Medium 130000014227 |
Completed |
||
| 1239 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Lampu boom GSU 06 Kondisi OK
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1240 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-06
CIGADING 2
|
Dudukan emergency GSU 06 sebelah laut korosi , request repair
|
RELEASE
BY EXECUTOR
|
Medium 130000017592 |
Completed |
||
| 1241 |
03 Mar 2026
Hasyim Alhabsyi
|
GSU-05
CIGADING 2
|
Posisi sensor proximity tidak ada dudukannya GSU-05, Rekues penambahan dudukan
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017586 |
In Process |
||
| 1242 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Dinding Ruang motor room PHC-01 bolong atau keropos. request repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017589 |
Completed |
||
| 1243 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Kontaktor di panel luffing (486K2) PHC-01 terdapat kelainan bunyi/pong. req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017590 |
Completed |
||
| 1244 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
fan panel di panel room elektrik mati 7pcs. req perbaiki instalasi dan ganti fan yang mati. PHC 01
- panel rectifier 1pcs - panel holding 2pcs - panel closing 1pcs - panel luffing 2pcs - panel spreader 1pcs |
RELEASE
BY EXECUTOR
|
Medium 130000017581 |
Completed |
||
| 1245 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Exhaust fan di motor room PHC-01 tidak terpasang. Request Tambahkan
|
RUSAK BERAT
REQUEST PENAMBAHAN
|
Medium 130000017579 |
In Process |
||
| 1246 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Isolasi kabel power 6 KV rusak PHC 02. Req. raychem kabel ulang (Service)
|
RELEASE
REQUEST SERVICE
|
Medium 130000017574 |
Completed |
||
| 1247 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Isolasi kabel power 6 KV rusak PHC-01. Req. raychem kabel ulang (Service)
|
RELEASE
REQUEST SERVICE
|
Medium 130000017573 |
Completed |
||
| 1248 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
"Pengukuran suhu motor PHC-01 dalam derajat Celcius :
Holding Drive 36 Bearing 34 Brake 1 39 Brake 2 39 Fan 49 Closing Drive 44 Bearing 39 Brake 1 47 Brake 2 44 Fan 52 Slewing 1 Drive 38 Bearing 34 Fan 34 Brake 46 Slewing 2 Drive 40 Bearing 34 Fan 34 Brake 47 Luffing Drive 33 Bearing 35 Brake 41 Fan 31" |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1249 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Ruang trafo PHC-01 dinding bolong 3 titik, rekues repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017361 |
Completed |
||
| 1250 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-01
CIGADING 1
|
Kabel Grounding area gantry PHC 01 hilang 2 pcs, Posisi sebelah darat. Req. Tambahkan
|
RELEASE
REQUEST TAMBAHKAN
|
Medium 130000014469 |
Completed |
||
| 1251 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Pengukuran suhu motor PHC-02 (dalam satuan Celcius) :
Holding : Drive 40 Bearing 39 Fan 50 Brake 1 & 2 43 & 41 Closing : Drive 42 Bearing 44 Fan 47 Brake 1 & 2 47 & 43 Slewing : Drive 41 Bearing 40 Fan 41 Brake 44 Slewing 2 : Drive 43 Bearing 42 Fan 41 Brake 46 Luffing : Drive 37 Bearing 36 Fan 39 Brake 40 |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 1252 |
02 Mar 2026
Hasyim Alhabsyi
|
PHC-02
CIGADING 1
|
Kabel Grounding di area gantry Phc-02 tidak terpasang 5 pcs, Req. Tambahkan
|
RELEASE
REQUEST TAMBAHKAN
|
Medium 130000014470 |
Completed |
| NO | Tanggal / Petugas | Lokasi | Keterangan Aktivitas | Kondisi & Rekomendasi | Notifikasi | Dokumentasi | Status | Aksi |
|---|---|---|---|---|---|---|---|---|
| 1 |
21 Nov 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Program running inspection GSU 4
- gantry unit - discharging unit - Trolley unit - holding closing unit Hasil inspection kondisi alat layak pakai |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 2 |
21 Nov 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Program running inspection GSU 1 & 4
- gantry unit - discharging unit - Trolley unit - holding closing unit Hasil inspection kondisi alat layak pakai |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 3 |
20 Nov 2026
M. Zainudin
|
Feeding SGT
CIGADING 1
|
Preventif program shutdown inspection area bungker feeding SGT
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 4 |
19 Nov 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Preventif mekanik Program inspection A102, kondisi masih aman
- konstruksi - belt conveyor - roll top, roll return - fram roll - drum pulley - brake sistem |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 5 |
18 Nov 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 4:
- Gantry unit - Discharging sistem - Wire rope holding, closing - Brake sistem holding, closing, luffing, slewing - Gear slewing, luffing - Autolube |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 6 |
18 Nov 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 4:
- Gantry unit - Discharging sistem - Wire rope holding, closing - Brake sistem holding, closing, luffing, slewing - Gear slewing, luffing - Autolube |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 7 |
18 Nov 2026
Oka Aulia Yusuf
|
DLLC-04
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 4:
- Gantry unit - Discharging sistem - Wire rope holding, closing - Brake sistem holding, closing, luffing, slewing - Gear slewing, luffing - Autolube |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 8 |
17 Nov 2026
M. Zainudin
|
Grabe Cigading 2
CIGADING 2
|
Program running inspection Grabe cigading 2
kondisi masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 9 |
16 Nov 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Pulley holding bagian anyer retak di Auxtrolley unit di gsu 05
|
RUSAK BERAT
REQUEST REPAIR
|
Emergency 130000019532 |
In Process |
||
| 10 |
16 Nov 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Wire rope closing gsu 6 rantas 2kwt/strnd-6d/12kwt (jarak +-20 meter dari mangkok, sisa di drum masih banyak
|
RUSAK BERAT
REQUEST GANTI
|
Emergency 130000019592 |
In Process |
||
| 11 |
16 Nov 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Pulley holding bagian anyer retak di Auxtrolley unit di gsu 6
|
RUSAK RINGAN
REQUEST REPAIR
|
Emergency 130000019591 |
In Process |
||
| 12 |
16 Nov 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Rail trolley bagian anyer retak di gsu 6. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Emergency 130000019590 |
In Process |
||
| 13 |
16 Nov 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Running inspection csu, kondisi masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 14 |
12 Nov 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Program shutdown inspection GSU 6
- gantry unit - discharging sistem - trolley unit - holding closing - motor room area |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 15 |
12 Nov 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Program shutdown inspection GSU 5
- gantry unit - discharging sistem - trolley unit - holding closing - motor room area |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 16 |
11 Nov 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
GSU 1 plat Hopper bagian darat rusak request perbaikan
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 17 |
11 Nov 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Roll prepenting rusak bagian merak di maintrolley unit gsu 1. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 18 |
10 Nov 2026
Oka Aulia Yusuf
|
Grabe Cigading 2
CIGADING 2
|
Dinding bucket grab P5 bagian darat ada yg tipis & bolong di cigading 2. Request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Low | Outstanding |
||
| 19 |
09 Nov 2026
M. Zainudin
|
DLLC-02
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 02
- Gabtry unit - Discharging sistem - Wire rope holding, closing - Brake sistem holding, closing, luffing, slewing - Gear slewing, luffing - Autolube |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 20 |
09 Nov 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 01
- Gabtry unit - Discharging sistem - Wire rope holding, closing - Brake sistem holding, closing, luffing, slewing - Gear slewing, luffing - Autolube |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 21 |
07 Nov 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
PHC 2 wire rope holding rantas 1kwt/strnd - 6kwt/6d ( pantau)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 22 |
07 Nov 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
PHC 2 kampas brake holding tipis sebelah (pantau)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 23 |
07 Nov 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
PHC 2 wire rope counter weight rantas 2kwt/strnd - 5kwt/6d (pantau)
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 24 |
07 Nov 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
PHC 2 gearbox gantry butuh tambah grease
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
Low 130000019487 |
Completed |
||
| 25 |
07 Nov 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
Stopbar track gear boom bagian kanan & kiri pecah di phc 1. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Low 130000019483 |
In Process |
||
| 26 |
07 Nov 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
PHC 1 gearbox gantry kering request penambahan pelumas
|
RELEASE
BY EXECUTOR
|
Low 130000019484 |
Completed |
||
| 27 |
05 Nov 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Preventif mekanik program inspection mekanikal sistem di conveyor 102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 28 |
05 Nov 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 588 bagian anyer tabungnya patah di A102. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Low 130000019376 |
In Process |
||
| 29 |
05 Nov 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 641 bagian anyer macet di A102. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Low 130000019376 |
In Process |
||
| 30 |
04 Nov 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 3 & 4 :
- Gabtry unit - Discharging sistem - Wire rope holding, closing - Brake sistem holding, closing, luffing, slewing - Gear slewing, luffing - Autolube |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 31 |
04 Nov 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 4
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 32 |
04 Nov 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Preventif mekanik program inspection mekanikal sistem DLLC 3
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 33 |
03 Nov 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Preventif mekanik running inspection A103 & TFH
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 34 |
03 Nov 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Preventif mekanik running inspection A103 & TFH
Kondisi Alat sementara Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 35 |
02 Nov 2026
M. Zainudin
|
CCSU
CIGADING 1
|
9 pcs sovel lassan patah
|
RELEASE
REQUEST REPAIR
|
TIDAK | Completed |
||
| 36 |
02 Nov 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Sovel chain CC1 lasan patah 9pcs
|
RELEASE
REQUEST REPAIR
|
Medium 130000019387 |
Completed |
||
| 37 |
02 Nov 2026
M. Zainudin
|
CCSU
CIGADING 1
|
NDT chain CCSU di area CC1 ( 42 ocs NDT ok )
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 38 |
29 Oct 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 512 bagian merak tabungnya bolong di A102. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Low 130000019140 |
In Process |
||
| 39 |
28 Oct 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Grabe P5 rantas 2kwt/strnd-6d/13kwt posisi grabe di gsu 06
|
RUSAK BERAT
REQUEST GANTI
|
No Priority 130000019318 |
In Process |
||
| 40 |
28 Oct 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Kontruksi area leadsead lasnya retak
|
RUSAK RINGAN
REQUEST REPAIR
|
No Priority 130000019319 |
In Process |
||
| 41 |
28 Oct 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
GSU 6 shaft pulley auxtrolley unit sebelah merak bosing lepas
|
RUSAK BERAT
REQUEST REPAIR
|
Emergency 130000019316 |
In Process |
||
| 42 |
28 Oct 2026
Oka Aulia Yusuf
|
GSU-06
CIGADING 2
|
Pulley holding bagian anyer retak di pivot unit gsu 6. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Low 130000019249 |
In Process |
||
| 43 |
28 Oct 2026
Oka Aulia Yusuf
|
GSU-06
CIGADING 2
|
Rail trolley bagian anyer retak di gsu 6. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Low 130000019250 |
In Process |
||
| 44 |
28 Oct 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wire rope auxtrolley alur kiri rantas 3kwt/st130000019317r 6d=12kwt di gsu 5. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Low 130000019317 |
In Process |
||
| 45 |
28 Oct 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Program preventif mekansiytem di Gsu
Kondisi Alat sementara masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 46 |
27 Oct 2026
Oka Aulia Yusuf
|
GSU-06
CIGADING 2
|
GSU 6 dudukan rubber suspension sebelah laut-merak las2an retak (request repair)
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019306 |
In Process |
||
| 47 |
27 Oct 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Dinding bucket grab C2 ada yg bolong di cigading 2. Request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019305 |
In Process |
||
| 48 |
26 Oct 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
Baut running wheel counter weight bagian atas darat patah 2 pcs di phc 1. Req ganti
|
RELEASE
REQUEST REPAIR
|
Medium 130000019290 |
Completed |
||
| 49 |
26 Oct 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
Baut running wheel counter weight bagian bawah darat patah 2 pcs di phc 1. Req ganti
|
RELEASE
REQUEST REPAIR
|
Medium 130000019290 |
Completed |
||
| 50 |
24 Oct 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
DLLC 4 wire rope holding rantas 1kwt/strnd-3kwt/6d
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 51 |
24 Oct 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Preventive mekanisytem di DLLC untuk mekanisytem seperti gearslwing, gentry,grase, dan brake sistem sementara masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 52 |
24 Oct 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
DLLC 4 wire rope closing rantas 3kwt/strnd-10kwt/6d
|
RUSAK BERAT
REQUEST GANTI
|
Emergency 130000019271 |
In Process |
||
| 53 |
24 Oct 2026
Oka Aulia Yusuf
|
DLLC-03
CIGADING 1
|
Open gear gantry kering di DLLC 3. Request lubrikasi
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
Medium 130000019282 |
Completed |
||
| 54 |
24 Oct 2026
Oka Aulia Yusuf
|
DLLC-03
CIGADING 1
|
Stopbar gantry bagian laut/anyer pecah di dllc 3. request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018696 |
In Process |
||
| 55 |
24 Oct 2026
Oka Aulia Yusuf
|
DLLC-03
CIGADING 1
|
Stopbar gantry bagian darat/anyer pecah di dllc 3. request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018697 |
In Process |
||
| 56 |
23 Oct 2026
M. Zainudin
|
Feeding SGT
CIGADING 1
|
Sporting Tim vulkanisir pergantian buckeat fieding SGT
|
RUSAK BERAT
REQUEST GANTI
|
No Priority 130000019240 |
In Process |
||
| 57 |
23 Oct 2026
Oka Aulia Yusuf
|
Feeding SGT
CIGADING 1
|
Dinding bucket elevator bagian atas ada yg bolong di fiding sgt. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019355 |
In Process |
||
| 58 |
22 Oct 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Karet legging drum snub head pulley terkelupas di A102. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019356 |
In Process |
||
| 59 |
21 Oct 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Preventif mekanisytem di CCSU
Kondisi Sementara alat masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 60 |
20 Oct 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Program preventif mekanisytem di 103
Kondisi Alat mekanisytem sementara masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 61 |
19 Oct 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
Wire rope counterweight rantas 3kwt/str 6d=6kwt di phc 2. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 62 |
19 Oct 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Anak tangga grabe di PHC 01 Indikasi anak tangga patak
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019357 |
In Process |
||
| 63 |
17 Oct 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Wire rope holding rantas 3kwt/str 6d=6kwt di dllc 1
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 64 |
17 Oct 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Anak tangga grab G4 lepas 2 pcs & lasing nya putus posisi grab di dllc 1. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018350 |
In Process |
||
| 65 |
16 Oct 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Potong wire rope closing GSU05 yang rantas +/- 30 meter
|
RUSAK BERAT
REQUEST GANTI
|
High 130000019235 |
In Process |
||
| 66 |
15 Oct 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wheel brake gantry GSU 05 LS indikasi tidak ada pressure, isi oli OK. Request service dan ganti selang dan pompa
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019228 |
In Process |
||
| 67 |
15 Oct 2026
Oka Aulia Yusuf
|
GSU-06
CIGADING 2
|
Pressure gauge powerpack wheel brake gantry rusak bagian darat & laut di gsu 6. request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019229 |
In Process |
||
| 68 |
15 Oct 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Pressure gauge powerpack wheel brake gantry rusak bagian darat & laut di gsu 5 . request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000019230 |
In Process |
||
| 69 |
14 Oct 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Program preventif mekanisytem di dllc
Kondisi sementara masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 70 |
08 Oct 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Preventif mekanisytem di area Grabe dan conveyor 101 kondisi sementara masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 71 |
08 Oct 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Wire rope holding rantas 3 kwt/str 6d=12kwt spare di drum masih ada di gsu 6.
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000019181 |
In Process |
||
| 72 |
08 Oct 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Wire rope maintrolley alur kanan sebelah anyer rantas 3kwt/str 6d=10kwt di gsu 5
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000019180 |
In Process |
||
| 73 |
07 Oct 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Karet stokbard Dllc 03 indikasi pecah kiri-kanan arah anyer
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018696 |
In Process |
||
| 74 |
07 Oct 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Handrail di samping cabin operator indikasi Lepas lasanya di DLLC-03
|
RELEASE
REQUEST REPAIR
|
Medium 130000019174 |
Completed |
||
| 75 |
05 Oct 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Preventif mekanik sistem di Ccsu kondisi sementara masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 76 |
03 Oct 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
Track gear boom di PHC 1 kering. Request lubrikasi
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
Medium 130000019358 |
Completed |
||
| 77 |
03 Oct 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
Oli power pack closing PHC 2 perlu penambahan
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
Medium 130000019154 |
Completed |
||
| 78 |
29 Sep 2026
Oka Aulia Yusuf
|
Conveyor A101
CIGADING 2
|
Karet legging drum bend head pulley tipis di A101. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019111 |
In Process |
||
| 79 |
28 Sep 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Preventif mekanik sistem di Ccsu Sementara kondisi masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 80 |
26 Sep 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Wire rope closing rantas 3kwt/str 6d=6kwt di dllc 4
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 81 |
26 Sep 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Oli gate hopper DLLC 3 sebelah darat oli berkurang perlu penambahan
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
Medium 130000019094 |
Completed |
||
| 82 |
26 Sep 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Program inspeksi mekanikal sistem DLLC 3 & 4
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 83 |
24 Sep 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Pintu ruang panel P1B bolong, indikasi terdapat rembesan dari tumpahan air dari bagian bawah karena kanopi pintu sudah korosi dan bolong. Req. Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019252 |
In Process |
||
| 84 |
24 Sep 2026
Oka Aulia Yusuf
|
Conveyor A103
CIGADING 2
|
Roll pembalik no 74 bagian merak tabungnya patah di A103. Request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018859 |
In Process |
||
| 85 |
23 Sep 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
Wire rope counterweight rantas 3kwt/str 6d=6kwt di phc 2. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 86 |
23 Sep 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
Wire rope counterweight rantas 2kwt/str 6d=6kwt di phc 1. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 87 |
22 Sep 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Preventif mekanik sistem di Area 102
Untuk mekanik sistem roll, belt dan dram kondisi masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 88 |
19 Sep 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Belt feeder di gsu 04 indikasi terkelupas pinggirannya
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019017 |
In Process |
||
| 89 |
19 Sep 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Preventif mekanik sistem di Gsu 04
Untuk wire rope, pulley dan brake sytem |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 90 |
17 Sep 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wire rope maintrolley alur kanan rantas 3 kwt/str 6d=8kwt di gsu 5. Pantau
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 91 |
17 Sep 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wire rope closing rantas 3kwt/str kondisi dekat dengan mangkok/socket di GSU 5. Pantau
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 92 |
17 Sep 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Kondisi gearbox holding ad yg gompal di gsu 5. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 93 |
17 Sep 2026
Oka Aulia Yusuf
|
Conveyor A101
CIGADING 2
|
Karet legging drum tail pulley bagian pinggir darat ad yg terkelupas di A101. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018999 |
In Process |
||
| 94 |
17 Sep 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Preventif mekanik sistem Grabe dan Conveyor 101
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 95 |
17 Sep 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Kondisi gearbox Closing GSU 05
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 96 |
17 Sep 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Kondisi gearbox Closing GSU 6.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 97 |
17 Sep 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Kondisi gearbox holding ad yg gompal di gsu 5
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 98 |
16 Sep 2026
M. Zainudin
|
DLLC-02
CIGADING 1
|
Karat stokbar gentrie dllc 02 indikasi pecah
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 99 |
16 Sep 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Fiber pengarah wire rope closing ad yg pecah 1 pcs & yg macet 6 pcs di dllc 1. Req ganti
|
LAIK PAKAI
REQUEST GANTI
|
Medium 130000018982 |
Completed |
||
| 100 |
14 Sep 2026
Oka Aulia Yusuf
|
DLLC-04
CIGADING 1
|
Handrail hopper bagian laut rusak di dllc 4. Req repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000018983 |
Completed |
||
| 101 |
14 Sep 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Kondisi mekanik sistem seperti wire rope, bearing dan pulley
Sementara masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 102 |
14 Sep 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Gear Slweing kering. Request lubrikasi di dllc 03
|
RELEASE
REQUEST SERVICE
|
Medium | Completed |
||
| 103 |
08 Sep 2026
M. Zainudin
|
Grabe Cigading 2
CIGADING 2
|
Pengecekan wire rope grab all cigading 2 kondisi masih aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 104 |
08 Sep 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
A101 roll pembalik no187 bagian darat patah
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018863 |
In Process |
||
| 105 |
08 Sep 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Wire rope auxtrolley rantas yg alur kiri sebelah anyer 2kwt/str 6d=2kwt di GSU 5
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 106 |
08 Sep 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Wire rope maintrolley alur kanan rantas 3kwt/str 6d=4kwt di gsu 5
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 107 |
08 Sep 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
GSU 6 Pulley holding area pivot sebelah anyer lasan retak
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000019249 |
In Process |
||
| 108 |
07 Sep 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
GSU 4 wire rope auxtrolley rantas 5kwt/strnd-20kwt/6d
|
RELEASE
BY EXECUTOR
|
Medium 130000018966 |
Completed |
||
| 109 |
05 Sep 2026
M. Zainudin
|
PHC-02
CIGADING 1
|
Wire rope counterweight rantas 4 kwt/str 6d=4kwt di phc 2. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 110 |
04 Sep 2026
M. Zainudin
|
Conveyor BCNO
CIGADING 1
|
Baud brake tromol indikasi patah dan rusak
|
RELEASE
REQUEST GANTI
|
Medium 130000018967 |
Completed |
||
| 111 |
03 Sep 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Gear slewing DLLC 1 kering request lubrikasi
|
LAIK PAKAI
REQUEST PENAMBAHAN
|
- 130000018774 |
Completed |
||
| 112 |
01 Sep 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Wire rope closing rantas tiga kawat/strand total 5kawat 6D Pantau
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 113 |
01 Sep 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Pengecekan grabe dllc 04 kondisi sementara masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 114 |
31 Aug 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Pinlok O-ring indikasi patah di gsu 04 request repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000018851 |
Completed |
||
| 115 |
31 Aug 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Conection closing aus bag anyer request ganti di gsu 04
|
RELEASE
REQUEST GANTI
|
Medium 130000018850 |
Completed |
||
| 116 |
31 Aug 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
GSU 4 wire rope maintrolley alur kanan sebelah merak rantas 3kwt/strnd-12kwt/6d (ganti)
|
RELEASE
REQUEST GANTI
|
Medium 130000018849 |
Completed |
||
| 117 |
31 Aug 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
GSU 4 wire rope spring rantas 4kwt/strnd-20kwt/6d ( ganti)
|
RELEASE
REQUEST GANTI
|
Medium 130000018848 |
Completed |
||
| 118 |
31 Aug 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
Stop bar maintrolley bagian waterside(ws) anyer pecah/rusak di gsu 1. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018846 |
Completed |
||
| 119 |
31 Aug 2026
Oka Aulia Yusuf
|
Grabe Cigading 1
CIGADING 1
|
Wire rope grab C3 rantas 8kwt/str 6d=25kwt posisi grab di gsu 1. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018847 |
Completed |
||
| 120 |
31 Aug 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
Ruang panel room elektrik atapnya jebol (ditakutkan kemasukan tikus/air), rekues repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017157 |
In Process |
||
| 121 |
31 Aug 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Dram Bend head 2 leginganya terkelupas di conveyor A103
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018854 |
In Process |
||
| 122 |
31 Aug 2026
M. Zainudin
|
Dermaga 6
CIGADING 2
|
Cover bandul countriwek 103 indikasi korosi
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018853 |
In Process |
||
| 123 |
31 Aug 2026
M. Zainudin
|
Dermaga 6
CIGADING 2
|
Baud dan Kontruksi 103 area countriwek indikasi korosi request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018852 |
In Process |
||
| 124 |
31 Aug 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Roll pembalik no 76 indikasi belah jadi 2 di area conveyor A103
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018651 |
In Process |
||
| 125 |
28 Aug 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Wire rope holding GSU 5 rantas 4kwt/strnd-12kwt/6d,
Jarak 5 meter dari grabe, masih ada sisa spare di drum request potong |
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018824 |
In Process |
||
| 126 |
28 Aug 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Pulley closing di area pifot bagian Anyer retak di GSU 5
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018826 |
In Process |
||
| 127 |
27 Aug 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 bresing no 657 sudah korosi
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018828 |
In Process |
||
| 128 |
27 Aug 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 bresing no 726 bagian anyer retak patah
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018827 |
In Process |
||
| 129 |
26 Aug 2026
M. Zainudin
|
Grabe Cigading 1
CIGADING 1
|
Wire rope grab G1 rantas 5kwt/str 6d=17kwt posisi grab di phc 1
|
RELEASE
REQUEST GANTI
|
Medium 130000018812 |
Completed |
||
| 130 |
26 Aug 2026
M. Zainudin
|
PHC-02
CIGADING 1
|
Wire rope countrwik rantas 3kwt/str 6d=5kwt di phc 2
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 131 |
26 Aug 2026
M. Zainudin
|
PHC-02
CIGADING 1
|
Baud runningwheel counterweight patah 1pcs di PHC 2
|
RELEASE
REQUEST GANTI
|
Medium 130000018822 |
Completed |
||
| 132 |
24 Aug 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Pintu motoroom indikasi rusak dan korosi
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 133 |
24 Aug 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Baud runningwheel counterweight patah 1pcs di PHC 1
|
LAIK PAKAI
REQUEST GANTI
|
- 130000018822 |
Completed |
||
| 134 |
20 Aug 2026
Oka Aulia Yusuf
|
TFH & Feeding
CIGADING 2
|
Roll top no 54 arah darat macet di TFH. Request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 135 |
15 Aug 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
GSU 6 Maintrolley rantas 1kwt/strnd - 2kwt/6D
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 136 |
15 Aug 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Kontruksi landsed indikasi retak lasnya request repair di gsu 06
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 137 |
14 Aug 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Spandek kontruksi indikasi sobek dan bolong request repair di dermaga D 1.4
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 138 |
14 Aug 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
Preventif mekanik sistem di PBCN 1 dan 2
Kondisi mekanik sistem masih oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 139 |
13 Aug 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 542 bag merak tabungnya bolong A102
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018648 |
In Process |
||
| 140 |
13 Aug 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 488 bag merak tabungnya bolong A102
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018648 |
In Process |
||
| 141 |
12 Aug 2026
Oka Aulia Yusuf
|
DLLC-02
CIGADING 1
|
Stopbar gantry hopper bagian laut pecah di DLLC 2. Request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018730 |
In Process |
||
| 142 |
12 Aug 2026
Oka Aulia Yusuf
|
DLLC-02
CIGADING 1
|
Stopbar gantry hopper bagian darat pecah di DLLC 2. Request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018729 |
Completed |
||
| 143 |
08 Aug 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Kampas brake sistem closing bagian merak tipis di phc 2
|
RELEASE
REQUEST GANTI
|
Medium 130000018685 |
Completed |
||
| 144 |
08 Aug 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
PHC 1 filter oli gate Hopper kotor request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018683 |
In Process |
||
| 145 |
08 Aug 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Shafe roll boom indikasi tidak peresisi
|
RELEASE
REQUEST REPAIR
|
Medium 130000018684 |
Completed |
||
| 146 |
08 Aug 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Baud counter weight indikasi patah
|
RELEASE
REQUEST GANTI
|
Medium 130000018686 |
Completed |
||
| 147 |
08 Aug 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
Kampas brake sistem closing bagian merak tipis di phc 2. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018685 |
Completed |
||
| 148 |
07 Aug 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
Preventif mekanik sistem di conveyor PBFC 1&2
Kondisi sementara masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 149 |
06 Aug 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 608 bagian merak & anyer tabungnya patah di A102. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018648 |
In Process |
||
| 150 |
06 Aug 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Roll top no 681 bag merak macet di A102. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018647 |
In Process |
||
| 151 |
05 Aug 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Preventive Mekanik system di area CCSU, sementara kondisi masih OK.
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 152 |
03 Aug 2026
Oka Aulia Yusuf
|
DLLC-03
CIGADING 1
|
Stopbar gantry bagian darat pecah di DLLC 3. Request ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018696 |
In Process |
||
| 153 |
01 Aug 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
GSU 1 plat talang trucking retak & tipis (ganti)
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 154 |
01 Aug 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
GSU 4 kampas brake holding tipis sebelah (ganti)
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 155 |
30 Jul 2026
Oka Aulia Yusuf
|
Conveyor A101
CIGADING 2
|
A101 roll top no 1 tail sebelah darat macet (ganti)
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 156 |
29 Jul 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Dinding di motor room bagian anyer ad yg bolong di dllc 1. Req repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 157 |
29 Jul 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wire rope maintrolley alur kiri rantas 3 kwt/str 6d=14kwt di gsu 5. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 158 |
28 Jul 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Wire rope grabe P7 rantas 4 kwt/str 6d=10kwt posisi grabe di gsu 06
|
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 159 |
28 Jul 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Pulley landside bagian merak lasan retak di GSU6
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 160 |
25 Jul 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Buat tromol brake closing bagian kanan tidak ada 2pcs di GSU 4
|
RELEASE
REQUEST REPAIR
|
Medium 130000018606 |
Completed |
||
| 161 |
25 Jul 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Wire rope grab C2 rantas 4kwt/str 6d=20kwt posisi grab di gsu 4
|
RELEASE
REQUEST GANTI
|
Medium 130000018605 |
Completed |
||
| 162 |
25 Jul 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Preventif mekanik program shutdown inspection GSU 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 163 |
24 Jul 2026
M. Zainudin
|
Feeding SGT
CIGADING 1
|
Preventif mekanik system di feeding SGT
Kondisi bucket sebelah darat belum di ganti Reducer kondisi Oke Fieder kondisi Oke |
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018390 |
In Process |
||
| 164 |
22 Jul 2026
M. Zainudin
|
Tower 2
CIGADING 1
|
Baud Tromol brake BCNO & C02 indikasi kendor dan patah di area tower 2. 130000018212[BCN0], 130000018581 [C02]
|
RELEASE
REQUEST GANTI
|
Medium 130000018212 |
Completed |
||
| 165 |
20 Jul 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Preventif mekanik sistem di Ccsu
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 166 |
18 Jul 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
DLLC 3 Oli gearbox holding-closing keruh & berbusa (130000017862 [holding], 130000017866 [closing], 130000017863 [holding DLLC-04], 130000017867 [closing DLLC-04]
|
RELEASE
REQUEST GANTI
|
Medium 130000017862 |
Completed |
||
| 167 |
16 Jul 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Karet legging drum head pulley(shuttle) bagian pinggir anyernya tipis di A103
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018594 |
In Process |
||
| 168 |
16 Jul 2026
M. Zainudin
|
TFH & Feeding
CIGADING 1
|
Reducer di tfh oli nya rembes
|
RUSAK RINGAN
REQUEST PENAMBAHAN
|
Medium 130000018593 |
In Process |
||
| 169 |
16 Jul 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Roll top no 65 bagian laut macet di tfh
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018592 |
In Process |
||
| 170 |
16 Jul 2026
M. Zainudin
|
TFH & Feeding
CIGADING 2
|
Preventive mekanik program di conveyor A103 & tfh, running inspection pengecekan belt, drum, roll top & roll pembalik
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 171 |
15 Jul 2026
M. Zainudin
|
DLLC-02
CIGADING 1
|
DLLC 2 oli gearbox holding-closing berbusa keruh kondisi sudah tidak layak pakai. 130000017861 [holding], 130000017861 [closing]
|
KOTOR
REQUEST BERSIHKAN
|
Medium 130000017861 |
In Process |
||
| 172 |
15 Jul 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Preventive mekanik program di dllc 1, running inspection pengecekan wire rope holding & closing kondisi masih aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 173 |
15 Jul 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Preventive mekanik program di dllc 1, running inspection pengecekan kampas brake sistem holding, closing & luving kondisi masih aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 174 |
14 Jul 2026
M. Zainudin
|
Grabe Cigading 2
CIGADING 2
|
Grabe P4 lubang shaft lengan grabe bawah terkikis
|
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 175 |
14 Jul 2026
Oka Aulia Yusuf
|
Grabe Cigading 2
CIGADING 2
|
Grabe P4 lubang shaft lengan grabe bawah terkikis (repair)
|
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 176 |
14 Jul 2026
Oka Aulia Yusuf
|
Conveyor A101
CIGADING 2
|
Karet legging drum bend head shuttle ada yg terkelupas di A101. Req repair
|
RUSAK BERAT
REQUEST REPAIR
|
Medium | Outstanding |
||
| 177 |
13 Jul 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Blade screw lepas 4 & banyak yang kendor
|
LAIK PAKAI
REQUEST FABRIKASI
|
- 130000018559 |
Completed |
||
| 178 |
13 Jul 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Cover shaft cc1 sebelah kanan terkikis mengakibatkan kan matrial bocor
|
LAIK PAKAI
REQUEST REPAIR
|
- 130000018547 |
Completed |
||
| 179 |
13 Jul 2026
M. Zainudin
|
CCSU
CIGADING 1
|
CCSU, braket cc1 retak sebelah kanan
|
LAIK PAKAI
REQUEST REPAIR
|
- 130000018474 |
Completed |
||
| 180 |
11 Jul 2026
M. Zainudin
|
PHC-02
CIGADING 1
|
Preventif mekanik program shutdown inspection mekanikal sistem PHC 1 & 2
- discharging sistem - gantry umit - holding-closing - slewing - luffing - counter weight Wire rope counter weight phc 1 (pantau) over all ok |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 181 |
11 Jul 2026
Oka Aulia Yusuf
|
PHC-01
CIGADING 1
|
Wire rope counter weight rantas 2kwt/str 6d=6kwt di phc 1. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 182 |
11 Jul 2026
Oka Aulia Yusuf
|
Grabe Cigading 1
CIGADING 1
|
Wire rope grab G1 rantas 3kwt/str 6d=5kwt posisi grab di phc 1. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 183 |
10 Jul 2026
M. Zainudin
|
Feeding SGT
CIGADING 1
|
Feeding, bucket elevator sebelah darat pecah 20pcs
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018390 |
In Process |
||
| 184 |
09 Jul 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wire rope auxtrolley rantas 2kwt/str 6d=5kwt di gsu 5. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 185 |
09 Jul 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 roll pembalik sebelah anyer no 508 bolong
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018434 |
In Process |
||
| 186 |
09 Jul 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Rell trolley gsu 06 indikasi Retak lasnya arah merak
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018524 |
In Process |
||
| 187 |
08 Jul 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Karet legging drum belt feeder bagian darat ad yg terkelupas di gsu 4. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018521 |
In Process |
||
| 188 |
08 Jul 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Sambungan belt feeder ad yg terkelupas di gsu 4. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018522 |
In Process |
||
| 189 |
07 Jul 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Preventif mekanik sistem di area 103 sementara kondisi masih Aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 190 |
07 Jul 2026
M. Zainudin
|
Conveyor A103
CIGADING 1
|
Pengukuran suhu Bearing drive sampai Tailpulley area conveyor 103
Sementara kondisi Ready to use |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 191 |
06 Jul 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Preventif mekanik pengecekan mekanikal sistem DLLC1
Kondisi Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 192 |
06 Jul 2026
Oka Aulia Yusuf
|
DLLC-02
CIGADING 1
|
Kampas brake luffing terlalu rapet di DLLC 2. Request setting
|
LAIK PAKAI
REQUEST SERVICE
|
- 130000018523 |
Completed |
||
| 193 |
02 Jul 2026
M. Zainudin
|
GSU-05
CIGADING 2
|
Wire rope holding rantas 6kwt/str 6d=10kwt di gsu 05. Req potong
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018451 |
In Process |
||
| 194 |
02 Jul 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Preventif mekanik sistem di Grabe dan conveyor 101 sementara masih Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 195 |
02 Jul 2026
M. Zainudin
|
GSU-06
CIGADING 1
|
Wire rope holding rantas 4kwt/str 6d=15kwt di gsu 6.
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018015 |
In Process |
||
| 196 |
01 Jul 2026
Oka Aulia Yusuf
|
DLLC-04
CIGADING 1
|
Wire rope closing rantas 2kwt/str 6d=4kwt di dllc 4. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 197 |
30 Jun 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Belt conveyor A102 indikasi pinggirannya Sobek
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018525 |
In Process |
||
| 198 |
29 Jun 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Dinding motor room PHC 1 korosi bolong repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017589 |
Completed |
||
| 199 |
27 Jun 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Grabe C3 fisik bengkok mekar (request ganti) posisi di gsu 1
|
RELEASE
REQUEST GANTI
|
Medium 130000018309 |
Completed |
||
| 200 |
27 Jun 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
PBCN 2 belt conveyor sobek (repair)
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018393 |
In Process |
||
| 201 |
26 Jun 2026
M. Zainudin
|
Feeding SGT
CIGADING 1
|
Bucket elevator sebelah darat feeding SGT pecah 20 pcs & tipis 30 pcs (request ganti)
|
RELEASE
REQUEST GANTI
|
Medium 130000018390 |
Completed |
||
| 202 |
25 Jun 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Preventif mekanik sistem di Conveyor 102
Kondisi Roll Top dan pembalik kondisi Oke Belt conveyor kondisi Oke Dram leaging kondisi Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 203 |
25 Jun 2026
Oka Aulia Yusuf
|
CCSU
CIGADING 1
|
Program preventif mekanik NDT chain CC2
-Di tambah sebelum nya jadi total NDT 124 titik (100℅) -Yang terindikasi lasan retak 50 titik (40.3℅) |
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 204 |
22 Jun 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Anak Tangga grabe G4 indikasi Patah 2pcs
Posisi grabe di Dllc 01 |
RELEASE
REQUEST GANTI
|
Medium 130000018350 |
Completed |
||
| 205 |
22 Jun 2026
Oka Aulia Yusuf
|
Grabe Cigading 1
CIGADING 1
|
Wire rope grab G2 rantas 4kwt/str 6d=15kwt. Request ganti (posisi grab di DLLC 2)
|
RELEASE
REQUEST GANTI
|
Medium 130000017945 |
Completed |
||
| 206 |
20 Jun 2026
Oka Aulia Yusuf
|
Grabe Cigading 2
CIGADING 2
|
Wire rope grab p4 rantas 9kwt/str 6d=9kwt posisi grab ad di kade cgd 2. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018339 |
In Process |
||
| 207 |
18 Jun 2026
Oka Aulia Yusuf
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 544 bag merak tabungnya bolong di A102. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018201 |
In Process |
||
| 208 |
13 Jun 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Cover bearing pulley auxtrolley bagian anyer lepas di auxtrolley unit gsu 4. Req repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000018244 |
Completed |
||
| 209 |
13 Jun 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Belt feeder bagian pinggir/anyer ada yg terkelupas di gsu 4. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018310 |
In Process |
||
| 210 |
10 Jun 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Baud runningwheel counterweight sebelah kiri-Kanan patah 4pcs di PHC 1. Request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018306 |
Completed |
||
| 211 |
10 Jun 2026
Oka Aulia Yusuf
|
Grabe Cigading 1
CIGADING 1
|
Wire rope grab G3 rantas 11kwt/str 6d=30kwt posisi grab di phc 2. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018305 |
Completed |
||
| 212 |
10 Jun 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
Running wheel gate hopper bagian darat/anyer rusak 4 pcs di phc 2. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018331 |
In Process |
||
| 213 |
10 Jun 2026
Oka Aulia Yusuf
|
PHC-02
CIGADING 1
|
Fiber pengarah wire rope closing bagian laut lepas/rusak di phc 2. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018330 |
Completed |
||
| 214 |
09 Jun 2026
Oka Aulia Yusuf
|
Conveyor A103
CIGADING 2
|
Roll top no 44 & 65 bagian anyer bearing nya rusak di A103. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018203 |
In Process |
||
| 215 |
09 Jun 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Pengecekan di area 103
Kondisi Roll Oke Kondisi Belt Oke Kondisi suhu Bearing Oke Dan kondisi Mekanik sistem Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 216 |
08 Jun 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Running wheel gate hopper bagian darat/laut rusak 12 pcs di dllc 1. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018326 |
In Process |
||
| 217 |
06 Jun 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Safety pulley maintrolley di area pivot bagian anyer lasannya lepas di GSU-05. Request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018251 |
In Process |
||
| 218 |
06 Jun 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Roll preventing bagian anyer/laut bearingnya rusak di maintrolley unit gsu 5. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018247 |
In Process |
||
| 219 |
05 Jun 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Penambahan NDT 33 titik dan indikasi krack bertambah 14 titik
Total untuk sementara dari 124 titik yang terNDT 88 titik dan terindikasi krack 32 titik |
RELEASE
REQUEST REPAIR
|
Medium 130000018269 |
Completed |
||
| 220 |
04 Jun 2026
Oka Aulia Yusuf
|
CCSU
CIGADING 1
|
Program NDT chain CC2
Dari total 124 titik chain, 55 titik di NDT terindikasi krack 18 titik. Request ganti |
RELEASE
REQUEST GANTI
|
Medium 130000018269 |
Completed |
||
| 221 |
03 Jun 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Grabe J1, wire rope grabe rantas 5kwt/strnd = 6d/13kwt posisi grabe di Dllc 3
|
RELEASE
REQUEST GANTI
|
Medium 130000018327 |
Completed |
||
| 222 |
03 Jun 2026
Oka Aulia Yusuf
|
Grabe Cigading 1
CIGADING 1
|
Grab J4 anak tangga nya lepas 2pcs posisi grab di dllc 4. Req repair
|
LAIK PAKAI
REQUEST REPAIR
|
- 130000018216 |
Completed |
||
| 223 |
03 Jun 2026
M. Zainudin
|
DLLC-03
CIGADING 1
|
Kondisi dinding motor room DLLC-03 keropos. Req. Repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017469 |
Completed |
||
| 224 |
02 Jun 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
GSU 04 wire rope auxtrollely rantas 2kwt/strnd - 2kwt/6d
|
RUSAK RINGAN
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 225 |
02 Jun 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll Pembalik indikasi Bearing Rusak di Area 102 bagian anyer no 616 request ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018201 |
In Process |
||
| 226 |
02 Jun 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll Top indikasi Bearing Rusak di Area 102 bagian anyer request ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018200 |
In Process |
||
| 227 |
02 Jun 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Cover bearing pulley auxtrolley bagian anyer lepas di auxtrolley unit gsu 4. Req repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 228 |
30 May 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
Kondisi kontruksi dinding gilder bagian darat/merak ada yg bolong di gsu 1. Req repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 229 |
30 May 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
Handrail bagian land side darat/merak ada yg rusak di gsu 1. Req repair
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 230 |
30 May 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
gearbox holding oli nya di bwh level min di gsu 1. Req tambah oli
|
RELEASE
REQUEST PENAMBAHAN
|
Medium | Completed |
||
| 231 |
29 May 2026
M. Zainudin
|
Conveyor C02
CIGADING 1
|
Kondisi oli reducer drive conveyor C02 kondisi Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 232 |
29 May 2026
M. Zainudin
|
Tower 2
CIGADING 1
|
Oli reducer drive conveyor BCNO arah Darat-Laut indikasi Kotor &Berbusa request Ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000018182 |
Completed |
||
| 233 |
29 May 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
Clening magnet elevator di Pbcn 01&02 sementara kondisi Oke
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 234 |
29 May 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
Belt conveyor Pbcn 02 indikasi Terkelupas request repair
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018184 |
In Process |
||
| 235 |
26 May 2026
Oka Aulia Yusuf
|
Conveyor A103
CIGADING 2
|
Roll pembalik no 48 bag anyer tabungnya bolong di A103. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018003 |
In Process |
||
| 236 |
26 May 2026
Oka Aulia Yusuf
|
Conveyor A103
CIGADING 2
|
Roll pembalik no 51 bag merak gompal/rusak di A103. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018003 |
In Process |
||
| 237 |
25 May 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Preventif mekanik sistem di DLLC-04
wire rope holding-closing kondisi Oke Breake holding-closing kondisi Oke Lubrikasi kondisi Oke , Ready to use |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 238 |
23 May 2026
M. Zainudin
|
CCSU
CIGADING 1
|
"Hasil pengecekan preventif mekanik di area CC2 ditemukan 4 sovel patah, 3 sebelah kiri & 1 sebelah kanan. Request ganti"
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 239 |
22 May 2026
M. Zainudin
|
Conveyor C02
CIGADING 1
|
Baut tromol brake conv. C02 bagian merak patah 2pcs. Request ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017987 |
Completed |
||
| 240 |
22 May 2026
M. Zainudin
|
Conveyor BCNO
CIGADING 1
|
Baut tromol brake conv. BCNO bagian merak kendor 10pcs dan patah 2pcs (Request ganti).
|
RELEASE
BY EXECUTOR
|
Medium 130000017715 |
Completed |
||
| 241 |
21 May 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Preventif mekanik sistem di GSU-06
Wire rope kondisi Oke Brake holding-closing kondisi Oke Pulley holding-closing kondisi Oke Tell trolley kondisi Oke Wearing plate kondisi oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 242 |
21 May 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Kampas brake sistem closing bagian merak darat tipis di gsu 5. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 243 |
21 May 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Baut dudukan drum holding bagian anyer patah 1 pcs di gsu 5. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 244 |
21 May 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Baut dudukan drum holding bagian anyer patah 1 pcs di gsu 5. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium | Outstanding |
||
| 245 |
20 May 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Preventif mekanik sistem di CCSU
Kondisi mekanik sistem Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 246 |
19 May 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Preventif di conveyor A101
Kondisi oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 247 |
18 May 2026
M. Zainudin
|
Grabe Cigading 1
CIGADING 1
|
Preventif mekanik sistem di PHC 01 terdapat anak tangga grabe G1 patah
|
RELEASE
REQUEST REPAIR
|
Medium 130000014757 |
Completed |
||
| 248 |
18 May 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Preventif mekanik sistem di PHC 01
Wire rope grabe no G1 Indikasi rantas |
RELEASE
REQUEST GANTI
|
Medium 130000018127 |
Completed |
||
| 249 |
13 May 2026
M. Zainudin
|
DLLC-04
CIGADING 1
|
Preventif mekanik sistem di DLLC 04
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 250 |
12 May 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Preventif mekanik sistem di area 102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 251 |
11 May 2026
M. Zainudin
|
DLLC-02
CIGADING 1
|
Preventif mekanik sistem di DLLC 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 252 |
09 May 2026
M. Zainudin
|
Conveyor A103
CIGADING 2
|
Preventif mekanik sistem di area Conveyor A103
Sementara masih kondisi Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 253 |
07 May 2026
Oka Aulia Yusuf
|
CCSU
CIGADING 1
|
Dudukan Rell Chain CC2 yang rusak di Crane CSU.
|
RELEASE
REQUEST REPAIR
|
Medium 130000018054 |
Completed |
||
| 254 |
07 May 2026
Oka Aulia Yusuf
|
CCSU
CIGADING 1
|
Team Preventive Supporting Mekanik Executor dengan melakukan pengecekan dan pembukaan cover nomor 2 dan nomor 3 untuk memastikan kondisi chain, rel, dan shovel di area CC2. Kerusakan yang ditemukan sudah langsung di eksekusi Eksekutor Mekanik
|
RELEASE
REQUEST REPAIR
|
TIDAK 130000018054 |
Completed |
||
| 255 |
05 May 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
Supporting Team Vulkanisir Executor Repair Belt Feeder di GSU-04
|
RUSAK BERAT
PREVENTIVE MAINTENANCE
|
Medium 130000018012 |
In Process |
||
| 256 |
05 May 2026
Ayu Andini
|
CCSU
CIGADING 1
|
Pengecekan Preventive dan Supporting Team Mekanik Executor di CC2 CSU
|
RELEASE
PREVENTIVE MAINTENANCE
|
TIDAK | Completed |
||
| 257 |
05 May 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Rell Troley GSU-06 terindikasi retak lasannya di sebelah merak-anyer.
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017779 |
In Process |
||
| 258 |
05 May 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Sackle safety meja vibrating bagian anyer tipis di gsu 5. Req ganti
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018039 |
In Process |
||
| 259 |
04 May 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Brake system closing bagian anyer indikasi pegasnya retak di gsu 01
|
RELEASE
REQUEST GANTI
|
Medium 130000017880 |
Completed |
||
| 260 |
04 May 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Sambungan belt feeder ada yg terkelupas di gsu 4. Req repair
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018012 |
In Process |
||
| 261 |
04 May 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Karet skatebord gate bagian belakang lepas di gsu 4. Req repair
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000018013 |
In Process |
||
| 262 |
04 May 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Preventif mekanik sistem di conveyor 102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 263 |
01 May 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Preventive bearing drum dan motor reducer di area conveyor A102
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 264 |
30 Apr 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Suhu bearing drum sementara kondisi masih aman
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 265 |
30 Apr 2026
M. Zainudin
|
Conveyor C02
CIGADING 1
|
Baud tromol brake indikasi patah
|
RELEASE
REQUEST GANTI
|
Medium 130000017987 |
Completed |
||
| 266 |
28 Apr 2026
M. Zainudin
|
Conveyor PBCN 2
CIGADING 1
|
Belt conveyor terkelupas di PBCN-02. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017973 |
In Process |
||
| 267 |
25 Apr 2026
M. Zainudin
|
PHC-02
CIGADING 1
|
Oli gearbox holding closing luffing PHC-02 masih dalam kondisi baik
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 268 |
25 Apr 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Oli gearbox holding closing luffing PHC 1 masih dalam kondisi baik
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 269 |
25 Apr 2026
M. Zainudin
|
PHC-02
CIGADING 1
|
Pengecekan gearbox holding closing luffing PHC 2
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 270 |
25 Apr 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Pengecekan gearbox holding-closing PHC 1
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 271 |
23 Apr 2026
Oka Aulia Yusuf
|
Grabe Cigading 2
CIGADING 2
|
Wire rope grab P7 rantas 2kwt/str 6d=12kwt. Request ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017243 |
In Process |
||
| 272 |
23 Apr 2026
Oka Aulia Yusuf
|
Grabe Cigading 2
CIGADING 2
|
Wire rope grab C3 rantas 4kwt/str 6d=10kwt di cgd 2. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017957 |
In Process |
||
| 273 |
23 Apr 2026
Oka Aulia Yusuf
|
Grabe Cigading 2
CIGADING 2
|
Dinding bucket bagian laut grab C3 ada yg bolong di cgd 2. Req repair
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000017959 |
In Process |
||
| 274 |
23 Apr 2026
M. Zainudin
|
Grabe Cigading 2
CIGADING 2
|
Safety pulley pillowblock bagian atas anyer darat las-lasan lepas di grab P3 Cigading 2. Request repair
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000017958 |
In Process |
||
| 275 |
22 Apr 2026
M. Zainudin
|
Grabe Cigading 1
CIGADING 1
|
Grabe J1 posisi di DLLC 4, wire rope Grabe rantas 3kwt/strnd = 6d/13kwt request ganti.
(temuan sebelumnya : 02.04.2026) |
RELEASE
REQUEST GANTI
|
Medium 130000017775 |
Completed |
||
| 276 |
21 Apr 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Shutdown inspection gsu 6
Rail trolley lasan retak |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017779 |
In Process |
||
| 277 |
21 Apr 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Shutdown inspection gsu 6
Wearing plat lepas baut patah |
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017950 |
In Process |
||
| 278 |
21 Apr 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Shutdown inspection GSU 6
Stop bar gantry bagian darat-metak tidak ada/terlepas |
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017949 |
In Process |
||
| 279 |
21 Apr 2026
Oka Aulia Yusuf
|
GSU-05
CIGADING 2
|
Wire rope holding rantas 2kwt/str 6d=10kwt di gsu 5. Req ganti Di drum gk ada spare nya
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017947 |
In Process |
||
| 280 |
20 Apr 2026
Oka Aulia Yusuf
|
DLLC-01
CIGADING 1
|
Grease autolub berkurang di DLLC-01. Request penambahan
|
RELEASE
REQUEST PENAMBAHAN
|
PANTAU 130000017666 |
Completed |
||
| 281 |
20 Apr 2026
M. Zainudin
|
DLLC-01
CIGADING 1
|
Wire rope grab G2 rantas 3 kwt/str 6d=11kwt posisi grab ad di dllc 1. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017945 |
Completed |
||
| 282 |
18 Apr 2026
Oka Aulia Yusuf
|
GSU-04
CIGADING 1
|
Struktur Gantry GSU-04 korosi, req. Perbaikan
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018049 |
In Process |
||
| 283 |
18 Apr 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
GSU 4 gorden corong arah trucking lepas. Request Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017988 |
In Process |
||
| 284 |
18 Apr 2026
M. Zainudin
|
GSU-04
CIGADING 1
|
GSU-04 guide rell maintrolley bagian darat-merak indikasi bearing rusak/oblak. Req. Ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017922 |
Completed |
||
| 285 |
18 Apr 2026
Oka Aulia Yusuf
|
GSU-01
CIGADING 1
|
Girder boom bagian darat merak bolong indikasi korosi di GSU 1. Request repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017921 |
Completed |
||
| 286 |
17 Apr 2026
M. Zainudin
|
CONV BCNO
CIGADING 1
|
BCNO counter weight bolong korosi belum di perbaiki
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 287 |
17 Apr 2026
M. Zainudin
|
CONV C02
CIGADING 1
|
C02 tromol brake baut yang patah belum di ganti. Request Ganti
|
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 288 |
15 Apr 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
PHC 1 baut counter weight patah 2 pcs bagian bawah-darat request ganti. Langsung di eksekusi oleh tim Mekanik
|
RELEASE
REQUEST GANTI
|
Medium 130000017918 |
Completed |
||
| 289 |
14 Apr 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Leggingan drum bend head bagian merak di A102 sobek. Request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 290 |
14 Apr 2026
M. Zainudin
|
Grabe Cigading 2
CIGADING 2
|
Wire rope Grabe G2 rantas 2kwt/str 6d=7kwt posisi grab di dllc 1. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 291 |
13 Apr 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Brake system closing bagian anyer indikasi pegasnya retak di GSU-01. Req ganti
|
RELEASE
REQUEST GANTI
|
Medium 130000017880 |
Completed |
||
| 292 |
13 Apr 2026
M. Zainudin
|
GSU-01
CIGADING 1
|
Belt feeder Gsu-01 indikasi sobek request Repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017833 |
In Process |
||
| 293 |
31 Mar 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Inspeksi Ringdisk A101 Maret 2026
Head darat: ok Head laut: ok Bend head darat: ok Bend head laut : ok Snub head darat : ok Snub head laut: ok Drive darat : ok Drive laut: ok Snub drive darat: ok Snub drive laut: ok Bend 1 darat: ok Bend 1 laut: ok Bend 2 darat : ok Bend 2 laut: ok Bend 3 darat: ok Bend 3 laut: ok Take up 1 darat: ok Take up 1 laut: ok Take up 2 darat: ok Take up 2 laut: ok Tail darat: ok Tail laut : ok Catatan hasil pengecekan ringdisk A101 kondisi masih OK |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 294 |
31 Mar 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Wire rope closing rantas 2kwt/str 6d=3kwt di gsu 6. Pantau
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
PANTAU | Ready to Use |
||
| 295 |
31 Mar 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Rail trolley retak bagian kiri & kanan di gsu 6. Req repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium | Outstanding |
||
| 296 |
17 Mar 2026
M. Zainudin
|
CONV C02
CIGADING 1
|
Preventif mekanik sistem di area C02. indikasi baud tromol brake patah
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 297 |
17 Mar 2026
M. Zainudin
|
CONV BCNO
CIGADING 1
|
Preventif mekanik sistem di area BCNO, indikasi baud tromol brake patah.
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000017715 |
In Process |
||
| 298 |
13 Mar 2026
M. Zainudin
|
CCSU
CIGADING 1
|
CCSU tangga HLSKT patah request di perbaikan. Sudah di eksekusi oleh Mekanik Shift
|
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
- | Outstanding |
||
| 299 |
13 Mar 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Mengamankan patahan sovel CC2
CC2 sovel patah 1 pcs request ganti |
RELEASE
REQUEST GANTI
|
Medium | Completed |
||
| 300 |
13 Mar 2026
M. Zainudin
|
CCSU
CIGADING 1
|
Terdapat lubang pada dinding transfer material dari CC3 ke CC3 posisi di slip ring request perbaikan
|
RELEASE
REQUEST REPAIR
|
Medium | Completed |
||
| 301 |
12 Mar 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 roll pembalik bagian anyer no 502 macet "ganti"
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017536 |
In Process |
||
| 302 |
12 Mar 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 roll pembalik bagian anyer no 693 tabung patah "ganti"
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017536 |
In Process |
||
| 303 |
03 Mar 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Rell trolley gsu 06 indikasi Retak lasnya arah anyer. Request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000017587 |
In Process |
||
| 304 |
03 Mar 2026
M. Zainudin
|
GSU-06
CIGADING 2
|
Wire rope holding rantas 3 kwt/str 6d=10kwt di gsu 6. Request ganti(Potong)
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000017588 |
In Process |
||
| 305 |
02 Mar 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Pintu bagian belakang ruang motor room macet gak bisa ditutup akibat korosi. req perbaikan agar air hujan tidak masuk ke ruang motor room
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000017580 |
In Process |
||
| 306 |
02 Mar 2026
M. Zainudin
|
PHC-01
CIGADING 1
|
Kondisi ruang trafo PHC-01 terdapat bekas genangan air , ada kemungkinan bocor dari titik yang sama. Rekues repair
|
RELEASE
REQUEST REPAIR
|
Medium 130000017361 |
Completed |
| NO | Tanggal / Petugas | Lokasi | Keterangan Aktivitas | Kondisi & Rekomendasi | Notifikasi | Dokumentasi | Status | Aksi |
|---|---|---|---|---|---|---|---|---|
| 1 |
17 Nov 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Program running inspection conveyor 101
- konstruksi - belt conveyor - roll top, roll return - fram roll kondisi sementara masih Oke |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 2 |
14 Nov 2026
M. Zainudin
|
Conveyor BCNO
CIGADING 1
|
Program running inspection PBCN 1 & 2
- konstruksi - belt conveyor - roll top, roll return - fram roll - drum pulley - break sistem |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 3 |
14 Nov 2026
M. Zainudin
|
Conveyor BCNO
CIGADING 1
|
Program running inspection C02 & BCNO
- konstruksi - belt conveyor - roll top, roll return - fram roll - drum pulley - break sistem |
LAIK PAKAI
PREVENTIVE MAINTENANCE
|
TIDAK | Ready to Use |
||
| 4 |
05 Nov 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 641 bagian anyer macet di A102
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000019376 |
In Process |
||
| 5 |
05 Nov 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 656 bagian anyer bolong di A102
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000019376 |
In Process |
||
| 6 |
05 Nov 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Roll pembalik no 588 bagian anyer tabungnya patah di A102
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000019376 |
In Process |
||
| 7 |
29 Oct 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 roll pembalik anyar nomor 709 bolong
|
RUSAK RINGAN
REQUEST GANTI
|
No Priority 130000019140 |
In Process |
||
| 8 |
29 Oct 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
Inspeksi area line conveyor A102
Roll pembalik no 512 bagian merak tabungnya bolong di A102. Req (ganti) A102 roll pembalik anyar nomor 709 bolong ( ganti) |
RUSAK RINGAN
REQUEST GANTI
|
Low 130000019140 |
In Process |
||
| 9 |
08 Sep 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
A101 roll pembalik no 42 bagian laut indikasi bearing rusak
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018863 |
In Process |
||
| 10 |
08 Sep 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
A101 bresing no 210 sampai 190 sudah korosi
|
RUSAK BERAT
REQUEST REPAIR
|
Medium 130000019359 |
In Process |
||
| 11 |
04 Sep 2026
Oka Aulia Yusuf
|
Conveyor C02
CIGADING 1
|
Baut dudukan guide roll lepas bagian anyer di C02. Req pasang
|
RELEASE
BY EXECUTOR
|
Medium 130000018968 |
Completed |
||
| 12 |
27 Aug 2026
M. Zainudin
|
Conveyor A102
CIGADING 2
|
A102 bresing no 643 sudah korosi
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018828 |
In Process |
||
| 13 |
11 Aug 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Roll top no 134 bag darat bearingnya rusak di A101
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018647 |
In Process |
||
| 14 |
11 Aug 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Roll pembalik no 108 bag laut tabungnya bolong di A101. Req ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018645 |
In Process |
||
| 15 |
17 Jul 2026
M. Zainudin
|
Conveyor PBCN 2
CIGADING 1
|
Roll pembalik di pbcn 2 ada yg rusak/macet 14pcs
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018568 |
In Process |
||
| 16 |
17 Jul 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
Roll pembalik di pbcn 1 ada yg rusak/macet 16 pcs
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018566 |
In Process |
||
| 17 |
14 Jul 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Roll preventing rante magnet elevator indikasi bearing rusak
|
RUSAK RINGAN
REQUEST GANTI
|
Medium | Outstanding |
||
| 18 |
23 Jun 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Geat Roll Belt magnet sparator 101 indikasi Bearing rusak request ganti
|
RUSAK BERAT
REQUEST GANTI
|
Medium 130000018391 |
In Process |
||
| 19 |
23 Jun 2026
M. Zainudin
|
Conveyor A101
CIGADING 2
|
Belt magnet sparator 101 indikasi sobek request repair
|
RUSAK RINGAN
REQUEST REPAIR
|
Medium 130000018392 |
In Process |
||
| 20 |
29 May 2026
M. Zainudin
|
Conveyor PBCN 1
CIGADING 1
|
Brekeat roll top indikasi Lepas dan Bengkok Sementara di kita Amankan area Pbcn 01
|
RUSAK RINGAN
REQUEST GANTI
|
Medium 130000018183 |